Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Engine Mount System for Ultra High Pass Engine (EMS UHPE)

Start date: Mar 15, 2016, End date: Feb 14, 2022,

Our consortium is applying for the Engine Mounts System (EMS) of the Ultra High Propulsive Efficiency. Our 3 objectives are:1. Assist the Engine Manufacturer & the Airframer in the evaluation & selection of the most promising & suitable Engine Mounts System (EMS) configuration. Criteria for evaluation: weight, cost, dynamic performance, certification, impact on engine & aircraft assembly.2. Design ...
Read Project

 5

 FINISHED 
The BIOSKOH project will pave the way for a Second Generation European Circular Bioeconomy by showcasing how a number Innovation Stepping Stones can realise a breakthrough in techno-economic viability of lignocellulosic biorefineries. It will do so through a two stage investment process and development path to realise the largest (110 kton) second generation (2G) biorefinery in Europe. It starts f ...
Read Project

 12

 FINISHED 
SMARTER TOGETHER’s overarching vision is to find the right balance between smart technologies and organizational/ governance dimensions in order to deliver smart and inclusive solutions and to improve citizen’s quality of life.SMARTER TOGETHER gather the European Lighthouse cities Lyon, Munich, Vienna, the Follower cities Santiago de Compostela, Sofia, Venice and Kyiv and Yokohama as observer citi ...
Read Project

 30

 FINISHED 

Synaptic dysfunction in Neurodegenerative Diseases (SYNDEGEN)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Neurodegenerative diseases (NDDs) of aging are a growing burden on societies. Although studies on the degeneration of neurons have been a main focus of research, increasing evidence points to synapses as the site where Alzheimer’s disease (AD), Parkinson’s disease (PD) and Huntington’s disease (HD) begin. There is growing evidence that synapses are sites of early and aberrant protein misfolding, a ...
Read Project

 8

 FINISHED 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Read Project

 11

 FINISHED 
The overall aim of N2B-patch is the development of a new innovative N2B drug delivery technology based on the synthesis of a biomaterial-based innovative galenic formulation that will be applied with the aid of a novel medical device equipped with a container closure system (CCS) as a hydrogel patch to the nasal olfactory region for the chronic treatment of MS. The galenic formulation will consist ...
Read Project

 11

 FINISHED 

Low Emissions Intensity Lime and Cement (LEILAC)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

LEILAC, Low Emissions Intensity Lime And Cement, will successfully pilot a breakthrough technology that will enable both Europe’s cement and lime industries to reduce their emissions dramatically while retaining, or even increasing, international competitiveness. LEILAC will develop, build and operate a 240 tonne per day pilot plant demonstrating Direct Separation calcining technology which will c ...
Read Project

 13

 FINISHED 
The GENIALG project aims to boost the Blue Biotechnology Economy (BBE) by increasing the production and sustainable exploitation of two high-yielding species of the EU seaweed biomass: the brown alga Saccharina latissima and the green algae Ulva spp. GENIALG will demonstrate the economic feasibility and environmental sustainability of cultivating and refining seaweed biomass in multiple use deman ...
Read Project

 19

 FINISHED 
The FLEDGED project will deliver a process for Bio-based dimethyl Ether (DME) production from biomass. The FLEDGED project will combine a flexible sorption enhanced gasification (SEG) process and a novel sorption enhanced DME synthesis (SEDMES) process to produce DME from biomass with an efficient and low cost process.The primary aim of FLEDGED project is to develop a highly intensified and flexib ...
Read Project

 11

 FINISHED 
Zelcor project aims at demonstrating the feasibility of transforming lignocellulose biorefinery recalcitrant side streams into high added-value biobased products, including fine chemicals. Its concept is to combine chemical and enzymatic catalysis with insects-based biological conversion, within a biorefinery integrated approach. The project is conceived to avoid waste production by recycling wast ...
Read Project

 18

 FINISHED 

CIVITAS DESTINATIONS (DESTINATIONS)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

Within the EU, and particularly following the economic crisis; tourism will be, the ‘engine for economic growth’, particularly in the underperforming Mediterranean economies; where tourism has traditionally been a dominant economic sector. The world market of tourists continues to grow and Europe has unique selling points for further tourist growth from within and outside the EU (including China). ...
Read Project

 30

 FINISHED 

ENabling Onshore CO2 Storage in Europe (ENOS)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

