Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Organic Bioelectronics (ORGBIO)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Organic Bioelectonics is a new discipline which holds promise to shape, direct, and change future medical treatments in a revolutionary manner over the next decades. At the moment Europe has a unique leading position in this area, being almost all the world-leading groups in this field located in Europe and constituting the core of this international training network. However, realizing the promis ...
Read Project

 15

 FINISHED 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Read Project

 18

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Read Project

 15

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Read Project

 8

 FINISHED 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Read Project

 15

 FINISHED 

ACTive Implant for Optoacoustic Natural sound enhancement (ACTION)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The ACTION project builds on the recent discovery that relatively low levels of pulsed infrared laser light are capable of triggering activity in hair cells of the partially hearing (hearing impaired) cochlea and vestibule. So far the excessively large volume of optical fibre systems and external light sources used for animal studies prevented the practical use of this discovery for long term anim ...
Read Project

 7

 FINISHED 
Description A flexible architecture compatible with current infrastructures and low cost components based on silicon photonics: the keys for mass Fiber-To-The-Home ultra-broadband deployment FABULOUS will design, develop and characterize new Silicon Photonics components for application in next-gen ...
Read Project

 8

 FINISHED 
ClouT's overall concept is leveraging the Cloud Computing as an enabler to bridge the Internet of Things with Internet of People via Internet of Services, to establish an efficient communication and collaboration platform exploiting all possible information sources to make the cities smarter and to help them facing the emerging challenges such as efficient energy management, economic growth and de ...
Read Project

 6

 FINISHED 
Network operators are looking for cost effective solutions to manage and upgrade their networks to meet the user experience demanded by European citizens. The backhauling infrastructure is becoming a bottleneck.E3Network will design an E-band transceiver for the backhaul infrastructure of the future networks. It will work in the E-band, which enables highly focused "pencil beam" transmissions and ...
Read Project

 9

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 
AVTR addresses the development of the complete Electrical powertrain optimised as a whole of systems:- Energy saving in pure urban drive up to 20% with respect to state of-the-art fixed transmission ratio,- Avoid the use of Permanent Magnet Motors because non optimal elements when integrated in a multi ratios transmission PWT. When designing for energy savings, the maximum efficiency is calculate ...
Read Project

 8

 FINISHED 
People with Parkinson's disease (PD) suffer from motor and cognitive impairments that severely impact mobility, fall risk, and multiple key aspects of functional independence. Until recently, treatment goals focused almost exclusively on symptom relief, but exciting recent work by CuPiD partners and others has demonstrated that motor learning and rehabilitation principles can be effective even in ...
Read Project

 9

 FINISHED 

Implantable Organic Nano-Electronics (iONE-FP7)

Start date: Mar 1, 2012, End date: Feb 28, 2015,

The vision of iONE-FP7 is to exploit for the first time flexible organic electronics for the development and testing of Active Multifunctional Implantable Devices (AMIDs) to treat Spinal Cord Injury (SCI). The devices will (a) have long-term stability associated to high biocompatibility and safety, (b) have reduced risk of a host versus graft immune response, (c) mimic the local microenvironment f ...
Read Project

 13

 FINISHED 
Extending product functionality and improving their lifetime requires additional features to satisfy the growing customer's needs as well as new market and technology trends. For example, a network Intrusion Detection System needs to scan all incoming network packets for suspicious content. The scanning has to be at "line-speed" so that the monitored communication links are not slowed down, while ...
Read Project

 8

 FINISHED 
The e-HIMALAYA project aims at prototyping innovative GNSS-based core technologies and concepts, with the objective to build key Galileo differentiators in a multi-GNSS hybridized receiver.Several markets are addressed with the main weight put on Mass-Market and transport, which represents the main Galileo receiver market.The project will develop a list of key features to enable a higher penetrati ...
Read Project

 7

 FINISHED 
Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Read Project

 23

 FINISHED 

immersiVe ENhancemenT of User-woRld Interactions (VENTURI)

