Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 

European Space Robot Control Operating System (ESROCOS)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

The ESROCOS activity is devoted to the design of a Robot Control Operating Software (RCOS) that can provide adequate features and performance with space-grade Reliability, Availability, Maintainability and Safety (RAMS) properties. The goal of the ESROCOS proposal is to provide an open source framework which can assist in the generation of flight software for space robots. By providing an open sta ...
Read Project

 10

 FINISHED 
Wireless Chip-to-Chip (C2C) communication and wireless links between printed circuit boards operating as Multiple Input Multiple Output devices need to become dominant features of future generations of integrated circuits and chip architectures. They will be able to overcome the information bottleneck due to wired connections and will lead the semiconductor industry into a new More-Than-Moore era. ...
Read Project

 6

 FINISHED 
With the ULTIMATE project five experienced research groups and four major European engine manufacturers will develop innovative propulsion systems to fulfill the SRIA 2050 key challenges. One of the most challenging targets is the 75% reduction in energy consumption and CO2-emissions. Technologies currently at TRL 3-5, cannot achieve this aim. It is estimated that around a 30% reduction must come ...
Read Project

 11

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Read Project

 37

 FINISHED 

Engine Breakthrough Components and Subsystems (E-BREAK)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Read Project

 48

 FINISHED 
Air transportation is a crucial contributor to the world economy, and thus its continued growth is essential. However, environmental impact and the increase in fuel prices make sustainable aviation a challenge. To address this challenge, we propose to develop state-of-the-art computational tools for the design optimization of next-generation airliners with unprecedented fuel efficiency. We will ac ...
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
It is proposed in this research programme to optimize the pylon shape of a Counter Rotating Open Rotor (CROR) propeller and its embedded flow control system, in order to reduce the noise emission through pylon wake attenuation, by means of advanced experimental methodology, such as 3CHD-PIV, adapted to in-flight tests.It is proposed to decompose the project into subtasks of increasing complexity. ...
Read Project

 2

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Designing Dynamic Distributed Cooperative Human-Machine Systems (D3CoS)

Start date: Mar 1, 2011, End date: Feb 28, 2014,

Transportation based on cars, aircraft and ships is a key factor for modern human societies. Human operators have historically been in charge of the two main facets of transportation: vehicle control and traffic control. Technological innovations have progressively allowed the introduction of advanced automated assistance systems leading to a complex interplay of humans and automation which has be ...
Read Project

 24

 FINISHED 

valiDation of Radical Engine Architecture systeMs (DREAM)

Start date: Feb 1, 2008, End date: Jan 31, 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Read Project

 46

 FINISHED 
NEWCOM++ is the acronym of a proposed Network of Excellence in Wireless COMmunications, submitted to Call 1 of the VII Framework Programme under the Objective ICT-2007.1.1: The Network of the Future, mainly in its target direction "Ubiquitous network infrastructure and architectures". The current proposal draws inspiration, shape/form, and substantive direction from its successful predecessor, t ...
Read Project

 35