Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Read Project

 14

 FINISHED 

A network slice for every service (5GPagoda)

Start date: Jul 1, 2016, End date: Jun 30, 2019,

5G!Pagoda represents the next evolution step in softwarized networks as supported by NFV, SDN and aimed at by the 5G network evolution. The top objectives of 5G!Pagoda are i) the development of a scalable 5G slicing architecture towards supporting specialized network slices composed on multi-vendor network functions, through the development of ii) a scalable network slice management and orchestrat ...
Read Project

 7

 FINISHED 
The fifth-generation (5G) is coming.Quo vadis 5G?What architectures, network topologies and technologies will define it?Are methodologies to the analysis, design and optimization of current cellular networks still applicable to 5G? 5Gwireless is the first integrated and multi-disciplinary training-through-research network of ESRs and Senior Supervisors fully committed to re-architecting current ce ...
Read Project

 10

 FINISHED 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Read Project

 19

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Read Project

 8

 FINISHED 
The INPUT Project aims at designing a novel infrastructure and paradigm to support Future Internet personal cloud services in a more scalable and sustainable way and with innovative added-value capabilities. The INPUT technologies will enable next-generation cloud applications to go beyond classical service models, and even to replace physical Smart Devices, usually placed in users’ homes (e.g., s ...
Read Project

 9

 FINISHED 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Start date: Nov 1, 2015, End date: Oct 31, 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Read Project

 16

 FINISHED 
SATORI is a 45-month project, comprising 17 partners from 13 countries, including an intergovernmental organisation, the aim of which is to improve respect of ethics principles and laws in research and innovation, and to make sure that they are adequately adapted to the evolution of technologies and societal concerns. The partners will develop an ethics assessment framework based on thorough analy ...
Read Project

 19

 FINISHED 
"Measurement for Europe: Training and Research for Internet Communications Science (METRICS) METRICS will offer a unique training and research opportunity for 13 ESRs and one ER in a network comprising seven partners and nine associate partners. The METRICS network comprises four strong academic partners (Aalto, UC3M, UCAM, UCL), three vendors (NEC, Ericsson, Narus), four ISPs (BT, TID, IIJ, Elisa ...
Read Project

 7

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Read Project

 24

 FINISHED 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Read Project

 19

 FINISHED 
The mmMAGIC (Millimetre-Wave Based Mobile Radio Access Network for Fifth Generation Integrated Communications) project will develop and design new concepts for mobile radio access technology (RAT) for mm-wave band deployment. This is envisaged as a key component in the 5G multi-RAT ecosystem and will be used as a foundation for global standardization. The project will thus enable ultrafast mobile ...
Read Project

 19

 FINISHED 
At the moment European countries are not obliged to have a (virtual) registry of infrastructures, however public administrations, private or public enterprises and citizens feel the need of knowing how the various infrastructures are placed and managed and which are the relative responsabilities and properties as the lack of a single and common registry generates conflicts of competence between op ...
Read Project

 12

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Read Project

 8

 FINISHED 
Description The Challenge:The advent of cloud applications and the proliferation of mobile devices have imposed a dramatic increase of the IP traffic. The emerging ZetaByte Era forces operators to seek a cost-efficient way of upgrading their network in order to accommodate the vast amount of data without compromising QoS and wasting bandwidt ...
Read Project

 7

 FINISHED 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Start date: Oct 1, 2011, End date: Sep 30, 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Read Project

 45

 FINISHED 
The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Read Project

 16

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Start date: Jan 1, 2012, End date: Feb 29, 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Read Project

 14

 FINISHED 
Objectives: The general goal of this project is the industrialization of 28/20nm Fully Depleted (FD) Silicon On Insulator (SOI) Technology platforms, enabling 2 different sources in 2 different European countries. The project also aims at establishing and reinforcing a design ecosystem in Europe using these platforms. Last, the project considers extremely important to explore extension towards FD ...
Read Project

