Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Read Project

 6

 FINISHED 
SMARTER TOGETHER’s overarching vision is to find the right balance between smart technologies and organizational/ governance dimensions in order to deliver smart and inclusive solutions and to improve citizen’s quality of life.SMARTER TOGETHER gather the European Lighthouse cities Lyon, Munich, Vienna, the Follower cities Santiago de Compostela, Sofia, Venice and Kyiv and Yokohama as observer citi ...
Read Project

 30

 FINISHED 

Composable Models and Software for Robotics Systems (RobMoSys)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

RobMoSys will coordinate the whole community’s best and consorted effort to build an open and sustainable, agile and multi-domain European robotics software ecosystem.RobMoSys envisions an integration approach built on-top-of, or rather around, the current code-centric robotic platforms, by means of the systematic application of model-driven methods and tools that explicitly focus on (system-of-) ...
Read Project

 9

 FINISHED 

Big Data Value ecosystem (BDVe)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Read Project

 11

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 
The main objective of this proposal is to develop reliable GaN-based power devices and systems for high and medium power electronics targeting industrial and automotive applications and bringing the GaN power devices another step towards the wide usability in the energy saving environment to further tap the full potential which this new material brings along.This proposal addresses two subjects, o ...
Read Project

 11

 FINISHED 
In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Read Project

 35

 FINISHED 
Requirements engineering is a key activity in ICT projects: What are current user needs and what requirements satisfy them? How much effort would a requirement cost and in which release should it be delivered? Which requirements can be reused from similar projects? Are there hidden dependencies or inconsistencies? What trade-offs are acceptable for users and other stakeholders? A satisfactory, eff ...
Read Project

 9

 FINISHED 

Dependability Engineering Innovation for CPS - DEIS (DEIS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Cyber-Physical-Systems harbor the potential for vast economic and societal impact in all major application domains, however in case of failure this may lead to catastrophic results for industry and society. Thus, ensuring the dependability of such systems is the key to unlocking their full potential and enabling European industries to develop confidently business models that will nurture their soc ...
Read Project

 10

 FINISHED 
The OPENHYBRID project will overcome the technical and commercial barriers of current hybrid manufacturing systems to deliver a single manufacturing system capable of undertaking a wider range of processes in a seamless automated operation. The new system will offer unrivalled flexibility in terms of materials, including the ability to switch between powder and wire feed-stock within a single part ...
Read Project

 14

 FINISHED 
The overall objective of PARADDISE project is to rationalize, to structure and to make available to the stakeholders of manufacturing value chain the knowledge and the tools for combining two antithetical processes: Laser Metal Deposition (LMD) and Machining (milling and turning). The project will develop expert CAx technologies, smart components and monitoring and control systems tailored for the ...
Read Project

 8

 FINISHED 
Despite the proclaimed benefits (i.e. scalability, reliability, cost-effectiveness) of Future Internet (FI) technologies (i.e. edge & cloud computing, IoT/CPS) for factory automation, their adoption from manufacturers remains low for various reasons, including technology issues (e.g., poor situation awareness, limited deployments, no standards-based reference implementations) and the lack of a smo ...
Read Project

 12

 FINISHED 

Future Improvement for Energy and Noise (FINE 1)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The FINE 1 project aims to reduce operational costs of railways by a reduction of energy use and noise related to rail traffic. The project results are expected to enable an increase of traffic in Europe and to enhance the attractiveness of railway in relation to other modes of transport. The project activities will support the innovation process within the S2R Technical Demonstrators (TDs) by p ...
Read Project

 9

 FINISHED 
X2Rail-1 addresses the S2R-CFM-IP2-01-2015 “Start-up activities for Advanced Signalling and Automation System” call issued by the Shift2Rail Joint Undertaking as part of the Innovation Programme 2 “Advanced Traffic Management & Control Systems”.The X2Rail-1 project aims to research and develop six selected key technologies to foster innovations in the field of railway signalling and automation sys ...
Read Project

 22

 FINISHED 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Read Project

 22

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 

Action Plan for the future of Mobility in Europe (MOBILITY4EU)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Global socio-economic and environmental megatrends are urging for a paradigm shift in mobility and transport that involves disruptive technologies and multimodal solutions. The individual transport sectors face diverse technical and non-technical requirements and rather individual, sometimes contradicting challenges. An action plan for the coherent implementation of innovative transport and mobili ...
Read Project

 20

 FINISHED 
The share of renewable energy is growing rapidly driven by the objective to reduce greenhouse gas emissions. The amount of electric power which can be supplied to the grid depends on the time of the day and weather conditions. A conventional fleet of thermal power plants is required to compensate for these fluctuations before large scale energy storage technologies will be mature and economically ...
Read Project

 23

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
Additive manufacturing (AM) has been highlighted as a key technology with potential for creating sustainable high value European based employment, addressing societal issues and supporting environmental sustainability. It has the potential to revolutionize the way in which products are manufactured and delivered to the customer. Moreover, AM is already having a high economic impact on several sec ...
Read Project

 13

 FINISHED 
...osed systems and lower market entry barriers for developers.The BIG IoT consortium is well suited to reach the outlined goals, as it comprises all roles of an IoT ecosystem: resource providers (e.g., SIEMENS, SEAT), service and application developers (e.g., VODAFONE, VMZ), marketplace providers (e.g., ATOS), platform providers (e.g., BOSCH, CSI, ECONAIS), as well as end users connected through the ...
Read Project

 14

 FINISHED 

IP1 Traction TD1 and Brakes TD5 – Phase 1 (PINTA)

Start date: Sep 1, 2016, End date: Nov 30, 2018,

The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic S2R-CFM-IP1-01-2016 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.Traction subproject will focus on the improvement of seven technical and economical pe ...
Read Project

