Search for European Projects

29 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

...ng and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, led by Wageningen UR and other core partners of previous key projects such as FIWARE and IoT-A, will leverage the ecosystem and architecture that was es ...
Read Project

 72

 FINISHED 

Next gEneration netwoRked mEdia over 4G+ infrastrUctureS

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Recent advances in ICTs have seen the typical boundaries between media and networking technologies to fade, giving rise to a new scientific and technological era, the so-called 4G+, which can foster innovation and gear-up sustainable growth both at regional and national/global levels. Progresses in cloud computing, wireless/mobile communications, social networks, Internet of Things (IoT) and 3D/HD ...
Read Project

 5

 FINISHED 

European Joint Doctorate in Functional Materials Research (EJD-FunMat)

Start date: Jun 1, 2015, End date: May 31, 2019,

EJD-FunMat is a European Joint Doctoral programme in the field of functional materials research. EJD-FunMat is embedded in an existing research network, with previous experience in co-tutelle doctorates, but the project will add new major elements, with the strategic aim of becoming a permanent reference European Joint Doctoral School in Materials Science and beyond.The key innovative aspects of t ...
Read Project

 9

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Read Project

 126

 FINISHED 

THINGS2DO (THINGS2D0)

Start date: Jan 1, 2014, End date: Jan 1, 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Read Project

 44

 FINISHED 
... micro enterprises). Though innovation is the main leverage to improve competitiveness, there is neither high enough innovation and entrepreneurship spirit nor innovation transfer from High Education Institutes (HEI) to business. The partners of this consortium, involved for years in initiatives aiming at fostering innovation and interactions between students and industry on the basis of project-b ...
Read Project

 15

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The Mont-Blanc project aims to develop a European Exascale approach leveraging on commodity power-efficient embedded technologies. The project has developed a HPC system software stack on ARM, and will deploy the first integrated ARM-based HPC prototype by 2014, and is also working on a set of 11 scientific applications to be ported and tuned to the prototype system.The rapid progress of Mont-Blan ...
Read Project

 17

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

...imulation, High Performance Computing, Medical Informatics, Neuromorphic Computing and Neurorobotics, and create a user community of research groups from within and outside the HBP, set up a European Institute for Theoretical Neuroscience, complete a set of pilot projects providing a first demonstration of the scientific value of the platforms and the Institute, develop the scientific and technolo ...
Read Project

 116

 FINISHED 
...opean competition. A powerful and success-proven consortium has been set-up to achieve these goals. It consists of 5 industrial partners (including 3 SMEs) and 9 well distinguished academic research institutes spread all over Europe.
Read Project

 17

 FINISHED 

Graphene-based Devices and Circuits for RF Applications (GRADE)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

...rong experimental background and excellent processing facilities and one is focused on physics-based modelling and simulation and one specialized in compact modelling and circuit design; one research institute, which provides a professionally run pilot production clean room, state of the art processing and an entry point for graphene into manufacturing; and one global semiconductor manufacturer wi ...
Read Project

 13

 FINISHED 
Description Dem@Care aspires to contribute to the timely diagnosis, assessment, maintenance and promotion of self-independence of people with dementia, by deepening the understanding of how the disease affects their everyday life and behaviourIt implements a multi-parametric closed-loop remote management solution that affords adaptive feedba ...
Read Project

 13

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2014, End date: Sep 30, 2015,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
The possibility to control actions from thoughts is becoming reality thanks to Brain Machine Interfaces (BMIs). However modern BMIs are mostly unidirectional and aimed at restoring lost motor functions. In a wider perspective, neural interfaces must be bi-directional devices that substitute motor, sensory or cognitive circuits within the brain, that might have been damaged as a result of an injury ...
Read Project

 7

 FINISHED 

Pro-active decision support for data-intensive environments (ASTUTE)

Start date: Mar 1, 2011, End date: May 31, 2014,

"ASTUTE aims at defining reference architecture for the development of HMIs, targeting proactive information retrieval and delivery based on situational context, as well influenced by information content and services, and user state information. This architecture will support the user intentions, optimizing the choices available to the user, while keeping the user in control of the situation. Veri ...
Read Project

 22

 FINISHED 
... the competitiveness and the advancement of the socio-economic conditions of the European Union. The skills acquired during my studies will be complemented by the extensive experience of the host institute on OE to assure a successful accomplishment of this fully interdisciplinary project."
Read Project