Start date: Oct 1, 2011, End date: Sep 30, 2014,

Augmented Reality (AR) is a concept and a vision that has been with us, and will be with us, for the foreseeable future. We're already augmented today using mobile devices with a connection to the Internet allowing us to almost instantly gain access to the collective global human knowledge. We're starting to add visual augmentation into some devices, but we are only tapping into a small part of th ...
Read Project

 9

 FINISHED 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Read Project

 11

 FINISHED 

Making Sense of Nonsense (iSense)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

Description The emergence of networked embedded systems and sensor/actuator networks has made possible the collection of large amount of real-time data about a monitored environment. In many cases the collected data may be incomplete, or it may not make sense, thus compromising the sensor-environment interaction and possibly affecting the ab ...
Read Project

 5

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Read Project

 15

 FINISHED 
Description New tools for application development on many-core systemsThe current trend in computing architectures is to integrate in embedded devices an increasing number of processing cores. Latest generation smart phones carry two processors plus graphic accelerators while in the near future we can envision to scale up to 16 or 32 proc ...
Read Project

 8

 FINISHED 

Embedded Reconfigurable Architectures (ERA)

Start date: Jan 1, 2010, End date: Mar 31, 2013,

Description To develop an embedded system platform that dynamically adapt itself to the applications. The platform will be open-source: both the industry and academia can use it for fast design-space prototypingThe design of embedded systems such as mobile smartphones becomes increasingly more complex as multi-core processors are needed t ...
Read Project

 11

 FINISHED 
Description Synaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologiesSynaptic project targets the optimisation of manufacturability and the reduction of systematic variations in nanometer technologies through exploitation of regularity at the architectural, structur ...
Read Project

 8

 FINISHED 

A Highly Efficient Adaptive Multi-processor Framework (HEAP)

Start date: Feb 1, 2010, End date: Jan 31, 2013,

Description Making modern embedded systems faster and less power hungry by parallelizationWriting parallel programs has traditionally been considered a difficult task, even when parallelism is taken into account from the beginning. Moreover there is an urgent need to parallelize the massive amounts of legacy sequential code so as to incre ...
Read Project

 11

 FINISHED 

Embedded Organic Memory Arrays (MOMA)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

The advent of non-volatile flash memory -- silicon-based semiconductor memory that does not lose its data when the power is turned off -- revolutionized consumer electronics. Similar types of organic memory will play a pivotal role in the wide range of new market opportunities of flexible electronics based on organic transistor technology. Currently, these memory elements do not exist, thus formin ...
Read Project

 6

 FINISHED 

COntent Aware Searching, retrieval and sTreaming (COAST)

Start date: Feb 1, 2010, End date: Jul 31, 2012,

Towards the Future Internet age, COAST aims to build a Future Content-Centric Network (FCN) architecture, able to offer network-wide Service Level Agreements (SLAs) in service discovery and content consumption. In COAST FCN, the users will specify solely which content or web service they need and the COAST framework will find and deliver the desired or the most relevant data in an efficient, timel ...
Read Project

 11

 FINISHED 
BRAVEHEALTH proposes a patient-centric vision to CVD management and treatment, providing people already diagnosed as subjects at risk with a sound solution for continuous and remote monitoring and real time prevention of malignant events. The solution proposed will be made up of the following sub-systems: 1)WEARABLE UNIT: it is an innovative concept of miniaturised multi-parameter sensor, able to ...
Read Project

 18

 FINISHED 

Next Generation Peer-to-Peer Content Delivery Platform (P2P-Next)

Start date: Jan 1, 2008, End date: Apr 30, 2012,

P2P-Next develops an open source, efficient, trusted, personalized, user-centric, and participatory television and media delivery system with social and collaborative connotation using the emerging Peer-to-Peer (P2P) paradigm, which takes into account the existing EU legal framework.The P2P-Next integrated project will build a next generation Peer-to-Peer (P2P) content delivery platform, to be des ...
Read Project

