Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...erence databases/tools for multimodal validation of strain; Novel approach for evidence based classification of heart failure etiologies.The consortium is composed of a large Medical Imaging Company (Philips), a University (UPF), and 2 Clinical Centres (IDIBAPS/CHUC), thus encompassing the whole spectrum of relevant multi-disciplinary multi-sectorial Europe-wide expertise. The early stage research ...
Read Project

 3

 FINISHED 
The European lighting industry aims at reducing cost, at continuously improving product performance while reducing time to market and enlarging the product. The main challenge for the design in of LED components into lighting systems is the temperature and current dependence of their performance. In order to achieve a good design of LED systems, a modular, multi-physics based modelling approach is ...
Read Project

 15

 FINISHED 

Personalised Decision Support for Heart Valve Disease (EurValve)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Valvular Heart Disease currently affects 2.5% of the population, but is overwhelmingly a disease of the elderly and consequently on the rise. It is dominated by two conditions, Aortic Stenosis and Mitral Regurgitation, both of which are associated with significant morbidity and mortality, yet which pose a truly demanding challenge for treatment optimisation. By combining multiple complex modelling ...
Read Project

 14

 FINISHED 
MANGO targets to achieve extreme resource efficiency in future QoS-sensitive HPC through ambitious cross-boundary architecture exploration for performance/power/predictability (PPP) based on the definition of new-generation high-performance, power-efficient, heterogeneous architectures with native mechanisms for isolation and quality-of-service, and an innovative two-phase passive cooling system. ...
Read Project

 9

 FINISHED 
...ot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips Innovation Services, which will be qualified for small/medium-scale production of medical devices. The pilot facility will be open to other users for pilot production and product validation. I ...
Read Project

 40

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
New multi-beam Tera-scale capacity satellites will require a disruptive approach to address digital on-board processors that rely on electronics which consume space, power and cost and reach their capacity saturation. The disruptive solution must combine scalability, technical feasibility, power-efficiency and cost-effectiveness. ROBIN aims to provide this solution realizing multi-gigabit optical ...
Read Project

 8

 FINISHED 
The objective of the MFManufacturing project is to bring the manufacturing of microfluidic devices to the same level of maturity and industrialisation of electronic devices, enabling them to address more widely in the healthcare needs. Electronic devices, which have been on the market for many years, have benefited from the long going standardization of electronic components, and were therefore ea ...
Read Project

 21

 FINISHED 

Intelligent Catheters in Advanced Systems for Interventions (INCITE)

Start date: Mar 1, 2014, End date: Mar 1, 2017,

INCITE aims to develop intelligent catheter technologies and systems that will accelerate the paradigm shift from costly, burdensome surgical treatments to cost-effective and patient-friendly minimally invasive interventions. It will also enable the creation of new advanced treatments for currently complex surgical procedures. This will allow for more individuals to be treated thereby contributing ...
Read Project

 24

 FINISHED 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Read Project

 32

 FINISHED 
...ubstantial improved efficacy of decision making over current guidelines, and an integrated package that is used as part of clinical workflow will ensure the industrial project partners, in particular Philips, will develop project outputs into dedicated products that will have significant clinical impact.
Read Project

 9

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Ultra Wide Context Aware Imaging (PANORAMA)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Read Project

 17

 FINISHED 

Energy Efficient and Intelligent Lighting Systems (ENLIGHT)

Start date: Apr 1, 2011, End date: Mar 1, 2014,

...omplete value chain on lighting from semiconductors industry, sensor manufacturers, IC, SW/HW developers, and knowledge institutes, up to luminaire makers and utility providers. Together with Philips and Osram, the EnLight consortium is able to bring the best lighting solution forward, fit for a quick uptake by the many SME luminaire manufacturers in Europe. The project will strengthen Europe’s le ...
Read Project

 30

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 
The ENIAC JU project ESiP is addressing the issues of reliability, failure analysis and testing in innovative system-in-package (SiP) solutions. Highly integrated systems with greater miniaturisation and increased functionality open new markets and improve the quality of life through a wide range of applications. In particular, higher systems integration technologies using multi-chip packaging, th ...
Read Project

