Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

European Prevention of Alzheimer’s Dementia Consortium (EPAD)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

Background:The secondary prevention of Alzheimer’s dementia (AD) is achievable if we can identify individuals at risk of disease progression defined by biomarker evidence of AD pathology and no or only minimal clinical symptoms and engage them in a standing adaptive clinical trial, of the highest quality, testing multiple interventions. To achieve this, EPAD will also provide the analytical infras ...
Read Project

 40

 FINISHED 

Labeling of Enalapril from Neonates up to Adolescents (LENA)

Start date: Nov 1, 2013, End date: Oct 31, 2018,

Children are often treated as small adults—not as the special patients they are. Regulations exist to encourage the development of drugs and formulation for children. However, off-patent drugs are often administered to children without appropriate formulations or systematic investigations. Therefore, the paediatric use marketing authorisation (PUMA) has been designed.The EMA Paediatric Working Par ...
Read Project

 14

 FINISHED 
Aggression is a basic physiological trait with important roles throughout evolution, both in defence and predation. When expressed in humans in the wrong context, aggression leads to maladjustment, social impairment and crime. Despite this, knowledge about aggression aetiology is limited and current treatment strategies are insufficient. Contingent to a subdivision into impulsive and instrumental ...
Read Project

 27

 FINISHED 
"RECREATE is a policy support network that will collect strategic and analyse information about medium and long term research and innovation trends and prospects.The aim of RECREATE is to overcome this fragmentation, and to create a clear cut research agenda for the Horizon 2020 priority of climate change, raw materials and resource efficiency using an RTD perspective for a transition management s ...
Read Project

 18

 FINISHED 

Consortium on Organ Preservation in Europe (COPE)

Start date: Jan 1, 2013, End date: Jun 30, 2018,

The discrepancy between organ supply and demand remains the biggest challenge facing the transplant community today. In order to increase the amount of available donor organs, transplant specialists are increasingly turning to sub-optimal donor organs. Organs from such donors, usually have normal or near normal function before death, but retrieval, storage and transplantation cause progressive inj ...
Read Project

 16

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 
Conduct Disorder (CD) and Oppositional Defiant Disorder with symptoms of Conduct Disorder (which is included among the abbreviation “CD” throughout the proposal) has a highly negative impact for the affected individual as well as for families and society. Although the number of females exhibiting serious aggressive behaviours is growing, the majority of studies on aetiology and treatment of CD hav ...
Read Project

 19

 FINISHED 
EUFAR aims at providing researchers with Open Access to the airborne facilities the most suited to their needs. EUFAR thus allocates Transnational Access to 21 installations, develops a culture of co-operation between scientists and operators, and organizes training courses to attract young scientists to airborne research. To improve the quality of the service, EUFAR supports the experts on airbor ...
Read Project

 24

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 
"Supramolecular polymeric assemblies represent an emerging, promising class of systems with superior versatility compared to their covalent polymeric counterparts. They offer exciting new opportunities for stimuli-responsive structures exhibiting reversible tunable properties, with applications in foodstuff, coatings , cost-efficient processes or biomedical areas. To explore their potential and de ...
Read Project

 11

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
Scientific creativity and innovation represent the beating heart of European growth at a time of rapid technological change. Dr Inventor is built on the vision that technologies have great potential to supplement human ingenuity in science by overcoming the limitations that people suffer in pursuing scientific discovery. It presents an original system that will provide inspiration for scientific c ...
Read Project

 8

 FINISHED 

Support action for Vehicle and Road Automation network (VRA)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The improvement of sensors, power train control as well as communication, make possible the automation of vehicle driving. Vehicle prototypes are currently capable of driving automatically, in road and urban environment. The automation is provided by systems in the vehicle and/or deployed on the road infrastructure, so that the process is named Vehicle and Road Automation.Partial or full automatio ...
Read Project

 14

 FINISHED 

Efficient, large-area arbitrary shape solar energy (ArtESun)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

The ArtESun project combines the multidisciplinary and complementary competences of top-level European research groups and industries in order to make significant steps towards high-efficiency >15%, stable and cost efficient OPV technology. For this purpose, the project objectives are set to make break-through advances in the state of the art in terms of (i) the development of innovative high effi ...
Read Project

