Search for European Projects

19 European Projects Found

Searched on 125080 European Projects

 FINISHED 

READY

Start date: Dec 1, 2014, End date: Nov 30, 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Read Project

 23

 FINISHED 
"Through combining basic pre-clinical and clinical research, network analysis and computational modelling, RESOLVE aims at resolving the disturbed dynamics and mechanisms underlying the high triglyceride (HTG) and low high-density lipoprotein cholesterol (HDL-C) phenotype and insulin resistance in patients with metabolic syndrome (MetS) and its associated co-morbidities (cardiovascular disease, CV ...
Read Project

 14

 FINISHED 

Systems medicine of chronic inflammatory bowel disease (SYSMEDIBD)

Start date: Dec 1, 2012, End date: Nov 30, 2017,

Inflammatory bowel disease (IBD) is a major health problem with severe co-morbidities, requiring life-long treatment. Oscillating processes, like biological clocks are well studied and modeled in a number of systems. Circadian rhythms are extremely important for optimal treatments of patients. Recently, the NfkB pathway has been shown to be oscillating. In this project, we will model NfkB oscillat ...
Read Project

 13

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 

Methods for Integrated analysis of Multiple Omics datasets (MIMOmics)

Start date: Oct 1, 2012, End date: Sep 30, 2017,

MIMOmics develops statistical methods for the integrated analysis of metabolomics, proteomics, glycomics and genomic datasets in large studies. Our project is based on our involvement in studies participating in EU funded projects, i.e. GEHA, IDEAL, Mark-Age, ENGAGE and EuroSpan. In these consortia the primary goal is to identify molecular profiles that monitor and explain complex traits with nove ...
Read Project

 15

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 
The growing number of fine-granular data streams opens up new opportunities for improved risk analysis, situation and evolution monitoring as well as event detection. However, there are still some major roadblocks for leveraging the full potential of data stream processing, as it would, for example, be needed the highly relevant systemic risk analysis in the financial domain.The QualiMaster projec ...
Read Project

 5

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

OPtimising Hybrid Energy grids for smart citieS (OrPHEuS)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The global demand for energy will challenge energy supply directly impacting the productivity for future growth and prosperity of cities. Stability and efficiency across multi domain energy grids are crucial. Coupling technologies like Combined Heat and Power (CHP) allow theses multi-utility grids to be considered and operated as Hybrid Energy Network increasing even more efficiency levels and red ...
Read Project

 9

 FINISHED 
To speed up the availability of cTnI test results (for heart attack indications), a highly integrated, biophotonics based, handheld-device is currently developped by a number of European based companies (Philips, Conworx Technology, Micro Systems Limited and Scienion AG) : Minicare. This device can be used at the patients' bed side by nurses and physicians as well as in ambulances and provides re ...
Read Project

 10

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 

Hard Material Small-Batch Industrial Machining Robot (Hephestos)

Start date: Sep 1, 2012, End date: Oct 31, 2015,

Description Hard materials machining has recently attracted great attentions from the European automotive, the aerospace and the biomedical industries. However, the existing technology failed to cope efficiently with small-batch production of large and complex-shaped products. The project Hephestos shall give rise to a cost-efficient solutio ...
Read Project

 10

 FINISHED 
Recent years have seen a rapidly growing demand from aeronautic industry regarding function-oriented, highly integrated, energy-efficient and lightweight structures. In advanced composites a promising material was found, which integrates these characteristics allowing for continuously elevating the complexity of new components concerning shape and internal structure. The consequences of this incre ...
Read Project

 12

 FINISHED 
Background Brown moss fens were once common in Brandenburg, however, near-natural base-rich or calcareous percolation mires and spring mires have now virtually vanished because of drainage. Only three near-natural base-rich fens of lacustrine origin (terrestrialisation mires) still exist. Furthermore, there are many moderately degraded fens that are in ne ...
Read Project

 6

 FINISHED 
"Clinical trialists often struggle when trying to choose the outcomes to measure which would be of most use to the patients, practitioners and policy makers who will use their research to help them make decisions. These difficulties are passed on to those producing and reading systematic reviews, many of whom have experienced the frustration of finding that the original researchers either did not ...
Read Project

 11

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

Extended Non-Destructive Testing of Composite Bonds (ENCOMB)

Start date: Nov 1, 2010, End date: Apr 30, 2014,

"Even though composite materials are already used in the manufacturing of structural components in aeronautics industry a consequent light-weight design of CFRP primary structures is limited due to a lack of adequate joining technologies. In general, adhesive bonding is the optimum technique for joining CFRP light-weight structures, but difficulties in assessing the bond quality by non-destructive ...
Read Project

 15

 FINISHED 
The objective of this design study is to address all key issues related to the feasibility of a new research infrastructure with a clear European dimension, named LIVING LAB, that will: • Advance the field of user centred research (i.e. by studying the interaction of people with innovations for the home), • Test, evaluate and improve innovations for the home, • Foster societal needs such as sustai ...
Read Project

 7