Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...ss-by noise engineering, tackling as well the pass-by noise aspects of the ‘source’, the ‘transfer path’ and the ‘receiver’.PBNv2 is formed by 10 beneficiaries combining leading education institutes, top research institutions and leading companies as well as 7 partner organisations established in European automotive R&D, to assist in the dissemination and public engagement or PBNv2 results, and in ...
Read Project

 10

 FINISHED 

Robots Understanding Their Actions by Imagining Their Effects (IMAGINE)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

"Today's robots are good at executing programmed motions, but they do not understand their actions in the sense that they could automatically generalize them to novel situations or recover from failures. IMAGINE seeks to enable robots to understand the structure of their environment and how it is affected by its actions. "Understanding" here means the ability of the robot (a) to determine the ap ...
Read Project

 8

 FINISHED 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Read Project

 11

 FINISHED 
For decades, most of the aviation research activities have been focused on the reduction of noise and NOx and CO2 emissions. However, emissions from aircraft gas turbine engines of non-volatile PM, consisting primarily of soot particles, are of international concern today. Despite the lack of knowledge toward soot formation processes and characterization in terms of mass and size, engine manufactu ...
Read Project

 18

 FINISHED 
...) through cross-border and cross-sector mobility for future growth in Europe. XP-RESILIENCE is an inter/multi-disciplinary and intersectoral programme as it includes seven academic partners, one Institute of Applied Science and seven private companies from ten different European countries.
Read Project

 10

 FINISHED 
Metagenomes comprise enormous reservoirs coding for proteins with useful activities. Unfortunately, harvesting this reservoir is difficult, because useful candidates are rare and hidden in an overwhelming majority of irrelevant genes. Screening campaigns of metagenomic libraries thus require massive capital-expenditure for robotic systems and much manpower, making them expensive, slow and availab ...
Read Project

 14

 FINISHED 
The business model currently under development for second generation ethanol is a replication of the model used for first generation which is plants with massive annual production capacities. Such high production rates require high capital investment and huge amounts of biomasses (250-350,000 tons per year) concentrated in small radius catchment areas to afford transportation costs (50 km). Under ...
Read Project

 17

 FINISHED 

Carbon-based nano-materials for theranostic application (CARTHER)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

Our proposal aims to carry out a systematic interdisciplinary study of carbon-based nanomaterials, such as: carbon fluoroxide nanoparticles, carbon nanotubes, graphene and nanodiamonds for advanced theranostic application. Their uptake efficiency and specific localization in biological cells depending on intentionally designed surface chemistry will be studied in details. Extremely rich physico-ch ...
Read Project

 7

 FINISHED 
ICT is embedded and pervasive into our daily lives. The notion of Cyber Physical Systems (CPS) has emerged: embedded computational collaborating devices, capable of controlling physical elements and responding to humans.The Cross-layer modEl-based fRamework for multi-oBjective dEsign of Reconfigurable systems in unceRtain hybRid envirOnments (CERBERO) project aims at developing a design environmen ...
Read Project

 12

 FINISHED 
Depletion of natural resources combined with the extending footprint of mankind has led to a shift in importance of research and development topics. In the 1970s and 1980s process yield was primarily targeted, but emphasis is now focussed on resource efficiency as a primary objective. Routes for resource efficiency have to be identified and implemented to provide a more environmental and resource- ...
Read Project

 11

 FINISHED 
The origins of pollutants inside the aircraft cabin are various. Ozone comes from outside, particularly when the aircraft is flying at high altitudes near the stratospheric ozone layer. In addition to the materials emissions, carbonyl species can be also produced in the cabin by reaction of ozone with unsaturated VOCs.Ozone and VOCs can cause acute respiratory problems, aggravate asthma and increa ...
Read Project

 5

 FINISHED 

Smart Implants from Safe CERAmics (SISCERA)

Start date: Jan 1, 2017, End date: Mar 31, 2019,

Great advances were made by SISCERA partners in the development of the world’s first ceramics showing transformation induced plasticity and perfect predictability. These specifically designed materials were the main research results of the LongLife FP7 project and will be brought to market via SISCERA. The LONGLIFE material is based on a novel, highly biocompatible ceramic coupled with a specific ...
Read Project

 5

 FINISHED 
In the wind power generation, aerospace and other industry sectors there is an emerging need to operate in the low temperature and highly erosive environments of extreme weather conditions. Such conditions mean current materials either have a very short operational lifetime or demand such significant maintenance as to render many applications either very expensive to operate or in some cases non-v ...
Read Project

 18

 FINISHED 

MicroElectronics Cloud Alliance

Start date: Jan 1, 2016, End date: Dec 31, 2018,

mCloud Alliance brings together 18 higher education institutions (HEIs) and small and medium enterprises (SMEs) to develop Cloud-based European infrastructure and organisation for education in microelectronics providing a range of open educational resources (OERs), remote access and sharing of educational and professional software, remote and practice-based learning facilities. Neither university ...
Read Project

 18

 FINISHED 
Mammals rely entirely on their symbiotic microorganisms to digest complex glycans, issued from dietary fibers, yeasts, and the host itself. To that purpose, gut bacteria have evolved sophisticated machineries to face the structural diversity and complexity of carbohydrates, consisting of gene clusters coding for carbohydrate-hydrolysing, -binding and -transporting proteins. Since the last decade, ...
Read Project

