Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Understanding how brain controls social interactions is one of the central goals of neuroscience. Whereas social interactions and their effects on the emotional state of an individual are relatively well described at the behavioral level, much less is known about neural mechanisms involved in these very complex phenomena, especially in the amygdala, a key structure processing emotions in the brain ...
Read Project

 1

 FINISHED 
During S-phase newly synthesized “sister” DNA molecules become physically connected. This sister chromatid cohesion resists the pulling forces of the mitotic spindle and thereby enables the bi-orientation and subsequent symmetrical segregation of chromosomes. Cohesion is mediated by ring-shaped cohesin complexes, which are thought to entrap sister DNA molecules topologically. In mammalian cells, c ...
Read Project

 2

 FINISHED 
Cellular proteins are prone to misfolding and aggregation, particularly under harsh environmental conditions. To counteract this danger, all organisms from bacteria to humans evolved sophisticated protein quality control networks. The mechanisms employed in them tend to represent some of the most exciting biochemistry occurring in living cells.In Gram-positive bacteria, the key factors combating p ...
Read Project

 2

 FINISHED 

Arctic Impact on Weather and Climate (Blue-Action)

Start date: Dec 1, 2016, End date: Feb 28, 2021,

Blue-Action will provide fundamental and empirically-grounded, executable science that quantifies and explains the role of a changing Arctic in increasing predictive capability of weather and climate of the Northern Hemisphere.To achieve this Blue-Action will take a transdisciplinary approach, bridging scientific understanding within Arctic climate, weather and risk management research, with key s ...
Read Project

 40

 FINISHED 

Collective effects and optomechanics in ultra-cold matter (ColOpt)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The network “Collective effects and optomechanics in ultra-cold matter” (ColOpt) will train early-stage researchers (ESR) in fundamental science and applications in the areas of cold atom and quantum physics, optical technologies and complexity science to promote European competiveness in emergent quantum technologies. It consists of nine academic nodes and three companies from six European countr ...
Read Project

 13

 FINISHED 

Advanced Radio Astronomy in Europe (RadioNet)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Read Project

 29

 FINISHED 
ArrestAD proposes a novel and visionary thinking resulting from the demonstration of the central role of a particular heparan sulfate species at the intracellular level in neurons and in circulating cells in the molecular pathology of Alzheimer’s disease (AD). AD is a societal challenge for which there is neither prevention nor possible cure. Research in the field has long been refining classic co ...
Read Project

 8

 FINISHED 
FOIE GRAS provides innovative training for 13 early stage researchers (ESRs) to answer two critical and unanswered questions: a) Is hepatic bioenergetic remodelling involved in NAFLD pathogenesis, and target for stratification or therapeutic/lifestyle interventions? and b) Is the disruption of the gut-liver axis involved in NAFLD progression? In Western Societies, there has been a recent surge of ...
Read Project

 11

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
Background Olive groves extend over nearly five million hectares in the EU and are one of the main crops in Greece, Italy, Portugal and Spain. With nearly 1.9 million olive farms (Eurostat, 2007) the olive sector is a vital source of employment and economic activity in many European regions. In Andalusia almost 100 000 ha of olive groves are located in in ...
Read Project

 5

 FINISHED 
Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Read Project

 39

 FINISHED 
A major goal in biology is to understand how gene regulatory information is encoded by the human genome and how it defines different gene expression programs and cell types. Enhancers are genomic elements that control transcription, yet despite their importance, only a minority of enhancers are known and functionally characterized. In particular, their activity changes during cellular signalling o ...
Read Project

 2

 FINISHED 
The major aim of Bio4Med (Biology for Medicine) programme is to provide unique, international, inter-disciplinary and inter-sectoral doctoral training for Early Stage Researchers (ESRs) in the domain of biological bases of human diseases. To achieve this goal it combines 22 leading research groups at the Nencki Institute and their scientific partners from world-class laboratories located in EU Mem ...
Read Project

 1

 FINISHED 
Myelodysplastic syndromes (MDS) are chronic bone marrow malignancies of the elderly, complicated by severe anaemia. MDS significantly affects quality-adjusted survival and it imposes an increasing financial burden on patients and healthcare (HC) systems. The burden of disease is expected to worsen in the future, given the aging EU population and newly identified MDS cases among those diagnosed wit ...
Read Project

 16

 FINISHED 
MAGIC Post Stroke Project Team has united members from across Europe, dedicated to enable significant change in the delivery of health & social care (H&SC) services for patients post stroke. The consortium has recognised a significant gap in care associated with the recovery of such patients & we need a new way of meeting the needs of 508,000 new post stroke EU citizens/ year. Demographic changes ...
Read Project

