Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall project idea is on contribution to European culture and creativity through developing technological readiness of the breakthrough engineering solution for indoor air safeguard via inter-sectoral European and international cooperation, knowledge sharing, broad skills development and mobility of researchers and innovation staff. Under NANOGUARD2AR it is expected to build new and enhance ...
Read Project

 13

 FINISHED 
The PoLaRBEAR (Production and Analysis Evolution For Lattice Related Barrel Elements Under Operations With Advanced Robustness) project focuses on reliable novel composite aircraft structures based on geodesic technology aiming at a significant higher Robustness and Technology Readiness Level (TRL).While the global structural behavior of composite geodesic structures is investigated and understood ...
Read Project

 13

 FINISHED 

European 450mm Equipment Demo Line (E450EDL)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

...studies and will be enabled by the controlled exchange of 450mm wafers between different sites. The consortium comprises 43 members (from 11 different European countries) with many SMEs and research institutes. The project is organized in five technical work packages and a work package on management and coordination. In the work package on integration and wafer processing first critical modules ...
Read Project

 44

 FINISHED 
This project is focused to advance considerably the efficiency of power generation in gas turbine processes by the development of improved thermal barrier coated parts or components of significantly improved performance as well as software products providing optimized process parameters.The proposed project addresses the following scientific and technological issues:New TBC formulations with long- ...
Read Project

 14

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 

Atomic Scale and single Molecule Logic gate Technologies (AtMol)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

AtMol will establish comprehensive process flow for fabricating a molecular chip, i.e. a molecular processing unit comprising a single molecule connected to external mesoscopic electrodes with atomic scale precision and preserving the integrity of the gates down to the atomic level after the encapsulation. Logic functions will be incorporated in a single molecule gate, or performed by a single sur ...
Read Project

 11

 FINISHED 
"Aeronautics is a key asset for the future of Europe, but nowadays the industry has to face the challenge of “More Affordable, Safer, Cleaner and Quieter” while at the same time accounting for a demand that will triple over the next 20 years. WASIS project aims to rise to this challenge with the development of a composite fuselage structure based on the lattice stiffening concept, optimizing geome ...
Read Project

 14

 FINISHED 
Emissions from fossil fuels are the largest contributor to the anthropogenic greenhouse effect, so a reduction in fossil-energy use is a clear priority for the environment. Yet, because some emissions will be unavoidable, a responsible strategy also means actively withdrawing carbon dioxide from the atmosphere. Such carbon sequestration faces multi-faceted challenges: the net withdrawal of carbon ...
Read Project

 8

 FINISHED 
The building and construction community in Europe includes about 150000 plumbing, heating, ventilation, air conditioning contractor SMEs with 1.2 million employees generating a total turnover of €130Bn. Our community faces the challenges of meeting the growing demand for plastic pipes and the EU Landfill Directive and the revised EU Waste Framework Directive. The polluter-pays principle says that ...
Read Project

 16

 FINISHED 
By 2020, the EC aim to increase our overall renewable energy capacity from 8.5% to 20% as a proportion of Europe’s total energy demand. Considering that domestic heating and hot water provision accounts for nearly 40% of total energy demand it is clearly desirable to increase market penetration of renewable heating systems. On a domestic scale solar thermal systems are increasingly common and are, ...
Read Project

 11

 FINISHED 
...as Safetypedia, Atlas of Emerging Risks, Reference Library... The project has a solid industry leadership and involves the leading EU R&D institutions. It is coordinated by the European Virtual Institute for Integrated Risk Management, the EEIG guaranteeing the sustainability of the results after the project.
Read Project

 67

 FINISHED 
... SMEs, research centres and universities in MS&E. The aim of the trainings was in fact of providing knowledge, tools and methodologies for helping the research developed in industries and in research institutes to reach the industries and the market. This is a strongdriver for innovation and a major strategy, encouraged by the European Union,in order to rech the goal of being a "knowledge intensiv ...
Read Project

 11

 FINISHED 

Materials for Robust Gallium Nitride (MORGaN)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Read Project

 24

 FINISHED 
This project will target the fast growing market for solar collector systems. The competitiveness of the EU solar collector industry is a major issue in this rapidly increasing market. Currently, European industry is lagging behind the China and US, which exports solar collector components to the EU. Also competition will become increasingly intense, as new players from other low labour cost count ...
Read Project

 10