Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Read Project

 37

 FINISHED 
PROMECA strategic objective is to substantially contribute to the increase of knowledge, skills, and competitiveness in the European research area and industry, through the design and deployment of a thorough plan of research and secondment of researchers between top-level EU academia and industrial partners, contributing to the main European Policies on innovation. In line with the MSCA-RISE gene ...
Read Project

 6

 FINISHED 

Single European Sky ATM Research (SESAR)

Start date: Dec 31, 2000, End date: Dec 30, 2020,

Intelligent traffic systems in the air transport sector contribute to reduce airports' environmental footprint and to minimise nuisances like noise and air pollution. Technological tools can contribute to a more efficient management of flights both on the ground (airport management systems) and in the air (Functional Airspace Blocks).Air transport contributes significantly to European economic gro ...
Read Project

 1

 FINISHED 

HyBalance

Start date: Oct 1, 2015, End date: Sep 30, 2020,

Power-to-Gas (PtG) is an innovative energy concept which will help to incorporate flexibility into future energy systems, increasingly characterised by the use of fluctuating renewable electricity. One PtG option, dubbed Power-to Hydrogen (PtH2) is to produce hydrogen from water electrolysis applying cheap renewable electricity in times of surplus and providing it for re-electrification in times o ...
Read Project

 7

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Read Project

 27

 FINISHED 

WADI

Start date: Oct 1, 2016, End date: Mar 31, 2020,

...erall objective of WADI project is to contribute to the reduction of losses in water transmission systems and decrease the related energy consumption required for the process. WADI aims to develop an airborne water leak detection surveillance service to provide water utilities with adequate information on leaks in water infrastructure outside urban areas, thus enabling the utility to promptly repa ...
Read Project

 12

 FINISHED 
There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in l ...
Read Project

 21

 FINISHED 

Increased Runway and Airport Throughput (PJ02 EARTH)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Read Project

 35

 FINISHED 

Integrated Surface Management (PJ03a SUMO)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

...gram for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03a is intended to identify and validate operational and techno ...
Read Project

 37

 FINISHED 

Total Airport Management (PJ04 TAM)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Read Project

 30

 FINISHED 

Flight Object Interoperability VLD Demonstration (PJ27 IOPVLD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

"One essential goal of the Single European Sky is to improve the Interoperability of the Air Traffic Management (ATM) network. The SESAR approach towards this goal is the introduction of a 4D-trajectory, which is common across all ATM stakeholders, called Reference Business Trajectory (RBT). The Flight Object concept is seen as a key enabler for implementing the RBT for Air Navigation Service Prov ...
Read Project

 14

 FINISHED 

Environmentally Friendly, Efficient Electric Motion (3EMOTION)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

The 3EMOTION project will provide policymakers and financing institutions with the necessary arguments to invest in Fuel Cell Buses (FCB) as a cost effective strategy to accelerate the reduction of harmful local emissions while offering attractive co-modality options for commuters. By leveraging the experiences of earlier FCB demonstrations in overcoming the last technical and economic barriers, a ...
Read Project

 15

 FINISHED 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Read Project

 20

 FINISHED 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Start date: Sep 1, 2016, End date: Dec 31, 2019,

...d systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actions of key airborne and ground stakeholders in Europe.The airborne industry will develop up to certification the worldwide first airborne unit capable of downlinking ADS-C data according to ATN Baseline 2 standard i ...
Read Project

 18

 FINISHED 
PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Read Project

 28

 FINISHED 

Common Services (PJ15 COSER)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The legacy of Air Traffic Management (ATM) evolution in Europe has resulted in today’s highly fragmented, country-based, services. A consequence of this fragmentation, there is a negative impact on the cost in the provision of ATM service in Europe. A fundamental goal of the Single European Sky initiative is to “provide ATM services to airspace users at a cost of at least 50 % less”. The notion ...
Read Project

 19

 FINISHED 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Read Project

 30

 FINISHED 

4D Trajectory Management (PJ18 4DTM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...tary ones) among the stakeholders. This is improved thanks to new tools and capabilities ensuring all stakeholders are managing a single, updated and complete view of the forecasted meteorology and airspace configuration.Both solutions above will increase safety and efficiency - a very important step towards ensuring that anyone can fly safer, cheaper and quicker in Europe in 10 years.As so many s ...
Read Project

 29

 FINISHED 

Content Integration (PJ19 CI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...nts expectations. It will provide the main input for the future updates of the European ATM Master Plan.PJ19 will bring together 16 partners. The broad representation of experts from the European Air Navigation Service Providers, Airports, Airborne and Ground industries and Network Manager will provide the necessary skills to successfully and efficiently carry out the project tasks and to meet the ...
Read Project

 28

 FINISHED 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Read Project

 29

 FINISHED 
...e ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holistic System of Systems, which includes air and ground CNS solutions considering convergence towards a common infrastructure, and a unified concept of operations, where possible.In parallel, CNS systems and infrastructure for both airborne ...
Read Project

 30

 FINISHED 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Read Project

 14

 FINISHED 

Airport Safety Nets (PJ03b SAFE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Read Project

 28

 FINISHED 

Enhanced Arrivals and Departures (PJ01 EAD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...of Terminal Manoeuvring Areas (TMAs) in a safe, cost-effective and environmentally sustainable manner. This will be achieved by taking advantage of the latest technological developments from both an airborne and a ground-system perspective and through the secure sharing of data. The needs of all Airspace Users will be addressed including General Aviation and Rotorcraft.All types of European TMA e ...
Read Project