 13

 FINISHED 

Aerospace Multidisciplinarity Enabling DEsign Optimisation (AMEDEO)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

"AMEDEO is a multi-disciplinary design optimisation (MDO) research training network designed to provide outstanding leadership career development for talented young researchers. Network training incorporates advanced multi-disciplinary optimisation, high fidelity simulation tools and techniques for resolving complex engineering design problems in the aerospace industry. It is complemented by a com ...
Read Project

 12

 FINISHED 

Environmental Acclimation of Photosynthesis (ACCLIPHOT)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

AccliPhot is an interdisciplinary, intersectorial research andtraining network devoted to study photosynthetic acclimation processesin plants and algae. We will train 13 early-stage researchers (ESRs)and 1 experienced researcher (ER) in cutting-edge experimentaltechnologies, modern modelling approaches, industrial applications anda wide spectrum of complementary and industry-relevant skills. In th ...
Read Project

 13

 FINISHED 
"Reaching low levels of cabin and ramp noise is crucial to ensure the satisfaction of aircraft passengers and a safe working environment for the crew and personnel servicing the grounded aircraft. From the passenger and personnel standpoint, good thermal and acoustic comfort is important to minimize both stress symptoms and tiredness. Required to provide satisfactory air quality and temperature, t ...
Read Project

 10

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 
Parasites exact a devastating toll on health and economic productivity, infecting man and also domestic livestock. Drugs used to combat parasitic diseases are deficient in many ways and new, better drugs are needed to establish sustainable means to combat diseases caused by protozoan parasites that include malaria, trypanosomiasis and leishmaniasis in man, and coccidiosis among others in animals. ...
Read Project

 12

 FINISHED 
This proposal aims to close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address th ...
Read Project

 50

 FINISHED 

Virtual Embodiment and Robotic Re-Embodiment (VERE)

Start date: Jun 1, 2010, End date: Dec 31, 2015,

VERE aims to carry out research on the fusion of the human body with virtual or physical surrogates. By fuse we mean that human participants would operate under the illusion that the virtual body is their own, or that they are actually in the physical space of the real world in a robotic body that they perceive as their own. As well as providing a radical extension of traditional virtual reality ...
Read Project

 17

 FINISHED 
The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Read Project

 31

 FINISHED 

Open Collaborative Model for Tuberculosis Lead Optimisation (ORCHID)

Start date: Jan 1, 2011, End date: Jun 30, 2015,

"Early stage Drug Discovery efforts over the last 5 years have resulted in the identification of a number of promising lead compounds in the fight against TB. These leads need to be further progressed and optimised into candidates for pre-clinical development through the Drug Development progression cascade.Three compound families are of particular interest: 1) InhA Inhibitors, 2) New potent whole ...
Read Project

 14

 FINISHED 
"HYSOP’s goal is to develop solutions for manufacturing lightweight high temperature (HT) turbine components and to design new coating systems (protection against oxidation, water vapour and CMAS).Nb/Nb5Si3 and Si3N4/MoSi2 composites are lightweight HT materials (density < 6.5~7 and < 5.6 g/cm3, respect.) with application potential above 1300°C making them candidates for advanced aero-engine compo ...
Read Project

 11

 FINISHED 
The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Read Project

 20

 FINISHED 
The key objective of the TROPOS project is the development of a floating modular multi-use platform system for use in deep waters, with an initial geographic focus on the Mediterranean, Tropical and Sub-Tropical regions but designed to be flexible enough not to be limited in geographic scope.The TROPOS approach is centered on the modular development where different types of modules can be combined ...
Read Project

 21

 FINISHED 
SUSCLEAN will contribute to the development and implementation of a new generation of environment-friendly equipment sanitation and food product decontamination technologies ensuring food safety. Susclean is focused on minimally-processed vegetables (MPV) i.e. vegetables physically altered from their original form by slicing and cutting but remaining in a fresh state. We will develop knowledge, me ...
Read Project

 24

 FINISHED 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Start date: Jan 1, 2013, End date: Dec 31, 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Read Project