 22

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

Due to technology limitations, the domain of high-performance processors is experiencing a radical shift towards parallelism through on-chip multi-cores and chip customization leading to heterogeneous multi-core systems. Furthermore, the commodity market, the supercomputing market and the embedded market are increasingly sharing the same challenges, leading to convergence of the three markets.The ...
Read Project

 14

 FINISHED 

Aligning ResearCh AgenDas In ARTEMIS (ARCADIA)

Start date: Nov 1, 2009, End date: Jan 31, 2012,

There is a clear need for an ambitious pan-European approach to speed up the development of major technologies, by undertaking at the Community level large research actions taking into account National and Regional strategic R&D priorities. In the field of the Embedded Systems, ARTEMIS ETP has paved the way, but the ambition to align the research agendas drawn by the various European National/Regi ...
Read Project

 9

 FINISHED 
The White Paper on EU Transport Policy for 2010 states a key objective: 50% reduction of casualties due to road accidents by the end of 2010. Improvements on road safety are achievable increasing the EU market penetration of advanced driver assistance systems (ADAS), currently limited by performance and cost of sensor technologies.According to ICT-2007.6.1, ADOSE addresses research challenges in t ...
Read Project

 15

 FINISHED 

ICT Enabled Prediction of Cancer Reoccurrence (NeoMark)

Start date: Jun 1, 2008, End date: Sep 30, 2011,

Description NeoMark will record and combine heterogeneous clinical, laboratory, molecular and imaging data to develop a data integration environment facilitating multiscale and multilevel modelling.Objectives of the projectThe clinical problemThe continuous improvement in treatment protocols for neoplastic diseases has substantially incre ...
Read Project

 10

 FINISHED 

TERABIT MAGNETIC STORAGE TECHNOLOGIES (TERAMAGSTOR)

Start date: May 1, 2008, End date: Jul 31, 2011,

Description future perpendicular magnetic storage media with areal density larger than 1 bit/in2TERAMAGSTOR is an EU funded FP7 STREP project which aims to produce the next generation of perpendicular magnetic storage media with an areal density greater than 1Tbit/in2. Leading research groups and industrial partners from around Europe hav ...
Read Project

 9

 FINISHED 

Open Public Extended Network metering (OPEN meter)

Start date: Jan 1, 2009, End date: Jun 30, 2011,

New smart multi-metering or multi-functional Advanced Metering Infrastructure (AMI) is capable of creating value for energy consumers, network operators, metering operators and retailers. AMI will provide better services for customers in various ways: not only by more accurate metering and billing, but also by easing the supplier switching process and also by facilitating demand response to price ...
Read Project

 20

 FINISHED 
As miniaturization of the CMOS technology advances designers will have to deal with increased variability and changing performance of devices. Intrinsic variability of devices which begins to be visible in 65nm devices already will become much more significant in smaller technologies. Soon it will not be possible to design systems using current methods and techniques.Scaling beyond the 32 nm techn ...
Read Project

 6

 FINISHED 
The primary aim of the ARAGORN project is to research and develop a Cognitive Resource Manager (CRM) that aims to ensure that efficient use is made of both node-local and shared resources in a collaborative wireless system. These include, for example, local energy consumption and shared use of available bandwidth. In order to achieve this, ARAGORN will develop a range of standardised interfaces, u ...
Read Project

 8

 FINISHED 
The SHARE project aims to facilitate open source software code sharing and utilisation within the embedded system domain, creating a nurturing environment for applications and solutions to be developed on OSS middleware, and paving the way for new business models and services. The focus of the project will be on:- Middleware for mission critical applications- Middleware for nomadic networks applic ...
Read Project

 10

 FINISHED 

Open Media Platform (OMP)

Start date: Jan 1, 2008, End date: Dec 31, 2009,

Supporting the next generation of content-rich networked services on mobile devices is presenting major technical challenges for Europe's semiconductor and Consumer Electronics industries. Unlike the standard PC architecture, these devices have huge variation in multimedia capability and must operate under widely varying network conditions. Software complexity growth on these devices is now outpac ...
Read Project

 8