Search for European Projects

18 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This project will focus on the development of technologies and methodologies which have the potential to save costs and time across the whole life cycle of the aircraft (design, production, maintenance, overhaul, repair and retrofit), including for certification aspects. Moreover it will also target the integration of additional functions or materials in structural components of the aircraft, the ...
Read Project

 14

 FINISHED 

Optimised Energy Management and Use (OPTEMUS)

Start date: Jun 1, 2015, End date: Feb 28, 2019,

Optimised energy management and use (OPTEMUS) represents an opportunity for overcoming one of the biggest barriers towards large scale adoption of electric and plug-in hybrid cars: range limitation due to limited storage capacity of electric batteries.The OPTEMUS project proposes to tackle this bottleneck by leveraging low energy consumption and energy harvesting through a holistic vehicle-occupan ...
Read Project

 15

 FINISHED 

ICT Powered Machining Software Suite (MC-SUITE)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

The advances in the Information and Communication Technologies are revolutionizing our everyday life. However, the manufacturing industry does not yet take complete advantage of this huge potential. Using the latest ICT developments, MC-SUITE project wants to boost the productivity of manufacturing industry. On the one hand, machining process modelling empowered by High Performance Computing techn ...
Read Project

 12

 FINISHED 

Young Entrepreneurial Skills by ICT

Start date: Sep 1, 2015, End date: Aug 31, 2018,

In recent years many industrialized countries have suffered from economic downturn and high unemployment rates. Entrepreneurs play a potential role in stimulating and supporting economic prosperity, due to their ability to adapt to changing environments and because their structure allows them to conform to technological changes. On account of this, in this constantly changing and ever more interco ...
Read Project

 7

 FINISHED 

Efficient Urban LIght VEhicles (EU-LIVE)

Start date: Jun 1, 2015, End date: May 31, 2018,

"EU-LIVE will provide a comprehensive European solution for the next generation of electrified, cost- and energy-efficient light urban vehicles to cope with the challenges of future personal urban mobility, based on both user needs and acceptance.EU-LIVE will establish the "EU-LIVE modular platform", a systematic approach for efficiently designing, developing and building a wide range of L-categor ...
Read Project

 13

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
...mentation of transversal competences: 1. TKNIKA-ES 2. LIBERA UNIVERSITA DI BOLZANO- IT 3. AALBORG UNIVERSITET-DK 4. SOCIEDADE PORTUGUESA DE INOVACAO - -PT 5. NORTHERN REGIONAL COLLEGE-UK 6. MONDRAGON UNIVERSITY-ES 7. EUC Syd-DK 8. TANGRAM-IT Intellectual outputs: O1) Set up of the Network and Network operational strategy, evaluation and monitoring methodology O2) Reference guide of key resources ...
Read Project

 8

 FINISHED 
"For a large scale introduction of Electric Vehicles (EV) in Europe, adequate volume supply of current PM based motors could be at risk, as the rare earth metals they contain can only be found under single source monopolies. In this context, the development of high efficiency motors using a limited amount of permanent magnets or completely new magnet-free motor designs is crucial. A promising opti ...
Read Project

 6

 FINISHED 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Read Project

 28

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 
The nSHIELD project is, at the same time, a complement and an improvement of “pSHIELD”, a pilot project funded in ARTEMIS Call 2009 as the first investigation to build the SHIELD Architectural Framework for SPD. The roadmap proposed in this pilot project aims at addressing Security, Privacy and Dependability (SPD) in the context of Embedded Systems (ESs) as “built in” rather than as “add-on” funct ...
Read Project

 24

 FINISHED 
The competitive edge of the European industry in the embedded systems domain is an enabler to achieve a leading position in the growing global market of safety-relevant embedded systems. The main success factors in this context will be the ability to understand the key reasons for the huge increase in cost and development time, and to adopt efficient methods and processes for development of these ...
Read Project

 24

 FINISHED 

Adaptive Control for Metal Cutting (ADACOM)

Start date: Oct 1, 2008, End date: Sep 30, 2012,

The project ADACOM will address main industrial sectors. automotive (DC, LOLA, CRF), electronics (BOSCH) and printing machine sector (HDM). Next to those OEM’s, OEM’s supplier and especially sensor manufacturer suppliers (Kistler) will participate in this project in order to reach the following goals: Core development will be an Adaptive Machining Systems for metal cutting operations (milling, tu ...
Read Project

 12

 FINISHED 
"ACCENT addresses the relevance to the call 7.1: “Aeronautics and Air Transport” by “Improving Cost efficiency” and quality of safety critical aircraft engine components. The manufacture of safety critical rotating components in modern aero engines is by nature very conservative. In order to achieve the required engine performance, thermal and mechanical stresses are pushed to the maximum, which i ...
Read Project

 14

 FINISHED 
-
Read Project

 17