 42

 FINISHED 
Monitoring the quality of drinking water is of paramount importance for public health. “Water is not a commercial product but a heritage that must be protected, defended and treated as such” (Water Framework Directive 2000/60/EC). The threat of waterborne diseases in Europe will predictably increase in the future as the human population increases and as a result of globalization and migration from ...
Read Project

 12

 FINISHED 
High costs together with concerns for driving range, reliability and safety are still the main hindrance for market adaption of full electrical vehicles (FEVs). ESTRELIA aims to provide building blocks with enhanced reliability and safety at lowered costs for smart energy storage for FEVs.This is accomplished by proposing a modular approach with ultracapacitor power packs with higher density with ...
Read Project

 9

 FINISHED 
"The vision of the TIPS project is to produce better innovation in the transport sector by enhancing the capacity of EU-funded FP projects in the field of transport to be at the source of innovation and to help them transform research results into products and services.The transport sector is faced with major challenges. Demand in transport will grow by 50% for passengers and 80% for freight (EU ...
Read Project

 9

 FINISHED 
"Europe is facing major diet related health problems. Attitudes to eating habits have to be changed and the benefits of alternative treatment regimes substantiated. This can only be achieved by providing guidelines regulating health claims based on scientific data. Thus, there is a unique opportunity to use gut flora in potential treatment regimes and as a preventive target for major diet related ...
Read Project

 24

 FINISHED 
"The goal of ERICKA is to directly contribute to reductions in aircraft engine fuel consumption with a targeted contribution of 1% reduction in SFC relative to engines currently in service. The fuel efficiency of a jet engine used for aircraft propulsion is dependent on the performance of many key engine components. One of the most important is the turbine whose efficiency has a large influence ...
Read Project

 20

 FINISHED 

Biosensor nanoarrays for environmental monitoring (BIOMONAR)

Start date: Apr 1, 2010, End date: Mar 31, 2014,

BIOMONAR develops multiplexed nanoarray biosensors for environmental targets, i.e. pollutants and pathogens. The innovative approach engineers three sensor platforms (surface, liposomal, living cell) which exploit a panel of periplasmic binding proteins (PBPs) as the common selective element. The nanoarrays are integrated into a microfluidics system for in-situ monitoring. The strategy allows for ...
Read Project

 11

 FINISHED 

European Study to Establish Biomarkers of Human Ageing (MARK-AGE)

Start date: Apr 1, 2008, End date: Sep 30, 2013,

The rate of ageing in humans is not uniform, due to genetic heterogeneity and the influence of environmental factors. Age-related changes in body function or composition that could serve as a measure of “biological” age and predict the onset of age-related diseases and/or residual lifetime are termed “biomarkers of ageing”. Many candidate biomarkers have been proposed but in all cases their variab ...
Read Project

 28

 FINISHED 
Description Development of future individualized cancer diagnosis and treatment follow-up devices, through surface plasmon early detection of circulating heat shock proteins and tumor cellsCancer has become the leading cause of death in the world and costs more in productivity and lost life than any other illness, according to the America ...
Read Project

 6

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 

VALidation and Improvement of Airframe Noise prediction Tools (VALIANT)

Start date: Sep 1, 2009, End date: May 31, 2013,

"Broadband noise generated by the turbulent flow around the airframe is one of the most important components of aircraft generated acoustic nuisances. Its prediction and subsequent reduction is essential for achieving the ACARE 2020 objectives of noise level reductions. However, the complexity and diversity of broadband turbulent noise sources makes that prediction with present numerical tools ext ...
Read Project

 13

 FINISHED 

Efficient Cooling Systems for QUieter Surface Transport (ECOQUEST)

Start date: Dec 1, 2009, End date: May 31, 2013,

"An important subsystem in surface transportation vehicles (rail bound, automotive and heavy duty) is the cooling unit. Present European standards for interoperability of rail bound traffic require low noise levels while manufactures need to meet the vehicle performance and energy efficiency requested by the operators. The stringent EU6 emission limits expected to come into effect will increase dr ...
Read Project

 10

 FINISHED 
"Effective and efficient vibration and acoustic analysis, modelling and design methods are required to produce world-leading products with good noise and vibration performance. Noise and vibration levels must remain within safe limits, there are issues regarding human comfort and a need for robust, optimal, efficient designs. There is also an increasing trend towards virtual design and prototyping ...
Read Project

 13