Search for European Projects

30 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

...ng and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, led by Wageningen UR and other core partners of previous key projects such as FIWARE and IoT-A, will leverage the ecosystem and architecture that was es ...
Read Project

 72

 FINISHED 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Read Project

 19

 FINISHED 

Optimization Driven Architectural Design of Structures (OptArch)

Start date: Feb 1, 2016, End date: Jan 31, 2020,

"According to UNEP, the building sector is estimated to be worth 10% of the global GDP and employs 111 million people. In addition, buildings use about 40% of global energy, 40% of global resources and emit approximately 33% of global GHG emissions. Finally, the fact that people today spend, on average, more than 80% of their time indoors, enhances its social importance. All above indicate the nec ...
Read Project

 12

 FINISHED 

European Joint Doctorate in Functional Materials Research (EJD-FunMat)

Start date: Jun 1, 2015, End date: May 31, 2019,

EJD-FunMat is a European Joint Doctoral programme in the field of functional materials research. EJD-FunMat is embedded in an existing research network, with previous experience in co-tutelle doctorates, but the project will add new major elements, with the strategic aim of becoming a permanent reference European Joint Doctoral School in Materials Science and beyond.The key innovative aspects of t ...
Read Project

 9

 FINISHED 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Read Project

 9

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 
... in Europe.While current projects concentrate on their specific objectives, EuCARD-2 brings a global view to accelerator research, coordinating a consortium of 40 accelerator laboratories, technology institutes, universities and industry to jointly address common challenges. By promoting complementary expertise, cross-disciplinary fertilisation and a wider sharing of knowledge and technologies thr ...
Read Project

 40

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
The DREAM project will lay the foundations for a novel heterarchical management approach of complex electrical power grids, providing new mechanisms for consumer involvement in economical and ecological electricity use as well as stable and cost effective integration of distributed renewable resources.Applying the principles of autonomous agent-based systems to the control and management of the el ...
Read Project

 15

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

...imulation, High Performance Computing, Medical Informatics, Neuromorphic Computing and Neurorobotics, and create a user community of research groups from within and outside the HBP, set up a European Institute for Theoretical Neuroscience, complete a set of pilot projects providing a first demonstration of the scientific value of the platforms and the Institute, develop the scientific and technolo ...
Read Project

 116

 FINISHED 

Future INternEt Smart Utility ServiCEs (Finesce)

Start date: Mar 1, 2013, End date: Sep 30, 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Read Project

 34

 FINISHED 

VISION ADVANCED INFRASTRUCTURE FOR RESEARCH (VISIONAIR)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

VISIONAIR is a project of creation of a European infrastructure that should be a unique, visible and attractive entry towards high level visualisation facilities. These facilities must be open to the access of a wide set of research communities. By integrating existing facilities, it will create a world-class research infrastructure enabling to conduct frontier research. This integration will prov ...
Read Project

 27

 FINISHED 

European Coordination for Accelerator Research and Development (EuCARD)

Start date: Apr 1, 2009, End date: Jul 31, 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Read Project

 39

 FINISHED 

Future INternet for Smart ENergY (FINSENY)

Start date: Apr 1, 2011, End date: Apr 30, 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Read Project

 41

 FINISHED 
... in the area of Machine Learning through networking and technology transfer PASCAL2 builds on the PASCAL Network of Excellence that has created a distributed institute pioneering principled methods of pattern analysis, statistical modelling, and computational learning. While retaining some of the structuring elements and mechanisms of its predecessor, PASC ...
Read Project

 29

 FINISHED 
The focus of the project MULTIFORM is on the integration and the interoperation of tools and methods based on different modelling formalisms in order to make a significant step towards integrated coherent tool support for the design of large complex controlled systems from the first concept to the implementation and further on over their entire life cycle.By addressing the issue of multi-level mul ...
Read Project

 10

 FINISHED 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Start date: Jan 1, 2008, End date: Mar 31, 2012,