To meet the ambitious EC target of an 80% reduction in greenhouse gas emissions by 2050, CO2 Capture and Storage (CCS) needs to move rapidly towards full scale implementation with geological storage solutions both on and offshore. Onshore storage offers increased flexibility and reduced infrastructure and monitoring costs. Enabling onshore storage will support management of decarbonisation strateg ...
Read Project

 20

 FINISHED 
The objective of the project IMPROOF is to drastically improve the energy efficiency of steam cracking furnaces by at least 20%, in a cost effective way, while simultaneously reducing emissions of greenhouse gasses and NOx per ton ethylene produced by at least 25%. One important way to reduce the energy input in steam cracking furnaces is to reduce coke formation on the reactor wall. The use of ei ...
Read Project

 11

 FINISHED 
Background The worldwide demand for nickel (Ni) is experiencing an unprecedented growth under current industrial and economic pressures. The European Innovation Partnership (EIP) classified Ni as a raw material with high economic importance. However, mine production mainly takes place outside of the European Union, whose mine output (in New Caledonia, Gre ...
Read Project

 9

 FINISHED 

Advancing Performing Arts Project - Performing Europe 2020

Start date: Jun 1, 2016, End date: May 31, 2020,

APAP– Performing Europe 2020 links 11 leading performing arts organisations from 10 different European countries, and 35 of the most innovative performing artists. The network will support artistic production, create new models of audience development, introduce a new database for the arts world and build a bridge to the Arab world. The program contains:1. Creating an innovative and visible artist ...
Read Project

 11

 FINISHED 
Land, food, energy, water and climate are interconnected, comprising a coherent system (the ‘Nexus’), dominated by complexity and feedback. The integrated management of the Nexus is critical to secure the efficient and sustainable use of resources. Barriers to a resource efficient Europe are policy inconsistencies and incoherence, knowledge gaps, especially regarding integration methodologies and ...
Read Project

 28

 FINISHED 
In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Read Project

 13

 FINISHED 
MycoKey aims to generate innovative and integrated solutions that will support stakeholders in effective and sustainable mycotoxin management along food and feed chains. The project will contribute to reduce mycotoxin contamination mainly in Europe and China, where frequent and severe mycotoxin contaminations occur in crops, and where international trade of commodities and contaminated batches are ...
Read Project

 32

 FINISHED 

Microorganisms in Warming Arctic Environments (MicroArctic)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

The Arctic plays a key role in the Earth’s climate system and is an area of growing strategic importance for European policy. In this ETN, we will train the next generation of Arctic microbiology and biogeochemistry experts who, through their unique understanding of the Arctic environment and the factors that impact ecosystem and organism response to the warming Arctic, will be able to respond to ...
Read Project

 13

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

The overall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptl ...
Read Project

 12

 FINISHED 
‘EXANDAS’ project aims to apply emerging and cutting edge technologies in the field of Natural Product Chemistry in order to fully and efficiently exploit the therapeutic potential of medicinal and aromatic processing waste and by-products. New opportunities for the generation of innovative products with high added value in the field of cosmeceuticals and food supplements are expected to be gener ...
Read Project

 9

 FINISHED 
In the face of the increasing global consumption of fossil resources, photosynthetic organisms offer an attractive alternative that could meet our rising future needs as clean, renewable, sources of energy and for the production of fine chemicals. Key to the efficient exploitation of these organisms is to optimise the conversion of Solar Energy into Biomass (SE2B). The SE2B network deals with this ...
Read Project

 12

 FINISHED 
The health expenditure in the EU is expected to rise by 350% by 2050 compared to an economic expansion of only 180% and the provision of Long Term Care (LTC) will pose an increasing challenge to the sustainability of public finances in the EU, due to an ageing population. REACH therefore represents a solution that seeks to prevent elderly citizens from loss of function and a decline of being able ...
Read Project

 18

 FINISHED 
Malaria is a life-threatening disease causing more than 500,000 deaths every year in sub-Saharan Africa. Prevention of the disease is best achieved by vector control which relies on the use of insecticides. Monitoring mosquito vector populations is an integral component of control programmes and a prerequisite for effective interventions. Several individual methods are used for this task, However, ...
Read Project

 10

 FINISHED 
Tendon Therapy Train is a research, training and innovation programme for human and equine tendon repair and regeneration that will exploit recent advancements in tissue engineering by self-assembly (TESA) technologies which have led to the clinical translation and commercialisation of advanced therapy medicinal products (ATMPs). Although TESA therapies have the potential to revolutionise healthc ...
Read Project

