Search for European Projects

36 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The world of geographic information (GI) is, at present, extremely heterogeneous. User and system requirements, too varied to be satisfied by a single system or technology, have led to an utter lack of agreement on interoperability standards, creating a barrier to realizing the full exploitation potential of GI. ENERGIC OD will address these problems by adopting a broker architectural approach, de ...
Read Project

 17

 FINISHED 

CI-NERGY Smart cities with sustainable energy systems (CI-NERGY)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The CI-NERGY Marie Curie Initial Training Network (ITN) aims to train young scientists to develop urban decision making and operational optimisation software tools to minimise non-renewable energy use in cities. The training will be carried out by a close collaboration of six of the best academic research centres and four leading industrial companies from the energy and software technology sector ...
Read Project

 11

 FINISHED 

BBMRI - Large Prospective Cohorts (BBMRI-LPC)

Start date: Feb 1, 2013, End date: Jan 31, 2017,

In recent years, biomedical research has crossed international borders in large, collaborative studies showing the value of multidisciplinarity and scale advantage. This has yielded valuable insights and some led to new and better medicines and treatments for diseases. However, disease-focused studies provide less insight in the real disease onset, the relative disease burden in the population, an ...
Read Project

 36

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

Quiet Tracks for Sustainable Railway Infrastructures (QUIET-TRACK)

Start date: Jun 1, 2013, End date: May 31, 2016,

The objective is to provide step changing track based noise mitigation systems and maintenance schemes, to provide reliable improved TSI based rolling noise calculation procedures with harmonized monitoring of the required input parameters and to provide track noise management tools, for use in noise mapping and hot spot action plans according to the END, for use as engineering tools and solutions ...
Read Project

 12

 FINISHED 
Cancer is hallmarked by multiple genetic aberrations that lead to a functional derangement of cellular signalling networks. Embryonal tumours (ETs) comprising neuroblastoma, medulloblastoma and Ewing sarcoma, occur early in life, and thus may reveal pathogenetically relevant lesions clearer than adulthood tumours which carry passenger mutations accumulated during life. ASSET will exploit this fact ...
Read Project

 20

 FINISHED 
The aim of the IMPRESS project is to provide a Systems Development Platform which enables rapid and cost effective development of mixed criticality complex systems involving Internet of Things and Services (IoTS) and at the same time facilitates the interplay with users and external systems. The IMPRESS development platform will be usable for any system intended to embrace a smarter society. The d ...
Read Project

 6

 FINISHED 
The CyClaDes project is designed to promote the increased impact of the human element in shipping across the design and operational lifecycle. The project brings together a multi-disciplinary team to focus on all the key steps in the lifecycle; the stakeholders; where the barriers to human element integration occur; and how to best locate, produce, disseminate, and apply human element knowledge wi ...
Read Project

 14

 FINISHED 

Future INternEt Smart Utility ServiCEs (Finesce)

Start date: Mar 1, 2013, End date: Sep 30, 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Read Project

 34

 FINISHED 
RLW Navigator aims to develop an innovative Process Navigator to configure, integrate, test and validate applications of Remote Laser Welding (RLW) in automotive assembly addressing today's critical needs for frequently changing operating conditions and product-mix provisions. Thus, RLW Navigator will crucially serve as an enabler for future energy efficient smart factories. RLW is emerging as a p ...
Read Project

 14

 FINISHED 
The ebbits project aims to develop architecture, technologies and processes, which allow businesses to semantically integrate the Internet of Things into mainstream enterprise systems and support interoperable real-world, on-line end-to-end business applications. It will provide semantic resolution to the IoT and hence present a bridge between enterprise applications, people, services and the phys ...
Read Project

 9

 FINISHED 

TRAINING SCHEMES ON NUCLEAR SAFETY CULTURE (TRASNUSAFE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

Nuclear Safety Culture is a topic of paramount importance for all nuclear operators as well as for all operators of installations dedicated to radiology and radiotherapy. It concerns also the regulators and related support organisations. Its efficient practice is an absolute must for nuclear power plants, for production and transport of fissile materials and radioisotopes, and for related research ...
Read Project

 19

 FINISHED 

Quality Control of Aluminium Laser-welded Assemblies (QCOALA)