 40

 FINISHED 

REvolutionary Approaches and Devices for Nucleic Acid Analysis (READNA)

Start date: Jun 1, 2008, End date: Nov 30, 2012,

"The REvolutionary Approaches and Devices for Nucleic Acid analysis – READNA – consortium is composed of researchers from 10 academic institutions, 5 SMEs and 3 large companies. The goals of the READNA consortium are to revolutionize nucleic acid analysis methods, by 1) improving elements necessary to use the currently emerging generation of nucleic acid sequencers in a meaningful and accessible w ...
Read Project

 20

 FINISHED 

Osteoporotic Virtual Physiological Human (VPHOP)

Start date: Sep 1, 2008, End date: Oct 31, 2012,

Nearly four million osteoporotic bone fractures cost the European health system more than 30 billion Euro per year. This figure could double by 2050. After the first fracture, the chances of having another one increase by 86%. We need to prevent osteoporotic fractures. The first step is an accurate prediction of the patient-specific risk of fracture that considers not only the skeletal determin ...
Read Project

 21

 FINISHED 

ACcelerate Trust in digital life Organisation and Relations (ACTOR)

Start date: Jun 1, 2010, End date: May 31, 2012,

...is time to address the fundamental societal issues raised by the introduction of digital technologies, by bringing together European stakeholders to promote trust in digital life.On 24 November 2008, Philips, Microsoft, Nokia and Gemalto took the initiative to establish the Trust in Digital Life Partnership. The coordination action ACTOR supports the TDL Partnership raising awareness of research a ...
Read Project

 6

 FINISHED 
The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems.Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment ...
Read Project

 32

 FINISHED 

Content generation and delivery for 3D television (3D4YOU)

Start date: Feb 1, 2008, End date: Jan 31, 2011,

The 3D4YOU project will develop the key elements of a practical 3D television system, particularly, the definition of a 3D delivery format and guidelines for a 3D content creation process. The project will develop 3D capture techniques, convert captured content for broadcasting and develop 3D coding for delivery via broadcast, i.e. suitable to transmit and make public.3D broadcasting is seen as th ...
Read Project

 8

 FINISHED 
The main objective of the project is to foster a harmonised technology for managing in real time the energy consumption of appliances at home, interworking this information to communication devices over the home network and virtualising it with the final aim of making it available to users through home communication networks in the form of standalone or network operator services.Behind this scope, ...
Read Project

 12

 FINISHED 

Interactive Networked Experiences in Multimedia for You (iNEM4U)

Start date: Jan 1, 2008, End date: Mar 31, 2010,

In a perfect world, networked electronic media enable individuals and groups of users to share their interactive media experiences in an intuitive and seamless manner, regardless of their choice of device and networks.The main problem is that the landscape of networked multimedia consists of a number of non-interoperable technology islands. Examples are the consumer electronics devices in the home ...
Read Project

 11

 FINISHED 

SEAmless Content Delivery (SEA)

Start date: Jan 1, 2008, End date: Dec 31, 2009,

In the forthcoming age, where everyone may be content producer, mediator and consumer, SEA aims to offer a new experience of personalised, seamless content delivery, maintaining the integrity and wherever applicable, enriching the perceived QoS (PQoS) of the media across the whole distribution chain. SEA is a project focused on seamless, personalised, trusted and PQoS-optimised multimedia content ...
Read Project

 10

 FINISHED 

Support Action for the NEM European Technology Platform (4NEM)

Start date: Oct 1, 2007, End date: Nov 30, 2009,

In 2004, the Networked and Electronic Media (NEM) industrial sector launched the NEM European Technology Platform. Three years later, the NEM community has grown to more than 500 members.In the early time of FP7, the NEM platform intends to help to the birth of the NEM industry sector, develop its influence on the European organisations, and improve its presence on the international scene.The 4NEM ...
Read Project

 16