Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Read Project

 30

 FINISHED 
In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Read Project

 13

 FINISHED 
Manufacturing represents approximately 21 % of the EU’s GDP and 20 % of its employment, providing more than 30 million jobs in 230 000 enterprises, mostly SMEs. Moreover, each job in industry is considered to be linked to two more in related services. European manufacturing is also a dominant element in international trade, leading the world in areas such as automotive, machinery and agricultural ...
Read Project

 13

 FINISHED 
The Green INSTRUCT project will develop a prefabricated modular structural building block that is superior to conventional precast reinforced concrete panels by virtue of its reduced weight, improved acoustic and thermal performance and multiple functionalities. The Green INSTRUCT block consists of over 70% of CDW in weight. The Green INSTRUCT project will: (i) achieve sustainability and cost sav ...
Read Project

 15

 FINISHED 
A recent evaluation of FP7 projects executed by the EC, showed that an estimated 80% of funded Health projects lacks valorisation. The “UTILE” proposal presents the EU-Health Innovation Marketplace, an online tool to better valorise the FP7 Health and Horizon2020 SC1 project results. This marketplace will actively bring together Innovation Providers (i.e. technology push) and the Innovation Develo ...
Read Project

 11

 FINISHED 
Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided the ...
Read Project

 10

 FINISHED 
The market demands flexible productions lead to complexification of production systems and hence to more articulated Human Machine Interface (HMI). This new features tend to exclude from working environment elderly people who, even if they have a great experience, feel uncomfortable in the interaction with a complex computerized system. Moreover, complex HMI creates a barrier to young inexperience ...
Read Project

 11

 FINISHED 
MAESTRO aims to develop and combine with existing Selective Laser Melting (SLM) techniques five innovations that will constitute the basis of a highly competitive manufacturing value chain: (1) a single pre-process software for a numerical chain combining all mandatory steps and configurations of SLM together with its related pre- and post-processes, (2) Hybridization of SLM with MIM, (3) Adaptive ...
Read Project

 10

 FINISHED 

Drones: Experiential Learning and new Training Assets

Start date: Dec 1, 2016, End date: May 31, 2019,

The project aims at:- socializing (with case studies reconstructed for educational purposes) pupils and teachers of VET schools with drone technology, designing its integration with curricular STEM programs as teacher-led approach- co-designing with companies innovative working environments, developing the necessary resources for an open and transferable WBL for the realization of a project work “ ...
Read Project

 10

 FINISHED 
Starting from previous research experiences and tangible outcomes, STORM proposes a set of novel predictive models and improved non-invasive and non-destructive methods of survey and diagnosis, for effective prediction of environmental changes and for revealing threats and conditions that could damage cultural heritage sites. Moreover, STORM will determine how different vulnerable materials, struc ...
Read Project

 20

 FINISHED 

Ultralight and ultrasafe adaptable 3-wheeler (WEEVIL)

Start date: Jun 1, 2015, End date: May 31, 2019,

L category vehicles should answer the demands for less energy consumption and affordability and represent an attractive solution in congested cities with scarce parking space. WEEVIL aims to develop a new L category 3-wheeler that is quiet, clean, energy efficient and safe, as well as attractive to the public so that the barriers for adopting it are minimized. The new vehicle concept is an ultrali ...
Read Project

 11

 FINISHED 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Start date: Jun 1, 2016, End date: May 31, 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Read Project

 25

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Low Energy And Near to zero emissions Ships (LeanShips)

Start date: May 1, 2015, End date: Apr 30, 2019,

The specific challenge for waterborne transport call MG4.1 is, “To support developments that make new and existing vessels…more efficient and less polluting”. A sound way to support developments is, to demonstrate solutions that are sufficiently close to market so that ship owners will consider these in their future investment plans. Following this reasoning LeanShips will execute 8 demonstration ...
Read Project

 49

 FINISHED 
Background Ceramics manufacturing is one of the most energy-intensive industries. The sector is a significant contributor to greenhouse gas emissions, producing an estimated 1.84 million tonnes of CO2 globally, including 400 000 tonnes of CO2 in the EU. The LIFE ECONOMICK project fully contributes to the European Union’s climate and energy targets rel ...
Read Project

 3

 FINISHED 
The RESLAG project proposal is aligned with the challenges outlined in the call WASTE-1-2014: Moving towards a circular economy through industrial symbiosis. In 2010, the European steel industry generated, as waste, about 21.8 Mt of steel slag. The 76 % of the slag was recycled in applications such as aggregates for construction or road materials, but these sectors were unable to absorb the total ...
Read Project

 22

 FINISHED 
Background The European Union's Water Framework Directive (WFD) states that its “ultimate aim is to achieve the elimination of priority hazardous substances and contribute to achieving concentrations in the environment near background values for naturally occurring substances”. Some of these substances are synthetic organic chemicals that come from in ...
Read Project

 4

 FINISHED 
The share of renewable energy is growing rapidly driven by the objective to reduce greenhouse gas emissions. The amount of electric power which can be supplied to the grid depends on the time of the day and weather conditions. A conventional fleet of thermal power plants is required to compensate for these fluctuations before large scale energy storage technologies will be mature and economically ...
Read Project

 23

 FINISHED 
To meet the greenhouse gas reduction targets set by the European Commission and to reduce the reliance on imported energy sources from not-EU countries, the energy efficiency sector vitally needs basic analytical and decision support tools. This is especially true for large scale energy-consumer plants (for ex. foundries) but also for medical centres which typically (1) use large amounts of energy ...
Read Project