 14

 FINISHED 
The growing share of variable renewable energy necessitates flexibility in the electricity system, which flexible energy generation, demand side participation and energy storage systems can provide. SIMBLOCK will develop innovative demand response (DR) services for smaller residential and commercial customers, implement and test these services in three pilot sites and transfer successful DR models ...
Read Project

 17

 FINISHED 
"NanoPack will demonstrate a solution for extending food shelf life by using novel smart antimicrobial surfaces, applied in active food packaging products. It will run pilot lines in operational industrial environments to manufacture commercially feasible antimicrobial polymer films, accepted by consumers. It will minimize the amount of preservatives required to maintain freshness, add value and a ...
Read Project

 19

 FINISHED 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Read Project

 14

 FINISHED 

European Prevention of Alzheimer’s Dementia Consortium (EPAD)

Start date: Jan 1, 2015, End date: Dec 31, 2019,

Background:The secondary prevention of Alzheimer’s dementia (AD) is achievable if we can identify individuals at risk of disease progression defined by biomarker evidence of AD pathology and no or only minimal clinical symptoms and engage them in a standing adaptive clinical trial, of the highest quality, testing multiple interventions. To achieve this, EPAD will also provide the analytical infras ...
Read Project

 40

 FINISHED 
Blood-based biomarkers such as Circulating Tumor Cells (CTCs), circulating free tumor DNA (cfDNA) and microRNAs (miRNAs) have the potential to improve the development of personalized medicines for cancer patients. This is of particular importance when biopsies of the primary tumor or metastases are not accessible (e.g. at early disease stages or in minimal residual disease) or possible and the ass ...
Read Project

 34

 FINISHED 
Colorectal cancer represents around one tenth of all cancers worldwide. Early and accurate diagnosis and precise intervention can increase cure rate up to 90%. Improved diagnostic techniques with enough sensitivity and specificity are required to allow in situ assessment, safe characterization and resection of lesions during clinical practice interventions.The multidisciplinary PICCOLO team propos ...
Read Project

 10

 FINISHED 
The GOFLEX project will innovate, integrate, further develop and demonstrate a group of electricity smart-grid technologies, enabling the cost-effective use of demand response in distribution grids, increasing the grids’ available adaptation capacity and safely supporting an increasing share of renewable electricity generation. The GOFLEX smart grid solution will deliver flexibility that is both g ...
Read Project

 12

 FINISHED 
Nowadays Russian and Chinese universities have to offer programs which facilitate graduates’ adaptation to the real manufacturing and business environment and raise their competitiveness at the labor market. In order to develop a qualitative program is necessary to establish close links with business community as well as European universities which have rich experience in development of similar pr ...
Read Project

 10

 FINISHED 
European business sector pays an ever more increasing attention to competences such as sense of initiative and entrepreneurship. The recommendation 2006/962/EC on key competences for lifelong learning highlights paramount importance of these key competences for employability. These competences related to entrepreneurship play a paramount role in EU neighbouring countries in their development proc ...
Read Project

 14

 FINISHED 
NIMBLE: collaboration Network for Industry, Manufacturing, Business and Logistics in Europe will develop the infrastructure for a cloud-based, Industrie 4.0, Internet-of-things-enabled B2B platform on which European manufacturing firms can register, publish machine-readable catalogs for products and services, search for suitable supply chain partners, negotiate contracts and supply logistics, and ...
Read Project

 17

 FINISHED 
In the aerospace industry very high quality standards have to be met. For the manufacturing of carbon fibre parts this is currently solved through extended end-of-line inspection in combination with re-work processes to deal with defective parts. Also, in-situ visual inspection is used for quality control, which is currently causing huge productivity losses (30%-50%) during lay-up and has become a ...
Read Project

 7

 FINISHED 

Deutschland in EU: Geschichte des beiderseitigen Erfolges

Start date: Sep 1, 2016, End date: Aug 31, 2019,

This project should deepen the knowledge about EU at the regional level. On the one hand, a single country and its European integration should be in the focus, and the causes and results of the EU involvement and the effects of this process for the EU on the other hand. The project should promote existing EU studies at the Dostoevsky Omsk State University. The basic objective of the project is to ...
Read Project

 1

 FINISHED 

Co-creation - A method to develop sustainable welfare solutions

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The “Co-creating Welfare” project is motivated by a broadly political acknowledged need for re-organisation within the welfare sector in order to obtain a more sustainability and cost effectiveness. Local authorities are currently struggling with budget cut-downs in the welfare sector, mainly due to consequenses of the hardly ended worldwide financial crisis. As a response to the need for re-organ ...
Read Project

 5

 FINISHED 

Botanical Garden: COME IN! VSTUPTE! KOM IN! WEJDŹ! GYERE BE!