Start date: Sep 1, 2010, End date: Jul 31, 2014,

The QCOALA project will develop a new dual-wavelength laser processing system for welding thin-gauge aluminium and copper, 0.1mm to 1.0mm in thickness, with integrated process monitoring and in-line non-destructive inspection, and establish its capability to provide a reliable, high-speed, low-cost and high-quality joining solution for electric car battery and thin-film photovoltaic (PV) cell inte ...
Read Project

 10

 FINISHED 
The vision of E2ReBuild is to transform the retrofitting construction sector from the current craft and resource based construction towards an innovative, high-tech, energy efficient industrialised sector.E2ReBuild aims to- investigate, promote and demonstrate cost effective and advanced energy efficient retrofit strategies that create added value for existing apartment buildings and endorse end-u ...
Read Project

 21

 FINISHED 
Within this framework, the main objective of the project is to develop and prove new approaches for through-life asset management for selected technologies and application scenarios.This will be done by considering all life cycle phases of the technologies concerned in view of their cost efficiency, environmental performance and safety. Special emphasis will be given to the identification, elabora ...
Read Project

 19

 FINISHED 
The development and implementation of bio-refinery processes is an absolute necessity and the key to meet the vision towards bio-based economy. The EuroBioRef concept is an integrated, sustainable and diversified bio-refinery involving all biomass value chain stakeholders. The latter will allow large-scale research, testing, optimisation and demonstration of processes in the production of a wide r ...
Read Project

 34

 FINISHED 
"IQ-FRESHLABEL will develop two novel innovative intelligent labels. One will monitor the time and temperature of frozen products, the other also the oxygen content in modified atmosphere packed fresh food. Controlling post production life cycle of food is important element of food supply chain. Improper handling of product during transport, storage and in households results in quality defects, in ...
Read Project

 18

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 
Description How to focus on the relevant while making financial decisions in a world of information overkill? – Ask FIRST firstThe FIRST project provides an information extraction, information integration and decision making infrastructure for information management in the financial domain. This area is extraordinarily faced with the chal ...
Read Project

 9

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 

Advanced Intelligent Machine Adaptive Control System (AIMACS)

Start date: Aug 1, 2010, End date: Jul 31, 2013,

"Current machining technologies and practices have many inefficiencies. Numerous unpredictable machining variables often cause overload and unstable conditions and catastrophic damage to the machine tool system. In addition, this results in frequent disruptions in production that can often be excessive, leading to considerable losses in productivity, capital and energy resources. In an effort to p ...
Read Project

 10

 FINISHED 
Strategic Objectives Assessed: Strengthening the ERA by integrating national and European S&T schemes through International Cooperation in S&T with Korea, with a specific focus on existing “Competency Networks”.
Read Project

 11

 FINISHED 
The objective of CoReNet is to address consumer needs and expectations of wide range of European citizens as well as specific target groups - such as elderly, obese, disabled, or diabetic persons -by supplying small series of functional and fashionable clothes and footwear of high quality, affordable price and eco-compatibility. Therefore the European Textile, Clothing and Footwear Industry wil ...
Read Project

 14

 FINISHED 

Acoustically Green Road Vehicles and City Areas (CITYHUSH)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

"The CITYHUSH project will support city administrations in the production and implementation of noise action plans according to the directive EC 2002/49.The identified hot spots and noise acting plans made with the existing technology suffer from major shortcomings:1. poor correlation between hot spots with annoyance and complaints;2. most measures lead to increased emissions;3. only indoor noise ...
Read Project

 17

 FINISHED 
Main aim of the project is the development of a complete, integrated process chain for the cost effective serial production of various aerospace CFRP stiffener profiles. The production is foreseen in the two steps: Preform manufacturing and infiltration / curing. The project will focus on complex profile geometries with variable cross sections, single or multiple curvature and integrated load int ...
Read Project

 20

 FINISHED 
The use of renewable energy in the building sector is today dominated by the application of solar domestic hot water and PV systems in single-family houses. In order to significantly increase the use of renewable energy in the building sector, concepts have to be developed for large buildings. In these buildings high fractions of the energy demand can only be met with renewable energy sources, whe ...
Read Project

