Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through ...
Read Project

 39

 FINISHED 
Failure of large complex engineering systems often leads to catastrophic consequences. Their efficient and safe design and operation will avoid or reduce malfunctions, failures and accidents, which would have a significant impact on the daily life of the public in terms of service and product delivery, business interruption, economic losses, human injuries/fatalities, and property and environmenta ...
Read Project

 5

 FINISHED 
Today, intralogistic services have to respond quickly to changing market needs, unforeseeable trends and shorter product life cycles. These drivers pose new demands on intralogistic systems to be highly flexible, rock-solid reliable, self-optimising, quickly deployable and safe yet efficient in environments shared with humans. ILIAD will enable the transition to automation of intralogistic service ...
Read Project

 9

 FINISHED 
This research brings together the complementary expertise of our consortium members to gain a better understanding of the physics in hydraulic fracturing (HF) with the final goal to optimize HF practices and to assess the environmental risks related to HF. This requires the development and implementation of reliable models for HF, scaled laboratory tests and available on-site data to validate the ...
Read Project

 6

 FINISHED 
HarmonicSS vision is to create an International Network and Alliance of partners and cohorts, entrusted with the mission of addressing the unmet needs in primary Sjogren Syndrome; working together to create and maintain a platform with open standards and tools, designed to enable secure storage, governance, analytics, access control and controlled sharing of information at multiple levels along wi ...
Read Project

 39

 FINISHED 

DARIAH ERIC Sustainability Refined (DESIR)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Europe has a long and rich tradition as a centre for the arts and humanities. However, the digital transformation poses challenges to the arts and humanities research landscape all over the world. Responding to these challenges the Digital Research Infrastructure for Arts and Humanities (DARIAH) was launched as a pan-European network and research infrastructure. After expansion and consolidation, ...
Read Project

 18

 FINISHED 

Quantum sensors - from the lab to the field (Q-Sense)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Q-SENSE will promote international and inter-sector collaboration for the advancement of science and the development of innovation in the area of cold atom quantum sensors. In particular it fosters a shared culture of research and innovation that turns the Nobel-prize winning ideas of cold atom research and precision measurement (Nobel prizes 1997 and 2005) into innovative products. In particular, ...
Read Project

 10

 FINISHED 

Massive InteGRATion of power Electronic devices (MIGRATE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Read Project

 24

 FINISHED 
COMPARE aims to harness the rapid advances in molecular technology to improve identification and mitigation of emerging infectious diseases and foodborne outbreaks. To this purpose COMPARE will establish a “One serves all” analytical framework and data exchange platform that will allow real time analysis and interpretation of sequence-based pathogen data in combination with associated data (e.g. c ...
Read Project

 32

 FINISHED 

European Multimodal and Digital Education for Language Learning

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Context/background:Digital literacy and proficiency in English for international communication are essential requirements for graduates’ access to today’s European labour market. While the two are often held separate in higher education curricula, there is a strong need for designing courses that integrate abilities for the creation and critical interpretation of multimodal digital texts in Englis ...
Read Project

 7

 FINISHED 

HYDRALAB+ Adapting to climate change (HYDRALAB-PLUS)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

HYDRALAB is an advanced network of environmental hydraulic institutes in Europe, which has been effective in providing access to a suite of major and unique environmental hydraulic facilities from across the whole European scientific community.A continuation project will prepare environmental hydraulic modelling for the upcoming urgent technical challenges associated with adaptations for climate c ...
Read Project

 24

 FINISHED 

SoBigData Research Infrastructure (SoBigData)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

One of the most pressing and fascinating challenges scientists face today, is understanding the complexity of our globally interconnected society. The big data arising from the digital breadcrumbs of human activities promise to let us scrutinize the ground truth of individual and collective behaviour at an unprecedented detail and scale. There is an urgent need to harness these opportunities for s ...
Read Project

 12

 FINISHED 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Read Project

 19

 FINISHED 

Intelligent Portable ContROl SyStem (iCROSS)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

iCROSS envisages to enable faster thorough border control for third country nationals crossing the borders of EU, with technologies that adopt the future development of the Schengen Border Management. The project will present an optimal mixture of an enhanced, voluntary form of a Registered Traveller Programme and an auxiliary solution for the Entry/Exit System based on involving bona fide travell ...
Read Project