 9

 FINISHED 

Climate Resilient Cities and Infrastructures (RESIN)

Start date: May 1, 2015, End date: Oct 31, 2018,

With most of its population and capital goods concentrated in urban areas, cities are key to the European economy. One of the major challenges cities face are more frequent extreme weather events due to climate change.The current diversity of approaches and methods available for cities developing an adaptation strategy limits the comparability between cities of vulnerabilities, adaptation option ...
Read Project

 17

 FINISHED 
PERFoRM - Production harmonizEd Reconfiguration of Flexible Robots and Machinery aims to the conceptual transformation of existing Production Systems towards plug&produce production systems in order to achieve a flexible manufacturing environments based on rapid and seamless reconfiguration of machinery and robots as response to operational or business events.These objectives require research acti ...
Read Project

 18

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 
MAYA aims at developing simulation methodologies and multidisciplinary tools for the design, engineering and management of CPS-based (Cyber Physical Systems) Factories, in order to strategically support production-related activities during all the phases of the factory life-cycle, from the integrated design of the product-process- production system, through the optimization of the running factory, ...
Read Project

 11

 FINISHED 

MOVE - MObility to improVE 2016

Start date: Sep 1, 2016, End date: Aug 31, 2018,

...offer to more trainees and other receiving partners, taking advantage of the its promoters' network related to the different existing locations, such as the various plants of the Volkswagen Group and Siemens, as well as other partners with which ATEC has maintained partnerships. The objectives of the project are:1 - Develop skills to contribute to supporting the trainees in their personal and prof ...
Read Project

 8

 FINISHED 

Hydrogen For All of Europe (HY4ALL) (HY4ALL)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

"Despite major technological development and the start of commercial deployments of the fuel cells and hydrogen technology, the public awareness of FCH technologies has lagged behind this technical progress so far, restricting the appetite of potential customers and risking a lack of support from policymakers. To address this challenge, a consortium of leading experts has come together, combining ...
Read Project

 13

 FINISHED 
CONNECTA aims at contributing to the S2R’s next generation of TCMS architectures and components with wireless capabilities as well as to the next generation of electronic braking systems. CONNECTA will conduct research into new technological concepts, standard specifications and architectures for train control and monitoring, with specific applications in train-to-ground communications and high sa ...
Read Project

 9

 FINISHED 
MODER vision is cost-effective, energy-efficient and user-oriented refurbishment of buildings as part of the global energy system. The main objective of MODER is to increase business of engineering companies, energy managers and consultants in supporting municipalities and building owners in European and global markets for the refurbishment of buildings at district level.The project will develop, ...
Read Project

 10

 FINISHED 

Smart Phone for Disease Detection from Exhaled Breath (SNIFFPHONE)

Start date: Feb 15, 2015, End date: Aug 14, 2018,

Screening for early detection of a disease is required to reveal groups of individuals from the general population in whom the likelihood of the disease is increased and who could benefit from further medical evaluation. The ideal screening test is high-accuracy, low-cost, non-invasive, easily repeatable, effortlessly operated by a lay-person and has minimal impact on the person’s daily activities ...
Read Project

 12

 FINISHED 

ACANTO: A CyberphysicAl social NeTwOrk using robot friends (ACANTO)

Start date: Feb 1, 2015, End date: Jul 31, 2018,

"Despite its recognised benefits, most older adults do not engage in a regular physical activity. The ACANTO project proposes a friendly robot walker (the FriWalk) that will abate a some of the most important barriers to this healthy behaviour.The FriWalk revisits the notion of robotic walking assistants and evolves it towards an activity vehicle. The execution of a programme of physical training ...
Read Project

 12

 FINISHED 
The project SENSIBLE addresses the call LCE-08-2014 by integrating electro-chemical, electro-mechanical and thermal storage technologies as well micro-generation (CHP, heat pumps) and renewable energy sources (PV) into power and energy networks as well as homes and buildings. The benefits of storage integration will be demonstrated with three demonstrators in Portugal, UK and Germany. Évora (Portu ...
Read Project

 16

 FINISHED 
With anticipated exponential growth of connected devices, future networks require an open solutions architecture facilitated by standards and a strong ecosystem. Such devices need an easy interface to the connected network to request the kind of communication service characterized by guarantees about bandwidth, delay, jitter, packet loss or redundancy. In response, the network should grant the req ...
Read Project

 9

 FINISHED 

Young Styrians GO Europe!

Start date: Jun 1, 2016, End date: May 31, 2018,

...ice Unit for the European Union- The regional Government of Styria with the Department for European Affairs and External Relations.- LOGO youth management.- A pool of Styrian enterprises e.g. Siemens AG Österreich.And here are the 14 upper-level secondary technical and vocational schools from Styria which participate as project partners of “Styrian Schools GO Europe!”:- Bad Gleichenberg Tourism Sc ...
Read Project

 25

 FINISHED 

PROJET PILOTE FRANCO-ALLEMAND POUR UN ERASMUS DES APPRENTIS

Start date: Jun 1, 2016, End date: May 31, 2018,

Due to the short deadline, we were not able to provide an English translation.
Read Project

 2

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Read Project

 13

 FINISHED 

Electrification of public transport in cities (ELIPTIC)

Start date: Jun 1, 2015, End date: May 31, 2018,

The overall aim of ELIPTIC is to develop new use concepts and business cases to optimise existing electric infrastructure and rolling stock, saving both money and energy. ELIPTIC will advocate electric public transport sector at the political level and help develop political support for the electrification of public transport across Europe. ELIPTIC looks at three thematic pillars:• Safe integratio ...
Read Project

 34

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9