Start date: Sep 1, 2016, End date: Aug 31, 2019,

The project Botanical Garden: COME IN! VSTUPTE! ANGE! WPISAĆ! BELÉP! is based on the development, passing on and setting up innovative practices in the field of making botanic gardens more accessible to the general public with emphasis on visitors with special needs. The project continues and develops an already functioning system of activities which make Prague botanic garden more accessible to p ...
Read Project

 4

 FINISHED 

Promoting quality culture in VET

Start date: Oct 1, 2016, End date: Aug 31, 2019,

Background The issue of quality and quality management in VET constitutes one of the major fields for development for the last 40 years and in European Union a lot of resources have been devoted to increase the quality of VET. More than 50 different models have been developed within LLP-program, focusing on different aspect of Quality management in VET. Despite all the effort, the experiences show ...
Read Project

 6

 FINISHED 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Read Project

 34

 FINISHED 
CELBICON aims at the development, from TRL3 to TRL5, of new CO2-to-chemicals technologies, conjugating at once small-scale for an effective decentralized market penetration, high efficiency/yield, low cost, robustness, moderate operating temperatures and low maintenance costs.In line with the reference Topic text, these technologies will bridge cost-effective CO2 capture and purification from the ...
Read Project

 13

 FINISHED 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Read Project

 19

 FINISHED 
The main objective of POWER2DM is to develop and validate a personalized self-management support system (SMSS) for T1 and T2 diabetes patients that combines and integrates (1) a decision support system (DSS) based on leading European predictive personalized models for diabetes interlinked with predictive computer models, (2) automated e-coaching functionalities based on Behavioural Change Theories ...
Read Project

 8

 FINISHED 
"This project will be the first to engage in a comprehensive study of the role of genes and gene-environment (GxE) interaction on reproductive behaviour. Until now, social science research has focussed on socio-environmental explanations, largely neglecting the role of genes. Due to unprecedented advances in molecular genetics over the last two decades, for the first time in history we are able to ...
Read Project

 2

 FINISHED 

A network slice for every service (5GPagoda)

Start date: Jul 1, 2016, End date: Jun 30, 2019,

5G!Pagoda represents the next evolution step in softwarized networks as supported by NFV, SDN and aimed at by the 5G network evolution. The top objectives of 5G!Pagoda are i) the development of a scalable 5G slicing architecture towards supporting specialized network slices composed on multi-vendor network functions, through the development of ii) a scalable network slice management and orchestrat ...
Read Project

 7

 FINISHED 
The main objective of this ID-Lyme project is to push to the market a novel test, the Ixodes kit, for the early detection of Lyme Borreliosis (LB), also known as Lyme disease. LB can usually be treated using cost-effective antibiotics at an early stage of disease. Unfortunately, standard laboratory testing is often unable to give a clear diagnosis whether a patient is infected or not. This can res ...
Read Project

 5

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 

O.M.P.M. LiferCraft Tail Innovative Tool Assembly (OLTITA)

Start date: Nov 1, 2016, End date: Jun 30, 2019,

The aim of this proposal is to develop, design, manufacture and deliver to the Core Partner of the Call For Core Partner AIR-02-02, the prototype assembly and transportation tooling for all components of the LifeRCraft Rotorless Tail that belong to the WP_B4.1 “Rotorless Tail for LifeRCraft” i.e.: Tail Boom, Horizontal Stabilizer, Vertical stabilizer, Control Surfaces, Upper Tail Boom Fairing. Com ...
Read Project

 1

 FINISHED 

O.M.P.M LiferCraft Fabrication Innovative Tool Tail (OLFITT)

Start date: Sep 1, 2016, End date: Jun 30, 2019,

The aim of this proposal is to develop, design, manufacture and deliver to the Core Partner of the Call For Core Partner AIR-02-02, the prototype manufacturing tooling to fabricate all composite parts of the LifeRCraft Rotorless Tail that belong to the WP_B4.1 Rotorless Tail for LifeRCraft i.e.: Tail Boom, Horizontal Stabilizer, Vertical stabilizer, Control Surfaces, Upper Tail Boom Fairing. Accor ...
Read Project

 1