Search for European Projects

19 European Projects Found

Searched on 125080 European Projects

 FINISHED 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Start date: May 1, 2013, End date: Apr 30, 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Read Project

 27

 FINISHED 

Technology Transfer in Computing Systems (TETRACOM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr ...
Read Project

 33

 FINISHED 

Safety of ACtinide Separation proceSSes (SACSESS)

Start date: Mar 1, 2013, End date: Jun 30, 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Read Project

 26

 FINISHED 
PV CROPS addresses 3 key objectives of the call topic:1) Improvement of performance, reliability and lifetime2) Cost reduction of PV systems3) Better integration of PV into gridThe 2 first objectives lead to a lower Levelized Cost of Energy, LCoE. So, the main objectives of PV CROPS are:1- Reduction of 30% of the LCoE of PV to achieve 0.14-0.07 €/kWh by 2020 and 0.20–0.09 €/kWh by 2015 and an incr ...
Read Project

 12

 FINISHED 

Additive Manufacturing for Wear and Corrosion Applications (AMCOR)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

AMCOR will develop and demonstrate Laser Metal Deposition (LMD) industrial manufacturing systems for the deposition of functional graded coatings (FGM) and 3D features onto metallic components supplied by industry that are subjected to in-service wear and corrosion. This will be supported by the development, production and testing of mixed powder combinations for coatings suitability.The proposed ...
Read Project

 16

 FINISHED 
The dominant approach in offering cloud services is based on homogeneous commodity resources: large numbers of inexpensive machines, interconnected by off-the-shelf networking equipment, supported by stock disk drives. This is consistent with the predominant business model for data centre cloud computing, which leverages homogeneous computation, communication, and storage to provide low-cost appli ...
Read Project

 6

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 
In all industrial sectors, Non Destructive Evaluation techniques play a critical role for ensuring structures reliability, plant safety and increasingly also for ensuring quality and efficiency of products and processes. The emerging use of numerical simulation is a major trend in the field with tremendous potential benefits in terms of costs reduction, enhanced diagnosis reliability and consequen ...
Read Project

 20

 FINISHED 
Carbon Capture and Sequestration has become an important technology to comply with the CO2 reduction targets set by the EC. However CCS has the drawback that the electrical efficiency of the coal fired power plant will drop significantly. To overcome this drawback, one has to increase the base efficiency of the power plant or increase the biomass co-firing share as this is a CO2 neutral energy sou ...
Read Project

 15

 FINISHED 
Description From theory to practice: Methods for an adaptive and prolonged child-robot interaction The goal of ALIZ-E is to develop novel methods for developing and testing interactive, mobile robots which will be able to socially interact with human users over extended periods of time, i.e. a pos ...
Read Project

 12

 FINISHED 

DC/DC COnverter-based Diagnostics for PEM systems (D-CODE)

Start date: Mar 1, 2011, End date: May 31, 2014,

"The D-CODE project aims at developing and implementing on-line electrochemical impedance spectroscopy (EIS) to have direct and meaningful information on the system status. EIS has been proven to be an effective diagnostic tool for laboratory tests. It will be implemented on-board thanks to a new DC/DC converter conceived by the D-CODE’s partners. The new hardware will be developed together with d ...
Read Project

 7

 FINISHED 

Low Emission Gas Turbine Technology for Hydrogen-rich Syngas (H2-IGCC)

Start date: Nov 1, 2009, End date: Apr 30, 2014,

The overall objective of this project is to provide and demonstrate technical solutions which will allow the use of state-of-the-art highly efficient, reliable gas turbines in the next generation of IGCC plants, suitable for combusting undiluted hydrogen-rich syngas derived from a pre-combustion CO2 capture process, with high fuel flexibility. The recognised challenge is to operate a stable and co ...
Read Project

 25

 FINISHED 
"In nuclear power plants, materials may undergo degradation due to severe irradiation conditions that may limit their operational life. Utilities that operate these reactors need to quantify the ageing and the potential degradations of some essential structures of the power plant to ensure safe and reliable plant operation. So far, the material databases needed to take account of these degradation ...
Read Project

 23

 FINISHED 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Start date: Mar 1, 2008, End date: Sep 30, 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Read Project

 35

 FINISHED 
"The NEMOPUR Initial Training Network will focus on creating a new generation of molecular purification technologies for Active Pharmaceutical Ingredient (API) manufacture, with a particular focus on removal of organic impurities from API production. New membranes with improved chemical stability in a wide range of solvents, and better controlled cutoff properties, novel molecularly imprinted poly ...
Read Project

 9

 FINISHED 

High Power Electric propulsion: a Roadmap for the future (HiPER)

Start date: Oct 1, 2008, End date: Jan 31, 2012,

The main objective of the HiPER project is to initiate technological and programmatic consolidation in the development of innovative electric propulsion technologies (and of the related power generation) to fulfill future European space transportation needs. The objective will be pursued by conceiving and substantiating a long term vision for European space transportation and exploration, conside ...
Read Project

 21

 FINISHED 

Mobile Energy Resources in Grids of Electricity (MERGE)

Start date: Jan 1, 2010, End date: Dec 31, 2011,

Electric power systems are facing a major new challenge (and hence opportunity): future massive integration in the electric grid of electric plug-in vehicles (EV). Distribution and transmission grids and power system architectures still follow planning rules and procedures defined for the traditional operational paradigm. Therefore, it is necessary to identify and prepare solutions for the operati ...
Read Project

 16

 FINISHED 

Trusted Architecture for Securely Shared Services (TAS3)

Start date: Jan 1, 2008, End date: Dec 31, 2011,

The TAS3 (Trusted Architecture for Securely Shared Services) proposes an Integrated Project that will develop and implement an architecture with trusted services to manage and process distributed personal information. This architecture will be dependable, robust but at the same time also cost-effective and reliable. The personal information that will be processed and managed can consist of any typ ...
Read Project

 20

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22