 22

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Start date: Jan 1, 2013, End date: Dec 31, 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Read Project

 42

 FINISHED 
The e-HIMALAYA project aims at prototyping innovative GNSS-based core technologies and concepts, with the objective to build key Galileo differentiators in a multi-GNSS hybridized receiver.Several markets are addressed with the main weight put on Mass-Market and transport, which represents the main Galileo receiver market.The project will develop a list of key features to enable a higher penetrati ...
Read Project

 7

 FINISHED 
Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Read Project

 23

 FINISHED 
The INFINITY Support Action will have a positive impact on the success of the FI-PPP programme. Through collaboration with organisations across Europe, INFINITY will capture and communicate information about available infrastructures and any interoperability requirements and issues. INFINITY will document any usage-related operational constraints and seek to identify and foster federation opportun ...
Read Project

 14

 FINISHED 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Read Project

 41

 FINISHED 

low Energy COnsumption NETworks (ECONET)

Start date: Oct 1, 2010, End date: Dec 31, 2013,

Nowadays, it is widely recognised that the sole introduction of low consumption silicon elements will not be sufficient to effectively curb tomorrow's network energy requirements. Based on this assumption, the ECONET project will investigate, develop and test new capabilities for the Future Internet devices enabling the efficient management of power consumption so to strongly reduce the current en ...
Read Project

 15

 FINISHED 

SmartSantander

Start date: Sep 1, 2010, End date: Nov 30, 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Read Project

 24

 FINISHED 
Energy efficiency is strictly related to CO2 emissions and by its nature is a global issue.Traffic and transport have the potential of producing savings in energy consumptions that are potentially estimated in 26%. Looking at the traffic and transport system as a whole, energy is addressed in the traffic environment through different angles:•\tVehicle fuel consumption: Savings can be achieved by a ...
Read Project

 13

 FINISHED 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Read Project

 29

 FINISHED 
The ENIAC JU project MIRANDELA is building a complete digital, mixed-signal, analogue, radio frequency (RF) and millimetre-wave (MMW) platform for the design and production of chips for future wireless communications to address the challenge of transferring anything, from/to anybody, anywhere, at any time and through any path. Components in core CMOS technology and other processes will be characte ...
Read Project

 24

 FINISHED 

Instant Mobility for Passengers and Goods (Instant Mobility)

Start date: Apr 1, 2011, End date: Mar 31, 2013,

The Instant Mobility project has created a concept for a virtual "Transport and Mobility Internet", a platform for information and services able to support radically new types of connected applications for scenarios centred on the stakeholder groups:•\tmultimodal travellers•\tdrivers & passengers•\tpassenger transport operators•\tgoods vehicle operators•\troad operators & traffic managers.The proj ...
Read Project

 24

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

Publish Subscribe Internet Technology (PURSUIT)

Start date: Sep 1, 2010, End date: Feb 28, 2013,

The current Internet architecture focuses on communicating entities, leaving aside the exchanged information. However, trends show that WHAT is exchanged is becoming more important than WHO are exchanging it. As a result, the Internet is effectively moving from interconnecting machines to interconnecting information, questioning the necessity of endpoint identifiers as a foundation of internetwork ...
Read Project

 8

 FINISHED 

EXpAnding LTE for Devices (EXALTED)

Start date: Sep 1, 2010, End date: Feb 28, 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Read Project

 16

 FINISHED 

Internet of Things Initiative (IoT-i)

Start date: Sep 1, 2010, End date: Nov 30, 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Read Project

 17

 FINISHED 

Energy Aware Radio and neTwork tecHnologies (EARTH)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

Telecommunication networks and in particular mobile communications are increasingly contributing to global energy consumption. The EARTH proposal tackles the important issue of energy saving by enhancing the energy efficiency of mobile broadband systems thereby reducing CO2 emissions. It is a highly ambitious and unique proposal, applying an integrated approach to investigate the energy efficiency ...
Read Project

 15