 10

 FINISHED 

Wearable Experience for Knowledge Intensive Training (WEKIT)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

OBJECTIVES: Build on multi-discipline research (e.g., human-centred methodology integrates cognitive models, ergonomics, understanding of worker’s well being) to accelerate how we identify, acquire and exploit skills valued by industry. Get high take-up by early adopters (e.g., in manufacturing). Augment training in situ with live expert guidance, a tacit learning experience and a re-enactment of ...
Read Project

 14

 FINISHED 

Knowledge Alliance for Advanced Urbanism

Start date: Nov 1, 2015, End date: Oct 31, 2018,

European cities are becoming living laboratories where industries carry on pilot projects to experiment new devices, all kind of sensors and online information and communication systems. The involvement of universities and research centres in this process is still limited. The increasing availability of data that comes from city sensors, creates new opportunities not just for monitoring and manage ...
Read Project

 11

 FINISHED 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Start date: Nov 1, 2015, End date: Oct 31, 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c ...
Read Project

 23

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 

Engineer for the Future

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The partnership of this project, composed of 10 partners, from 6 different countries, is a well balanced and strong one, as it involves schools, vet schools, universities, SMEs and Order/association of Engineers. All partners are well aware of the respective responsibility in accepting working together in this project and knows what their role is, during the 3 years of project development. The pre ...
Read Project

 10

 FINISHED 

Training in 3D Printing To Foster EU Innovation & Creativity

Start date: Sep 1, 2016, End date: Aug 31, 2018,

3D printing (3D-P) has a large effect on creativity and innovation and it has identified by EU as one of the technologies that will boost the development of future products and services. The use of 3D printing in the European industry is growing rapidly, creating new jobs that requires new skills and qualifications. As the development of these skills is not commonly supported by VET programs, ther ...
Read Project

 9

 FINISHED 
Full economic and social participation of people with disabilities is essential if the EU’s Europe 2020 strategy is to succeed in creating smart, sustainable and inclusive growth. Building a society that includes everyone also brings market opportunities and fosters innovation. However, policy and regulatory frameworks do not reflect the needs of people with disabilities adequately, neither does ...
Read Project

 6

 FINISHED 
ambliFibre will develop and validate the first intelligent model-based controlled laser-assisted tape winding system for fibre-reinforced thermoplastic (FRP) components. This system will include optical non-contact monitoring and innovative Human-Machine-Interfaces, which are easily manageable for the worker. Based on thermal and optical models embedded into integral process simulation tools combi ...
Read Project

 12

 FINISHED 
NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Read Project

 24

 FINISHED 

Creating links to speed-up innovation in the bio economy (BioLinX)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

BioLinX will bridge research and innovation efforts in the bioeconomy by building three large clusters in Europe and initiating within them a range of powerful linking and innovation acceleration processes. The BioLinX partners have leading roles in the bioeconomies of South West Netherlands and Flanders, the Nordic Countries and Northern Italy and in the lignocellulose, agro- and agro-waste feed ...
Read Project

 9

 FINISHED 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Read Project

 42

 FINISHED 
"Known as either "Industrial Revolution 4.0" or as "Industrial Renaissance", the need for new manufacturing approaches is widely accepted in the EU. SatisFactory aims to contribute to the transformation of traditional industrial environments using cutting-edge technologies in ways that are both productive and appealing to youth.The fundamental component of the proposed system will be the assessmen ...
Read Project

 11

 FINISHED 
FABRIC addresses directly the technological feasibility, economic viability and socio-environmental of dynamic on-road charging of electric vehicles.FABRIC responds to the need to assess the potential and feasibility of a more extensive integration of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of th ...
Read Project

 27

 FINISHED 
BIO-GO-For-Production is a Large Scale Collaborative Research Project that aims to achieve a step change in the application of nanocatalysis to sustainable energy production through an integrated, coherent and holistic approach utilizing novel heterogeneous nanoparticulate catalysts in fuel syntheses. BIO-GO researches and develops advanced nanocatalysts, which are allied with advanced reactor con ...
Read Project

 16

 FINISHED 
Despite recent evolutions of tools/practices in the Architecture Engineering, Construction and Facility Management have already resulted in considerable advances, some limitations remain, related to the complexity and variability of building life cycles, addressing building end user awareness and participation, lack of new business models, life cycle fragmentation, limited interoperability of the ...
Read Project

 21

 FINISHED 
Background It is widely acknowledged that some of the best quality vitreous china sanitary ware comes from Europe, and in particular from Italy and Germany. The European ceramics’ sanitary ware sector employs around 22 000 people directly, and has an annual turnover of €4.5 billion. The industry is characterised by the concentration of large, multinat ...
Read Project

 4

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
In the past, customers invested in high cost, long service-life products. Today, they demand complex product-services capable of adapting to new customer goals and rapidly changing markets. The Use-it-wisely project will enable European manufacturers to operate successfully within this new paradigm.The project will investigate a new business model that implements continuous product-service adaptat ...
Read Project

 22

 FINISHED 

Focused Ultrasound Therapy Using Robotic Approaches (FUTURA)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Focused Ultrasound Therapy Using Robotic Approaches (FUTURA) aims at creating an innovative multi-robotic platform for non-invasive interventions. The project addresses all specific issues necessary for a concrete and effective transfer of robotic technologies into operating rooms. The robotic platform is expected to operate in an unstructured and extremely critical environment; perception capabil ...
Read Project

 6