 1

 FINISHED 
The ALICANTE project proposes a novel concept towards the deployment of a networked 'Media Ecosystem'. The proposed solution is based on a flexible cooperation between providers, operators, and end-users, finally enabling every user to access the offered multimedia services in various contexts, and to share and deliver his own audiovisual content dynamically, seamlessly, and transparently. Towards ...
Read Project

 21

 FINISHED 
FACETS-ITN is a research and training network involving partners from 11 universities and research centres, 3 industrial companies and 1 semi-industrial research centre from 6 European countries. It combines competencies in neurobiology, computational neuroscience, information science, physics and electrical engineering. The scientific goal is to experimentally and theoretically explore the struct ...
Read Project

 15

 FINISHED 
In the NoE FlexNet, 17 participants from eleven European countries work together in order to support Europe in becoming a world leader in Flexible, Organic and Large Area Electronics (FOLAE). FlexNet aims at interlinking Europe's FOLAE-expertise in the domains of science, technology development, components, devices and systems integration technologies. A special emphasis will be set on the subsequ ...
Read Project

 19

 FINISHED 
Future networked media applications will be multi-sourced, highly interactive distributed meshes of HD and 3D multi-sensory channels. While high-quality user-centric applications such as these offer tremendous advantages to their participants and to society at large, they present a major headache to ISPs as they demand unprecedented quantities of network resources in unpredictable locations. The t ...
Read Project

 7

 FINISHED 

Engine LUBrication SYStem technologies (ELUBSYS)

Start date: Jun 1, 2009, End date: Nov 30, 2012,

"In aeronautics, gas turbine engines are equipped with lubrication systems whose function is to cool and lubricate the highly loaded rolling bearings and gearboxes. Current lubrication systems are based on architectures and technologies that have not much evolved for the last 30 years and that, despite advances made on components, have reached their technological limit. Future aero-engine requirem ...
Read Project

 20

 FINISHED 

ENERMAT.aa

Start date: Jan 10, 2010, End date: Oct 30, 2012,

In order to strengthen synergies between the Regions of the Atlantic Area and develop new opportunities of economic growth, a sustainable transnational network of cooperation between public research structures and small and medium industries of the Atlantic Area in the material-energy field will be implemented, which will be called "ENERMAT". The network will be led by 3 specific objectives: - P ...
Read Project

 7

 FINISHED 
The breakthrough objective of NANOTHER is to develop & characterise a novel nanoparticle system that will be used as a therapeutic agent or diagnosis tool for breast cancer, colorectal cancer & bone metastasis. Theranostics, the development of nanoparticles with both functionalities, will also be carried out using the hyperthermic effect to kill tumour cells or to release the selected drug . The n ...
Read Project

 19

 FINISHED 
Este proyecto de Investigación y Desarrollo tiene por objetivo desarrollar un prototipo que permita la evaluación de los riesgos de degradación de la calidad de las aguas en períodos de crecidas en las cuencas agrícolas del SUDOE, con el objetivo de conseguir: - La protección de la calidad de los ecosistemas acuáticos. - La protección de las captaciones de agua potable en zonas agrícolas. Este pro ...
Read Project

 6

 FINISHED 
...tors, simulation, modeling, and characterization (down to few k) of devices; as well as the design and characterization of demonstrator electronic blocks (Low Noise Amplifier, mixers...).Two research institutes in charge of developing novel process modules and transistor structures on silicon wafers, capable of fabricating innovative SiGe HBT concepts.Two industrial companies, capable of producing ...
Read Project

 20

 FINISHED 

U.TdR - UNION des TERRES de RIVIERES (U.TdR)

Start date: Nov 30, 2004, End date: Feb 27, 2007,

Sustainable management of water and rivers requires cooperation that transcends administrative, cultural and geographical divisions. A network of partners in different European countries has been established, starting with an association of local groups in the Aquitaine region of France, with the aim of developing cooperation. Through this project, the aim is now to achieve trans-national cooperat ...
Read Project

 23

 FINISHED 

L02- Egypt

Start date: Jul 15, 2009,

The FFEEBB project has a long term socio-economical dimension: besides ensuring equal opportunity to all the candidates (gender issue, students from vulnerable groups) it will assist Egyptian Universities to create course on entrepreneurship, to create professionalized curricula and to develop work placements. One of the projects objective's is to develop the Egyptian students employability in the ...
Read Project

 24