 13

 FINISHED 

European E-Infrastructure Services Gateway (eInfraCentral)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

EInfraCentral's mission is to ensure that by 2020 a broader/ more varied set of users (including industry) benefits from European infrastructures. A common approach to defining and monitoring e-infrastructures services will increase their uptake. It will also enhance understanding of where improvement can be made in delivering services. The challenge is to shift towards an e-Infrastructure ''mark ...
Read Project

 9

 FINISHED 
Composite structures are massively exploited in many engineering fields. For instance, the state-of-the-art civil aircraft (B787 and A350) are mostly made of composite materials. The design of composites leads to challenging tasks since those competencies that stemmed from the adoption of metallic materials are often inadequate for composites. Insights on many different disciplines and tight acade ...
Read Project

 6

 FINISHED 

REFLECT LAB - Supporting lecturers in applying inquiry based learning

Start date: Nov 1, 2016, End date: Apr 30, 2019,

...he focus of discussion and research. Thus cross-section competences will be generated, which are essential for all addressed target groups.The consortium consists of the applicant Leibniz University of Hannover (Institute of Civic Education), the University La Laguna (Spain), the Alexandru Ioan Cuza University in Iasi (Romania), the Nicolaus Copernicus University in Torun (Poland) and the Manchest ...
Read Project

 5

 FINISHED 

DiasporaLink

Start date: Feb 1, 2015, End date: Jan 31, 2019,

DiasporaLink is a 4-year exchange program between 24 universities and research institutes representing EU, the Americas, Africa and Australia and will investigate, evaluate and facilitate transnational diaspora entrepreneurship, TDE as driver of development and wealth creation in countries of origin and residence. • The partners in DiasporaLink have together a unique possibility to have a substant ...
Read Project

 15

 FINISHED 
IMI’s Call 8 is geared to develop knowledge frameworks for ‘druggable mechanisms’ for two domains of pathophysiology. In response to this call, we propose (I) the development of a generic AETIONOMY pipeline to capture and infer over mechanistic knowledge of pathophysiology, and (II) the focused application of this pipeline to derive clinically significant mechanistic taxonomies of neurodegenerativ ...
Read Project

 20

 FINISHED 

Efficient harvesting of the wind energy (AEOLUS4FUTURE)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

As wind energy is considered one of the most promising renewable energy resources, energy production technologies relying on wind energy are currently flourishing under the EU ambitious plan for 2020. Market demands to prepare a generation of researchers within the EU that are able to face the challenge of fulfilling the EU ambitious plan, to sustain the production of wind energy and to innovate a ...
Read Project

 10

 FINISHED 

Socialising Sensori-Motor Contingencies (socSMCs)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

As robots become more omnipresent in our society, we are facing the challenge of making them more socially competent. However, in order to safely and meaningfully cooperate with humans, robots must be able to interact in ways that humans find intuitive and understandable. Addressing this challenge, we propose a novel approach for understanding and modelling social behaviour and implementing social ...
Read Project

 11

 FINISHED 

AFEL - Analytics For Everyday Learning (AFEL)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

The goal of AFEL (Analytics for Everyday Learning) is to develop, pilot and evaluate methods and applications, which advance informal/collective learning as it surfaces implicitly in online social environments. The project is following a multi-disciplinary, industry-driven approach to the analysis and understanding of learner data in order to personalize, accelerate and improve informal learning p ...
Read Project

 5

 FINISHED 
Smart mechatronic structures of the future will have to be extremely energy efficient and self-powering in as many situations as possible. In addition to capabilities such as sensing and reacting to their environment in a predictable and desired manner, the next generation of smart structures will have to exhibit top class energy efficiency.In the context of the proposed ANTARES project (Advanced ...
Read Project

 9

 FINISHED 
SmokeBot is driven by the application needs for robots that operate in domains with restricted visibility. The focus is on civil robots supporting fire brigades in search and rescue missions, e.g. in post-disaster management operations in response to tunnel fires. Existing sensor technology and the related cognitive approaches cannot cope with such demanding conditions. SmokeBot addresses this sho ...
Read Project

 6

 FINISHED 

Health Care Work Exchange 2016

Start date: Jun 1, 2016, End date: May 31, 2018,

...hools throughout Germany are actively involved in the project partner network “Health Care Work Exchange” administered by the EU Liaison Office (EU-Hochschulbüro Hannover/ Hildesheim) at the Leibniz Universität Hannover. Meanwhile more than a hundred partner organizations throughout Europe, such as university teaching hospitals, private medical practices, rehabilitation centers, public and private ...
Read Project

