Search for European Projects

32 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Resource and Energy Efficient Manufacturing (REEMAIN)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

REEMAIN combines cutting edge knowledge and experience from production processes, professional energy simulation, energy and resource planning, and renewable energy and storage to develop and demonstrate a methodology and platform for the boost, of efficiency resources.Based on the knowledge of who are the energy consumers in manufacturing REEMAIN offers 3 solutions. 1) Innovation in technologies ...
Read Project

 18

 FINISHED 

Europa, proyección de futuro

Start date: Sep 1, 2016, End date: Aug 31, 2017,

The project has been designed for students of sector vocational trainning studies: Transport and Vehicle Maintenance, Management of Sales and Shopping Areas and Administration and Management.We try to aim two objectives: on the one hand, to achieve that our students get in touch with the new tools and ways of working, related to their professional areas, on the other hand, to make students aware ...
Read Project

 10

 FINISHED 
The central goal of JERONIMO is the understanding of the physical mechanisms of ultrahigh bypass ratio (UHBR) engines with a bypass ratio (BPR) larger than 12 and the related installed jet noise with potential jet-wing interaction. The aim is to reduce uncertainties in jet noise characterisation of this novel installation configuration by wind tunnel tests and predictions and being able to derive ...
Read Project

 13

 FINISHED 
...clause 5.1 reserving funds originally intended as a pre-payment to Ceres Power• Allocation of additional pre-financing to Solid Power Spa• Change of project coordinator named by COGEN Europe to Roberto Francia.
Read Project

 29

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 
Traditionally, the European manufacturing industry is characterized by innovative technology, quality processes and robust products which have leveraged Europe's industrialization. However, globalization has exposed Europe's industry to new emerging and industrialized manufacturing markets and the current economic challenges have decelerated the internal boost and investment, respectively. Hence, ...
Read Project

 29

 FINISHED 
"The proposal IDREEM will create smarter greener growth for one of Europe’s most important industrial sectors: the aquaculture industry. It will achieve this through taking waste streams that are at present lost to the environment (as pollution) and converting them into secondary raw materials for the production of high value organisms such as seaweed and shellfish. To do this IDREEM will develop, ...
Read Project

 15

 FINISHED 
The vision of ReBORN is to demonstrate strategies and technologies that support a new paradigm for re-use of production equipment in old, renewed and new factories; maximizing the efficiency of this re-use and making the factory design process much easier and straight forward, shortening ramp-up times and increasing production efficiency and flexibility. This paradigm will give new life to decommi ...
Read Project

 19

 FINISHED 
The CONVENIENT project targets a 30% reduction of fuel consumption in vehicles for long-distance freight transport by developing an innovative heavy-truck archetype featuring a suite of innovative energy-saving technologies and solutions.From the customer viewpoint, fuel efficiency is top priority because of its significant impact in terms of cost (in the EU, fuel represents about 30% of the Total ...
Read Project

 23

 FINISHED 
EASEE aims at developing a tool-kit for energy efficient envelope retrofitting of existing multi-storey and multi-owner buildings which combines novel design and assessment strategies, modular prefabricated elements, advanced insulating materials and new scaffolding-free installation approaches, to reduce energy demand, minimising the impact on occupants while preserving the façade original appear ...
Read Project

 18

 FINISHED 

CO2 REduction for long distance transport (CORE)

Start date: Jan 1, 2012, End date: Dec 31, 2015,

"The project proposal CORE (CO2 REduction for long distance transport) is a collaborative large-scale integrating project for a call within FP7-SUSTAINABLE SURFACE TRANSPORT (SST)-2011-RTD-1. The project consortium consists of three truck manufactures in Europe, Volvo, Daimler and IVECO, together with 13 other partners in the automotive industry and universities.The objective is to demonstrate a s ...
Read Project

 16

 FINISHED 
DIRECTION project aims at the creation of a framework of demonstration and dissemination of very innovative and cost-effective energy efficiency technologies for the achievement of very low energy new buildings . This framework is based in three pillars:• Analysis of suitable energy efficiency technologies (technical and economic viability)• Demonstration activity deployed in three new buildings• ...
Read Project

 11

 FINISHED 
The future in manufacturing is oriented to more flexible and adaptable systems. Customization is also a great challenge and a way of giving added value to the products. And aesthetic personalization is one of the main ways for achieving customization.UV-Marking project aims at demonstrating that unitary customization (individual configurations/designs of each customer) is possible, by developing a ...
Read Project

 12

 FINISHED 
EASIER adresses the CfP JTI_CS_2013-2-GRA-05-008 and proposes a way to perform acoustic tests on a WT-model which was designed and manufactured in a previous CfP.The current project is proposed by a small consortium combining the necessary competence for this project:- IBK is a small company coordinating the project and performing design work in the project. IBK is also leading the consortium buil ...
Read Project

 4

 FINISHED 
WITTINESS adresses the acoustic measurement campaign of previously (in a different CfP) designed WT-model, equipped with engine-demonstrators. In order to tackle this project a consortium including a company experienced in design, structural mechanics and aerodynamics, a SME, a manufacturer and a university with a strong focus on acoustic measurements propose an approach to use the previously desi ...
Read Project