 2

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: May 31, 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The purpose of the 2G BIOPIC project is to demonstrate the performance, the reliability and the sustainability, of the whole value chain of production of bioethanol from agricultural residues and wood. 2G BIOPIC aims to design, construct and optimize a second generation (2G) demonstration plant with a capacity of 1 T of biomass/h. This 2G plant is based on the scale-up and optimization of bioethan ...
Read Project

 7

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9

 FINISHED 

PhD on Innovation Pathways for TES (INPATH-TES)

Start date: May 1, 2015, End date: Apr 30, 2018,

...is to develop a joint PhD programme between universities and research centres, on the topic of Thermal Energy Storage (TES). The goal of INPATH-TES is to create a network of universities and research institutes to implement a joint PhD programme on TES technologies. The final result of such a network is to educate professionals on these technologies for the European research and industry instituti ...
Read Project

 22

 FINISHED 
Abnormal heart rhythms are a major cause of cardiovascular disease and death in Europe. Sudden cardiac death accounts for 50% of cardiac mortality in developed countries; ventricular tachycardia or ventricular fibrillation is the commonest underlying arrhythmia. In the ambulatory population, atrial fibrillation is the commonest one, and is associated with increased risk of stroke and heart failur ...
Read Project

 7

 FINISHED 
The principal aim of this project is to develop and apply revolutionary graphics rendering and artificial intelligence (AI) methods to an existing social media search engine platform (known as Tapastreet) thereby creating ground breaking mobile search capabilities with significant online commercial potential.Specifically these goals will be achieved by meeting the following Scientific & Technologi ...
Read Project

 3

 FINISHED 

European Robotics Challenges (EuRoC)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

Description The EuRoC project proposes to launch three industry-relevant challenges aimed at sharpening the focus of European manufacturing through a number of application experiments, while adopting an innovative approach which ensures benchmarking and performance evaluation. Within an open call framework, three stages of increasing complex ...
Read Project

 16

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Prediction of Erosion Damages in Hydraulic MAchines (PREDHYMA)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"Hydraulic turbines can undergo severe damaging during operation, because of low quality water or detrimental flow conditions. Damaging induces maintenance costs and power production losses, and can also endanger safety of installations. Hydropower plants operators and turbine manufacturers are interested in extending overhaul periods by reducing damaging intensity and protecting turbine component ...
Read Project

 2

 FINISHED 

PhDs Enhanced for Prospects- ErasmUs Plus

Start date: Sep 1, 2014, End date: Aug 31, 2017,

The PEP-UP project will identify the feasible features of PhD education programs that need to be emphasized to make engineering PhD graduates more prepared for employment in industry and more able to use their talents and training for the benefit of the economy, regions and society. Eight leading technical universities in Europe, with the contribution of two European companies and regio ...
Read Project

 10

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: May 31, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

COatings for BipolaR plAtes (COBRA)

Start date: Apr 1, 2014, End date: Mar 31, 2017,

...areas: chemistry, physics, material science, fuel cell engineering. Thus the COBRA consortium combines the collective expertise of bipolar plate and coating suppliers, system integrators and research institutes and thus removes critical disconnects between stakeholders.The scientific objectives of this project are elaboration and characterization of low-cost new functional coated bipolar plates hi ...
Read Project

 6

 FINISHED 
"OILTEBIA (Optical Imaging and Laser TEchniques for BIomedical Applications) is an Initial Training Network (ITN) that seeks to train researchers in a multidisciplinary environment where pulsed laser technology, sensor and signal processing techniques meet in the biomedicalenvironment to achieve novel optical imaging technologies from bench to bedside, spanning from basic research and drug discove ...
Read Project

 10

 FINISHED 

Intelligent Catheters in Advanced Systems for Interventions (INCITE)

Start date: Mar 1, 2014, End date: Mar 1, 2017,

INCITE aims to develop intelligent catheter technologies and systems that will accelerate the paradigm shift from costly, burdensome surgical treatments to cost-effective and patient-friendly minimally invasive interventions. It will also enable the creation of new advanced treatments for currently complex surgical procedures. This will allow for more individuals to be treated thereby contributing ...
Read Project

 24

 FINISHED 

Advanced materials for batteries (MAT4BAT)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

"Li-ion technologies initiated in the 90’ at a fast development pace thanks mainly to emerging ICTs with more than 20 GWh sold in 2010. Soon, it appeared as a credible technology for electrical vehicles as it could provide average energy densities of about 140 Wh/kg. However and since then,major breakthroughs have been expected to reach higher storage levels of 250 Wh/kg on battery system level wi ...
Read Project

 18

 FINISHED 
The SITOGA project will address for the first time the integration of transition metal oxides (TMO) materials in silicon photonics and CMOS electronics. TMOs have unique electro-optical properties that will offer unprecedented and novel capabilities to the silicon platform. SITOGA will focus on two disruptive TMO materials, barium titanate (BaTiO3) and vanadium oxide (VO2), for developing advanced ...
Read Project

 8