Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Read Project

 37

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 

Accelerating data to market (Data Pitch)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Information technology has driven, directly or indirectly, much of Europe’s economic growth during the last decades as the role of data transitioned from the support of business decisions to becoming a good in itself. An open approach towards data value creation has become critical in the new networked economy, with Europe well placed to nurture this new revolution. However, to date Europe’s data ...
Read Project

 4

 FINISHED 
The demand for larger and more interconnected software systems is constantly increasing, but the ability of developers to satisfy it is not evolving accordingly. The most limiting factor is software validation, which typically requires very costly and complex testing processes. This project aims at significantly improving the efficiency and effectiveness of the testing process and, with it, the ov ...
Read Project

 11

 FINISHED 

CPSwarm

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Cyber-Physical Systems (CPS) find applications in a number of large-scale, safety-critical domains e.g. transportation, smart cities, etc. While the increased CPS adoption has resulted in the maturation of solutions for CPS development, a single consistent science of system integration for CPS has not yet been consolidated. Therefore CPS development remains a complex and error-prone task, often re ...
Read Project

 9

 FINISHED 
The SoundCity Project MONICA aims to provide a very large scale demonstration of multiple existing and new Internet of Things technologies for Smarter Living. The solution will be deployed in 6 major cities in Europe.MONICA demonstrates a large scale IoT ecosystem that uses innovative wearable and portable IoT sensors and actuators with closed-loop back-end services integrated into an interoperab ...
Read Project

 28

 FINISHED 
Current research efforts on 5G Radio Access Networks (RAN) strongly focus on mmWave access to realize enhanced mobile broadband (eMBB) services. However, there are many unsolved issues to deploy mmW ave 5G RAN. The most critical issue is backhauling since it is infeasible to provide 10 Gigabit Ethernet backhaul everywhere. Meanwhile, Mobile Edge Computing (MEC) have obtained much attention in 5G n ...
Read Project

 5

 FINISHED 

Interoperability of Heterogeneous IoT Platforms (INTER-IoT)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

INTER-IoT project is aiming at the design, implementation and experimentation of an open cross-layer framework and associated methodology to provide voluntary interoperability among heterogeneous Internet of Things (IoT) platforms. The proposal will allow developing effectively and efficiently smart IoT applications, atop different heterogeneous IoT platforms, spanning single and/or multiple appli ...
Read Project

 14

 FINISHED 

ACANTO: A CyberphysicAl social NeTwOrk using robot friends (ACANTO)

Start date: Feb 1, 2015, End date: Jul 31, 2018,

"Despite its recognised benefits, most older adults do not engage in a regular physical activity. The ACANTO project proposes a friendly robot walker (the FriWalk) that will abate a some of the most important barriers to this healthy behaviour.The FriWalk revisits the notion of robotic walking assistants and evolves it towards an activity vehicle. The execution of a programme of physical training ...
Read Project

 12

 FINISHED 

Safe and COnnected aUtomation in road Transport (SCOUT)

Start date: Jul 1, 2016, End date: Jun 30, 2018,

...d field tests. Alternative strategies for the implementation of automated driving will then be developed, under due consideration of different innovation cycles in the related industries (automotive, telecom, infrastructure, services) and the pending challenges regarding framework conditions (legal, testing & validation, safety & security). With regard to the perceived use cases for connected aut ...
Read Project

 12

 FINISHED 

Empowering citizens to make meaningful use of open data (Open4Citizens)

Start date: Jan 1, 2016, End date: Jun 30, 2018,

The project aims at shows the potential of open data to citizens, by creating open playgrounds where citizens, students, experts, start up companies, academia and public institutions can collaborate to generate meaningful applications. Thus, applications that meet citizens' needs and desires and contribute to their everyday life. The playground is a virtual and physical place where citizens, inter ...
Read Project

 8

 FINISHED 
Recent research activities in the ICT area, in particular in digital content and media sectors, has resulted in a number of technological enablers which allow the creation of new products and services. This has established a new converged social media environment in Europe as a playground for a large number of stakeholders, to ultimately enable creation of the related business, new jobs, and reven ...
Read Project

 9

 FINISHED 

5G Exchange (5GEx)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

... Infrastructure as a Service across multiple carriers; (iv) contributions to standards bodies of concepts learned during the development and experimentation of the project; (v) input to stimulate the telecom and IT industry stakeholders by actively promoting adoption of 5GEx’s open solutions.Such 5G infrastructure services will provide a crucial role in making 5G happen as they provide the foundat ...
Read Project

 20

 FINISHED 
An optical network, like any system, has to be observable before it can become controllable and be subject to optimization, and this is the first capability ORCHESTRA introduces. ORCHESTRA’s high observability relies on information provided by the coherent transceivers that are extended, almost for free, to operate as software defined multi-impairment optical performance monitors (soft-OPM). Infor ...
Read Project

 6

 FINISHED 
SoftFIRE+ partners are aiming at Research and Innovation actions pursuing the integration of existing experimental facilities, testbeds and laboratories into FIRE+. The project focuses on new technologies like SDN and NFV in order to create a reliable, secure, interoperable and programmable experimental network infrastructure within the FIRE+ initiative. The Consortium will federate existing exper ...
Read Project

 8

 FINISHED 
...ivity in Europe. Such new projects should also support the standardization activity by proposing additions or changes related to their objectives. Another key issue to address is whether the existing telecommunication infrastructure is sufficient to support in mass scale the new business cases and Smart Grid services. SmarterEMC2 implements ICT tools that support Customer Side Participation and RE ...
Read Project