 4

 FINISHED 

CHS explores Europe

Start date: Jun 1, 2014, End date: May 31, 2015,

CHS, Centrum Humanberuflicher Schulen des Bundes Villach, is a secondary vocational school providing higher education entrance qualification and comprises the following specializations: - Höhere Lehranstalt für wirtschaftliche Berufe (business administration) - Höhere Lehranstalt für Kommunikation und Mediendesign (communication and media) - Höhere Lehranstalt für Kunst und Gestaltung (arts) - Hö ...
Read Project

 16

 FINISHED 

Industrial Process Heat by Solar Collectors (INSUN)

Start date: Apr 1, 2012, End date: Mar 31, 2015,

The main idea of InSun is to demonstrate the reliability and quality of large scale solar thermal systems for different types of industrial process heat applications on medium and high temperature levels. Three different types of collector systems are demonstrated and compared: improved flat plate collectors for an Austrian meat factory for steam pre-heating up to 95°C, tracked concentrating Fresn ...
Read Project

 7

 FINISHED 
Product and production engineering in companies are typically fragmented across different functional units, distributed across companies along the value chain, requiring input from experts from a variety of disciplines using different methods and tools. This leads to a high coordination effort to synergise work and information transfer as well as to sub-optimal decisions and unused knowledge and e ...
Read Project

 15

 FINISHED 
A smart ICT concept will be implemented in existing public buildings in Germany, Italy, Slovenia and Greece in order to reach energy savings in annual and peak consumption up to 35% and to provide social-economic benefits to building users, to building managers, to public authorities and to distributor network operators. The ICT concept proposed with this action will be based on the off-the-shelf ...
Read Project

 8

 FINISHED 

Manufacturing Error-free Goods at First Time (MEGAFIT)

Start date: Dec 1, 2011, End date: Nov 30, 2014,

Today, Europe’s leading position in manufacturing of high-precision metal parts is being threatened by developed non-EU countries that catch up quickly on product quality at low cost. If no further action is taken, loss of jobs and GDP are at risk.To face global competition, a breakthrough is needed in tackling the following 4 challenges:1) High number of defects2) Many costly, energy consuming fi ...
Read Project

 17

 FINISHED 
CROPS will develop scientific know-how for a highly configurable, modular and clever carrier platform that includes modular parallel manipulators and “intelligent tools” (sensors, algorithms, sprayers, grippers) that can be easily installed onto the carrier and are capable of adapting to new tasks and conditions. Several technological demonstrators will be developed for high value crops like green ...
Read Project

 14

 FINISHED 
The HealthBread project (HealthBread product innovation based on FP6 HEALTHGRAIN results and knowledge) will, based on an SME and consumer oriented approach, develop whole grain and white breads with further improved nutritional and product quality by applying scientific and technological knowledge from the EU FP6 HEALTHGRAIN project into production and marketing of commercially viable, healthier ...
Read Project

 18

 FINISHED 
In the last two decades, a precise management of agricultural land has been made possible due to the availability of new technologies, including global positioning systems (GPS), geographic information systems (GIS), sensors, automation of agricultural machinery, and high resolution image sensing. As a result, the concept of Precision Agriculture has emerged as the management strategy that uses in ...
Read Project

 15

 FINISHED 
The S-MC-S project aims at supporting European manufacturing to adapt to global competitive pressures by developing methods and innovative enabling technologies towards a customer oriented and eco-efficient manufacturing. To this end, S-MC-S vision is to define and research a new production paradigm, Sustainable Mass-Customization, while also presenting Customization as one of the main driving for ...
Read Project

 14

 FINISHED 

MOre Safety for All by Radar Interference Mitigation (MOSARIM)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Since several years millimeter-wave radar systems are used for vehicular applications, predominantly in comfort functions and a few in safety functions. Different frequencies and modulation schemes, emission powers and radiation patterns are used and up to now almost no care or precaution is undertaken to reduce or avoid mutual interference. Within a few years the penetration rate of vehicular rad ...
Read Project

 12

 FINISHED 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Read Project

 59

 FINISHED 
IMPALA will develop flexible and efficient Rapid Manufacturing processes of custom parts or small batches. SME end users will be at the forefront of this project, helping them increase their annual turnover by 20-50%, by producing a diversified range of high value components. Currently, manufacturing custom products such as artificial teeth can take several days or weeks and is very expensive. Thi ...
Read Project

 16

 FINISHED 

EST: The large aperture European Solar Telescope (EST)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

"This is the project definition for the Conceptual Design Study of the large aperture European Solar Telescope (EST). EST is a pan-European project involving 29 partners from 14 different countries. A consortium EAST (European Association for Solar Telescopes) exists with the aim, among others, of undertaking the development of EST, to keep Europe in the frontier of Solar Physics in the world. EST ...
Read Project

 30

 FINISHED 
"We propose a two years work, aiming at optimising sea urchin Paracentrotus lividus rearing, in order to enrich pre-existing aquaculture farms (based on sea bass, bream, and/or different bivalves) . Sea urchin breeding will be performed starting from adult specimens obtained from capture. Sea urchin roe (gonads) are first class food and are worldwide commercialised. This project arises from the in ...
Read Project

 11

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27

 FINISHED 
"There is a need for better measurement instruments for analysis of airborne particles, in particular nanoparticles. Use of powders, nanomaterials/ceramics, and nanoparticles is rising fast. Occupational health problems are present at a wide range of different work places due to airborne particulates. Toxic particles such as asbestos and silica are responsible for the majority of particle related ...
Read Project

 13