 9

 FINISHED 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Read Project

 14

 FINISHED 

The European Security Certification Framework (EU-SEC)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

In recent years the ICT market has evolved toward a cloud-based approach. This shift together with the rapidly changing legal and regulatory landscape has heavily impacted security assurance, governance and compliance. The information security market players have tried to provide suitable solutions to cope with issues such as i) lack of means to provide higher level of assurance (e.g continuous mo ...
Read Project

 10

 FINISHED 
The COSMHYC project aims at answering the needs identified by the MAWP of the FCH2 JU of increasing the energy efficiency of hydrogen production while reducing operating and capital costs, in order to make hydrogen a competitive fuel for transport applications. COSMHYC will develop and test an innovative compression solution from 1 to 1000 based on a hybrid concept, combining a metal hydride compr ...
Read Project

 5

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 
End-user and societal acceptance is critical to the success of the IoT large scale pilots. U4IoT combines complementary RRI-SSH expertise encompassing social and economic sciences, communication, crowdsourcing, living labs, co-creative workshops, meetups, and personal data protection to actively engage end-users and citizens in the large scale pilots. It will: • Develop toolkit for LSPs end-user e ...
Read Project

 9

 FINISHED 
Achieving a sustainable development trajectory in Amazonia is one of the key challenges facing Brazil, and is also an important international concern. ODYSSEA assembles an internationally renowned European and Brazilian multidisciplinary and intersectoral team. We aim to produce fundamental science and tools in order to build an innovative multi-and interdisciplinary observatory to monitor and ass ...
Read Project

 14

 FINISHED 
CRISS is a user-driven, flexible, scalable and cost-effective cloud-based digital learning ecosystem that allows the guided acquisition, evaluation and certification of digital competences in primary and secondary education, and easily scalable to other educational levels. CRISS proposes an innovative adaptive learning solution supported by the most advanced pedagogical methodologies and technolog ...
Read Project

 14

 FINISHED 
...engoa Bioenergia Nuevas Tecnologias SA 2) the use of biogas for the production of syngas by Perstorp. This will improve the plant economics and environmental impact, as will be investigated by E4Tech SARL during the project."
Read Project

 9

 FINISHED 
The overall goal of the HyperOLED project is to develop materials and matching device architectures for high-performance, hyperfluorescence organic light emitting diodes (OLEDs) for use in display applications and solid state lighting. The innovative OLEDs will be realised by combining thermally activated delayed fluorescence (TADF) molecular hosts with novel shielded fluorescence emitters, target ...
Read Project

 5

 FINISHED 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Read Project

 20

 FINISHED 
Fog computing brings cloud computing capabilities closer to the end-device and users, while enabling location-dependent resource allocation, low latency services, and extending significantly the IoT services portfolio as well as market and business opportunities in the cloud sector. With the number of devices exponentially growing globally, new cloud and fog models are expected to emerge, paving ...
Read Project

 10

 FINISHED 
The Bonseyes project aims to develop a platform consisting of a Data Marketplace, Deep Learning Toolbox, and Developer Reference Platforms for organizations wanting to adopt Artificial Intelligence in low power IoT devices (“edge computing”), embedded computing systems, or data center servers (“cloud computing”). It will bring about orders of magnitude improvements in efficiency, performance, reli ...
Read Project

 15

 FINISHED 

Intelligent decision from vineyard robots (VineScout)

Start date: Dec 1, 2016, End date: Nov 30, 2019,

The wine industry is strategically for Europe, both economically and socially speaking. Its competitive position in the global market depends on the long-term reputation of its wines, which needs many years to be built but can be lost quickly with a poor wine. The risk of losing reputation is high when repeatability cannot be granted, which happens ever more in the vineyards where manual data samp ...
Read Project

 5

 FINISHED 

READY

Start date: Dec 1, 2014, End date: Nov 30, 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Read Project

 23

 FINISHED 

communicating ERC projects through cOMICS (ERCcOMICS)

Start date: Nov 1, 2015, End date: Oct 31, 2019,

ERCcOMICS is a creative and ambitious project which proposes to exploit the power of visual storytelling through webcomics to promote and explain the achievements of ERC funded projects and the benefits of the ERC funding scheme for technological and scientific development, as well as for society as a whole. ERComics will:- produce 16 webcomics about carefully selected ERC funded, drawn by 16 diff ...
Read Project

 2