The ArtistDesign NoE is the visible result of the ongoing integration of a community, that emerged through the Artist FP5 Accompanying Measure and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved throu ...
Read Project

 38

 FINISHED 

Materials for Robust Gallium Nitride (MORGaN)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Read Project

 24

 FINISHED 
Designing ICT for managing the smart grids with integrated microgrids is a challenge that cannot be won by a single utility, industry or country. It requires collaboration of all Stakeholders, in an interdisciplinary approach that brings together experiences from the different countries with their different situations and from different viewpoints, in order to contribute to a scalable system that ...
Read Project

 24

 FINISHED 
With large shares of Distributed Energy Resources (DER) and Renewable Energy Sources (RES) that can be expected in the 2010 time frame as a consequence of reaching EU policy targets, at least in certain parts of Electric Power Systems of the EU and its Member States challenges with regard to controllability and optimal integration will have to be met. The INTEGRAL project aims to build and demonst ...
Read Project

 9

 FINISHED 

Generic Embedded System Platform (GENESYS)

Start date: Jan 1, 2008, End date: Jun 30, 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Read Project

 25

 FINISHED 
COMBEST will provide a formal framework for component based design of complex embedded systems. This framework will:1.\tEnable formal integration of heterogeneous components, such as with different models of communication or execution;2.\tProvide complete encapsulation of components both for functional and extra-functional properties and develop foundations and methods ensuring composability of co ...
Read Project

 15

 FINISHED 
In this age of rapid pace of innovations and technological changes, the success oforganisations depends to a large extent on the continued learning and improvement ofits processes. Structured methods for innovation are needed. In 2003 - 2006 theinnovation manager profession has been developed by a Leonardo project (productinnovation, process innovation, market innovation) with guidance, courses, a ...
Read Project

 21

 FINISHED 
This TN project brings together within a single network all actors in HE in chemistry and chemical engineering in Europe. There are schools, universities, industries, national chemical societies, and accreditation bodies. The project brings all these actors together to collaborate in the development of a knowledge based economy, specifically in chemistry and chemical engineering. The project:- wil ...
Read Project

 118

 FINISHED 
Designing modern products and systems in an innovative, sustainable and competitive way demands the implementation of new paradigms in development organisations. Design is no longer concentrated on a specific phase. It goes beyond aesthetics to cover all functional aspects of a product or a system, thus driving the entire development process. Consequently, more and more actors of the complet ...
Read Project

 5

 FINISHED 
The Partnership is composed of 10 European Universities representing 9 European states and 10 Asian Universities settled in 9 Asian countries: all partners have been carefully selected in order to ensure both a fair geographical balance and academic excellence proved by the position covered in national and international ranking by the represented Universities. The main objective of AREAS (Academi ...
Read Project

 20

 FINISHED 
For getting competitive businesses need to focus on customer satisfaction by supplying outstanding quality products / services, cost efficiently and within time. This can be achieved by applying Lean and Six Sigma, a practical and structured method to eliminate waste and variability.Project objectives :1 - Bridge gap between Initial VET and SME 2 - Bridge gap Initial VET and Higher Education3 - Un ...
Read Project

 6

 FINISHED 
This project answers to the need of development of a complete master degree program at the point of intersection between informationtechnology and communications. The innovative performance-centred approach has been developed, tested and implemented and ourpartnership experience returned strong positive results - it has been proven to be more effective than the traditional lecture-practice-test(ex ...
Read Project

 7

 FINISHED 
The motivation for this project proposal lies in the lack of a European-wide valid set of training modules and certification of entrepreneurial skills of young academic people. Europe is far from exploiting its potential of successful entrepreneurship in higher education, because it often fails to mobilize the right innovative resources and young brains. The proposed project aims at delivering to ...
Read Project

 6

 FINISHED 

India for EU II

Start date: Jul 15, 2012,

Read Project

 20