 11

 FINISHED 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Start date: Jul 1, 2015, End date: Dec 31, 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Read Project

 21

 FINISHED 
The introduction of the electricity market, the widespread diffusion of distributed generation from renewable and non-programmable energy sources and the need for storage are quickly changing the problems that Transmission and Distribution system operators have to face in their activity and are requiring a “smarter” grid. A first step in this direction is the development and installation of a flex ...
Read Project

 12

 FINISHED 
...nfrastructures that will be “smarter,” fully virtualized, power vs. performance optimised, and vertically integrated with cloud computing, with a clear impact on OPEX and CAPEX of Telecoms, of Service Providers, and of end-users. The INPUT project will extend the programmability of network devices to make them able to host cloud service applications, which will cooperate with the ones in users’ te ...
Read Project

 9

 FINISHED 
...an vision of a low carbon electricity grid that minimises greenhouse gas emissions; and enhances security, quality and reliability of supply depends on how smart infrastructures, combining energy and telecom, are developed and implemented for the wider integration of security-aware distributed energy resources into the increasingly decentralised grid. MAS2TERING, a 3-year technology-driven and bus ...
Read Project

 9

 FINISHED 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Read Project

 24

 FINISHED 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Read Project

 19

 FINISHED 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Read Project

 18

 FINISHED 

Cloudopting (CloudOpting)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

Current situation\n\nThe Smart City concept and the idea of making an efficient use of the data generated by citizens in their daily activities have been around for almost a decade. In a middle-term view, cities were expected to turn into places where both everyday lives would be pretty much easier and connections between citizens much more useful.\n\nHowever, despite its potential, very few succe ...
Read Project

 11

 FINISHED 
Description NUBOMEDIA is an elastically scalable cloud infrastructure specifically devoted to the provision of real-time multimedia services.The most remarkable problem developer's face when creating real-time multimedia services is complexity. NUBOMEDIA proposition is to minimize complexity by creating a specific purpose cloud platform b ...
Read Project

 11

 FINISHED 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Read Project

 15

 FINISHED 
Multi-rate, multi-format and multi-reach operation of optical transceivers is important, but it is not enough for next generation terabit products. What is still missing to make these products viable is a solution for the flexible control of this enormous capacity at the optical layer and its distribution among a number of independent optical flows. PANTHER aims to provide this solution and develo ...
Read Project

 8

 FINISHED 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Read Project

 27

 FINISHED 

BRIDGING THE GAP FOR ENHANCED BROADCAST (BRIDGET)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Description BRIDGET is opening new dimensions for multimedia content creation and consumption by enhancing broadcast programmes with bridgets.  A bridget links from the programme you are watching to second screen, interactive media such as web pages, images, audio clips, different types of video (2D, multi-view, with depth information, free ...
Read Project

 9

 FINISHED 

Agile Service Engineering for the Future Internet (CloudWave)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

CloudWave will revolutionise modern cloud infrastructures and tools by enabling agile development and delivery of adaptive cloud services which dynamically adjust to changes in their environment so as to optimise service quality and resource utilization. In doing so, CloudWave will advance the competitiveness of the EU economy by providing a powerful foundation, based on open standards, for creati ...
Read Project

 15

 FINISHED 

Future Internet - Core (FI-Core)

Start date: Sep 1, 2014, End date: Sep 30, 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Read Project

 33

 FINISHED 
ALMANAC will develop a service delivery platform with corresponding technologies that integrates Internet of Things (IoT) edge networks (termed capillary networks) with Telco's metro access networks thus enabling an integrated Smart City Information System for green and sustainable Smart City applications.The Smart City Platform (SCP) collects, aggregates, and analyses real-time or near real-time ...
Read Project

 7

 FINISHED 

Unifying Cloud and Carrier Networks (UNIFY)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Read Project

 16

 FINISHED 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Read Project

 17

 FINISHED 
DISCUS will analyse, design, and demonstrate a complete end-to-end architecture and technologies for an economically viable, energy efficient and environmentally sustainable future-proof optical network. It will provide a revolution in communications networks applicable across Europe and the wider world exploiting to the full the opportunity offered by LR-PONS and flat optical core networks to pro ...
Read Project

 12

 FINISHED 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Read Project

 34

 FINISHED 
...EPID technological components (Indoor Home networks, Supervisory control strategies and Energy Brokerage);B.\tIntegration and validation of the integrated system: the system will be tested in RSE and Telecom Italia labs and it will be installed and validated in real houses. The installation in real buildings will involve 50 homes, partly located in Italy and partly located in Denmark. The system w ...
Read Project

 8

 FINISHED 
The goal of NEMESYS is to research and develop novel security technologies for seamless service provisioning in the smart mobile ecosystem. Mobile and smartphone security is a fast moving field, where new vulnerabilities and resulting attacks need to be detected and analyzed as fast as possible. The attacker is always a step ahead, managing to obtain vast amounts of information by hacking computer ...
Read Project

 7

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 
...e an innovative low-cost highly performing field installable connectivity system that will impact at a multi-million-euro scale the capital expenditure (CAPEX) and the operation expenditure (OPEX) of telecom fiber broadband networks and that will facilitate the achievement of the European 2020 objectives for broadband connectivity.The VECTOR connectivity system will comprise a ferrule-less connect ...
Read Project

 7