 39

 FINISHED 
The project HERCULES-2 is targeting at a fuel-flexible large marine engine, optimally adaptive to its operating environment. The objectives of the HERCULES-2 project are associated to 4 areas of engine integrated R&D:• Improving fuel flexibility for seamless switching between different fuel types, including non-conventional fuels.• Formulating new materials to support high temperature component ap ...
Read Project

 33

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
"ABYSS is a training and career development platform for young scientists in Geodynamics, Mineralogy, Hydrodynamics, Thermodynamics and (Bio-)Geochemistry focusing on mid-ocean ridge processes and their environmental and economic impacts. It brings together 10 European research groups internationally recognized for their excellence in complementary disciplines and 4 Associated Partners from the Pr ...
Read Project

 10

 FINISHED 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Read Project

 17

 FINISHED 
"The key objective of the M4CO2 project is to develop and prototype Mixed Matrix Membranes based on highly engineered Metal organic frameworks and polymers (M4) that outperform current technology for CO2 Capture (CO2) in pre- and post-combustion, meeting the energy and cost reduction targets of the European SET plan.By applying the innovative concept of M4 by a consortium of world key players, con ...
Read Project

 17

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 

FUTURE ATOMIC CLOCK TECHNOLOGY (FACT)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

During the last decades atomic clocks and frequency standards have become an important resource for advanced economies with impact ranging from satellite navigation (GPS, GLONASS, Galileo) to high speed communication networks, where they ensure synchronisation of data packets at ever higher bit rates. In this field the wake of the new millennium has been marked by the invention of frequency comb t ...
Read Project

 15

 FINISHED 

Health Care Work Exchange 2015

Start date: Jun 1, 2015, End date: May 31, 2017,

...cation and training abroad. Since 2007 over 30 vocational schools throughout Germany have joined a consortium administered by the EU Liaison Office (EU-Hochschulbüro Hannover/ Hildesheim) at the Leibniz Universität Hannover with the aim to design and implement a mobility project that meets students’ needs for high-quality and technically challenging internships abroad. In addition, more than 100 p ...
Read Project

 38

 FINISHED 
Developing robust, reproducible, interoperable and collaborative hyper-models of diseases and normal physiology is a sine qua non necessity if rational, coherent and comprehensive exploitation of the invaluable information hidden within human multiscale biological data is envisaged. Responding to this imperative in the context of both the broad Virtual Physiological Human (VPH) initiative and the ...
Read Project

 17

 FINISHED 
Most plants use the C3 pathway of photosynthesis that is compromised by gross inefficiencies in CO2 fixation. However, some plants use a super-charged photosynthetic mechanism called C4 photosynthesis. The C4 pathway is used by the most productive vegetation and crops on Earth. In addition to faster photosynthesis, C4 plants demand less water and less nitrogen. Overall, our aim is to introduce the ...
Read Project

 20

 FINISHED 

European Bank for induced pluripotent Stem Cells (EBISC)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

EBiSC is designed to address the increasing demand by iPSC researchers for quality-controlled, disease-relevant research grade iPSC lines, data and cell services. Its goal is to demonstrate an operational banking and distribution service of iPSC lines after 3 years and to establish subsequently for Europe a centralised, not-for-profit bank providing all qualified users with access to scalable, cos ...
Read Project

 30

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
This proposal aims at collecting and analysing facts and figures in order to assess the current legislation on the therapeutic use of somatic cells, and to bridge it with the research infrastructure capacity building. Although EU has adopted 3 Directives on Tissues and cells between 2004 and 2006 to harmonise the procurement, storage and use of cells for therapeutic use in Europe, countries have i ...
Read Project

 9

 FINISHED 
Exaflop computing will make a considerable impact on several areas of engineering and applied sciences, where current high-end computing capabilities are deemed grossly insufficient. The overall aim of the NUMEXAS project is to develop, implement and validate the next generation of numerical methods to be run under exascale computing architectures. This will be done by implementing a new paradigm ...
Read Project

 5

 FINISHED 

Technology Transfer in Computing Systems (TETRACOM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Read Project

 33