 27

 FINISHED 
The development and production of glycoarrays will provide the foreground knowledge necessary to lead to a step change in the diagnosis and treatment of diseases ranging from cancers to autoimmune diseases. Carbohydrates play a pivotal role in the molecular interactions that govern biological events at the centre of health and disease. This has become more evident as the characterisation and ident ...
Read Project

 17

 FINISHED 
"We aim develop in-vivo imaging biomarker of multidrug transporter function as a generic tool for the prediction, diagnosis, monitoring and prognosis of major CNS diseases, as well as to provide support and guidance for therapeutic interventions. Multidrug transporters actively transport substrates (including multiple CNS drugs) against concentration gradients across the blood-brain barrier (BBB). ...
Read Project

 14

 FINISHED 

Transmissions in Aircraft on Unique Path wirEs (TAUPE)

Start date: Sep 1, 2008, End date: Feb 29, 2012,

"The technologies for power and data transmissions over unique path wires are strongly developed. The OPERA project made feasible High Speed/High Voltage transmissions for Power Line Communication. The U-Broad project demonstrated that Fast Ethernet (100 Mb/s) can be provided over existing telephone network cabling. But, even if these technologies have been rapidly exploited in the automotive sect ...
Read Project

 18

 FINISHED 

Widely Tunable VCSEL using Sub Wavelength Gratings (SUBTUNE)

Start date: Apr 1, 2008, End date: Dec 31, 2011,

Wavelength-tunable lasers are key components for future reconfigurable optical networks and for cost-effective and compact telecommunication infrastructures. Moreover, a broadband and continuously tunable laser with high purity emission spectrum is a versatile tool for many sensing applications, e.g. for greenhouse gases (laser absorption spectroscopy) or deformations of buildings (fiber Bragg gra ...
Read Project

 9

 FINISHED 

Highly Automated Vehicles for Intelligent Transport (HAVE-it)

Start date: Feb 1, 2008, End date: Jul 31, 2011,

Description The groundbreaking HAVEit proposal aims at the long-term vision of highly automated driving. Within this proposal important intermediate steps will be developed, validated and demonstrated. These intermediate results on the one hand offer high potential for exploitation within 3-5 years after HAVEit and on the other hand form the ...
Read Project

 29

 FINISHED 

Biobanking and Biomolecular Resources Research Infrastructure (BBMRI)

Start date: Feb 1, 2008, End date: Jan 31, 2011,

The Preparatory Phase for a pan-European Biobanking and Biomolecular Resources Research Infrastructure (BBMRI) will focus on technical, legal, governance, and financial issues to • prepare to construct BBMRI, building on existing biobanks, resources and technologies, specifically complemented with innovative components and properly embedded into European scientific, ethical, legal and societal fra ...
Read Project

 55

 FINISHED 
"The implementation of the present Project aims at: Analysing present policies concerning EU MS and Community targets for energy import. Evaluating technical, economical and environmental characteristics of present and future energy corridors within Europe and among Europe and the supplying regions of the World, taking into account the different typology of infrastructures and technologies (railwa ...
Read Project

 16

 FINISHED 

Visual Analytics - Mastering the Information Age (VisMaster CA)

Start date: Aug 1, 2008, End date: Sep 30, 2010,

One of the most important challenges of the emerging Information Age is to effectively utilise the immense wealth of information and data acquired, computed and stored by modern information systems. On the one hand, the appropriate use of available information volumes offers large potential to realize technological progress and business success. On the other hand, there exists the severe danger th ...
Read Project

 28

 FINISHED 
The EUAsiaGrid proposal contributes to the aims of the EU Research Infrastructures FP7 Programme by "promoting international interoperation between similar infrastructures with the aim of reinforcing the global relevance and impact of European e-Infrastructures".The project's main goal will be to pave the way towards an Asian e-Science Grid Infrastructure, in synergy with the other European Grid i ...
Read Project

 17

 FINISHED 

Integrating European Timing Analysis Technology (ALL-TIMES)

Start date: Dec 1, 2007, End date: May 31, 2010,

A large class of embedded systems has safety, availability, reliability, timing and performance requirements. Timing analysis is needed in many steps of the development process; it is a key to rapid designing and prototyping of embedded systems, to reduce system overall cost through efficient resource management (especially: tradeoffs when co-developing hardware and software), to find bottlenecks ...
Read Project

 6