 25

 FINISHED 

Trajectory based Free Routing (PJ06 ToBeFREE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The Free Routing concept enables Airspace Users (AU) to fly as close as possible to their preferred trajectory, without being constrained by fixed airspace structures or fixed route networks.Free Routing (FR) implementation represents a step towards a less fragmented European airspace foreseen by Single European Sky (SES) and provides the AUs with the possibility to fly their user preferred routes ...
Read Project

 18

 FINISHED 

Master Plan Maintenance (PJ20 AMPLE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

...SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, sets out Performance Ambitions and a Vision for European ATM, in full alignment with ICAO Global Air Navigation Plan.The ATM MP is composed of three Levels; it can be consulted in the ATM MP Public Portal www.atmmasterplan.eu.By EU Regulation 409/2013, the ATM MP is the essential instrument allow ...
Read Project

 29

 FINISHED 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Start date: Nov 1, 2016, End date: Nov 30, 2019,

...opic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control room independent on airport location in order to ...
Read Project

 31

 FINISHED 
Depletion of natural resources combined with the extending footprint of mankind has led to a shift in importance of research and development topics. In the 1970s and 1980s process yield was primarily targeted, but emphasis is now focussed on resource efficiency as a primary objective. Routes for resource efficiency have to be identified and implemented to provide a more environmental and resource- ...
Read Project

 11

 FINISHED 

PJ22:Validation and Demonstration Engineering (PJ22 SEabird)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The aim of SESAR2020.PJ22 is to address one of the Transversal Activities, specifically Validation & Demonstration Engineering. In SESAR 1, the application of an engineering methodology defining the process for development of verification and validation platforms, was optionally mandated to the primary projects, leading to a different level of information available across the Programme. The delive ...
Read Project

 12

 FINISHED 

Advanced Airspace Management (PJ08 AAM)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Read Project

 20

 FINISHED 

Advanced DCB (PJ09 DCB)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

...sidiary DCB and UDPP measures under consideration of trade-offs and network performance targets. Collaborative 4D constraints management integrates AUs priorities and reconciles DCB measures with Airports, ACCs, AU and NM.
Read Project

 30

 FINISHED 
SafeClouds is a research project supported by EASA and powered by a full spectrum of aviation stakeholders (Airlines, Airports, ANSPs, Eurocontrol, Research Entities, Safety Agencies) that develops cutting-edge technologies for aviation safety assurance in a cost-effective manner. SafeClouds proposes a data-driven approach to achieve a deeper understanding of the dynamics of the system, where risk ...
Read Project

 15

 FINISHED 

PJ07 Optimised Airspace Users Operations (PJ07 OAUO)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The SES Performance Scheme established the principles of performance-driven ATM and Network-wide Collaborative decision making including Civil and State Airspace Users. Hence, it is critical that Flight and Wings Operation Centres processes and tools be enriched for more efficient interaction with ATM Network stakeholders including Airports. Improved performance of ATM depends on a higher certaint ...
Read Project

 14

 FINISHED 
...pe is about to generate 20% of its required energy from RES by 2020, so that the proper RES integration poses continent-wide challenges.The Cryogenic Energy Storage (CES), and particularly the Liquid Air Energy Storage (LAES), is a promising technology enabling on-site storage of RES energy during periods of high generation and its use at peak grid demand. Thus, CES acts as Grid Energy Storage (GE ...
Read Project

 14

 FINISHED 
The origins of pollutants inside the aircraft cabin are various. Ozone comes from outside, particularly when the aircraft is flying at high altitudes near the stratospheric ozone layer. In addition to the materials emissions, carbonyl species can be also produced in the cabin by reaction of ozone with unsaturated VOCs.Ozone and VOCs can cause acute respiratory problems, aggravate asthma and increa ...
Read Project

 5

 FINISHED 
...st end-users’ requirements.2 - GALILEO EGNSS & SAR System validation.3 - Certifications for commercialization.The HELIOS consortium composed of Orolia, Cobham aerospace communications, CNES, SIOEN, Air France, and Airbus, is involved in different relevant international working groups (Cospas-Sarsat, ICAO, EUROCAE), and will ensure that the development phase of the SGB will be in line with the comp ...
Read Project

 6

 FINISHED 
RESCOOP MECISE is short for Renewable Energy Sources COOPeratives Mobilizing European Citizens to Invest in Sustainable Energy. As European citizens and local authorities often lack time, financial means and technical expertise to initiate the necessary energy renovations of their houses and public buildings, the potential for energy efficiency projects remains largely untapped. RESCOOP MECISE wil ...
Read Project

 6

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
...s to improve quality of adult learning. As competences are context bound, it is therefore necessary to take the context in which professionals are working into account.The Lifelong learning at Open Air Museums: Improving Competences of Adult Learning Facilitators at European Open Air Museums (LOAM) project addresses adult learning and competences development for museum personnel at four Open Air m ...
Read Project

 4

 FINISHED 

EUBET

Start date: Sep 1, 2016, End date: Aug 31, 2018,

Bromangymnasiet in Hudiksvall is situated in a region of very high unemployment, among the young it is the highest percentage in the country (25 %). Our school has the task and mission to develop an intercultural teaching practice supported by inclusive, innovative methods and entrepreneurship to achieve a more entrepreneurial learning for the benefits of our students. For some years now, we have ...
Read Project

 62