Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Background Austria and Hungary have undertaken efforts to protect and enlarge the habitat of great bustards, a bird species listed in Annex I of the Birds Directive. They have focused on active habitat management and on the maintenance of large areas dedicated to non-intensive farming. But the problem of overhead power lines remains great, causing fatal c ...
Read Project

 10

 FINISHED 
...n the 1980s, the Hungarian population of the eastern imperial eagle has come back from the brink of extinction, reaching 160 pairs by 2014. The Pannonian biogeographical region (which includes all of Hungary and parts of Slovakia, Romania, Czech Republic, Croatia, Serbia and Ukraine) now holds some 220 pairs of this priority raptor species (Annex 1 of the EU Birds Directive). However, this small p ...
Read Project

 12

 FINISHED 
...ve habitat conditions for European roller in order to ensure its recovery. The project’s specific objectives are to: Create nesting opportunities for European roller in 17 Natura 2000 sites in Hungary, holding altogether 589-717 breeding pairs, and in 15 Natura 2000 sites in western Romania, holding 97-137 breeding pairs; Improve nesting and feeding habitats on three characteristic roller hab ...
Read Project

 6

 FINISHED 

Microbial Desalination for Low Energy Drinking Water (MIDES)

Start date: Apr 1, 2016, End date: Mar 31, 2020,

Shortage of fresh water has become one of the major challenges for societies all over the world. Water desalination offers an opportunity to significantly increase the freshwater supply for drinking, industrial use and irrigation. All current desalination technologies require significant electrical or thermal energy, with today's Reverse Osmosis (RO) desalination units consuming electric energy of ...
Read Project

 12

 FINISHED 
The “Advanced Distributed Pilot Line for More-than-Moore Technologies” project (ADMONT) is focused on a powerful and versatile More-than-Moore (MtM) pilot line for Europe increasing the diversification of CMOS process technologies. The combination of existing expertise, technological capabilities and the manufacturing capacity of industrial and research partners creates a whole new ecosystem withi ...
Read Project

 15

 FINISHED 
...arefully considering the habitat demands of Southern birch mouse (Sicista subtilis trizona) and blind mole rat (Nannospalax (superspecies leucodon)), which are strictly protected species in Hungary. Expected results: A better understanding of the factors involved in the decrease of small mammal populations; The decrease in numbers of the main food sources of Saker falcon and Eastern imperial ea ...
Read Project

 13

 FINISHED 
The aim of the South Hungarian Enhanced Geothermal System (EGS) Demonstration Project is to establish a demonstration EGS power plant that will be unique not only in Hungary but on the European continent as well. Within the project, an EGS reservoir will be developed in the South part of Hungary (Battonya), and a geo-thermal power plant will be established, delivering a gross electric power of 11 ...
Read Project

 1

 FINISHED 

Community as Opportunity - Creative archives' and users' network

Start date: Dec 1, 2014, End date: Nov 30, 2018,

All activities and undertakings within this project are tailored to specifically meet the Programmes’ targets of audience development and professionalization of players in the cultural sector. The core purpose of given project is to facilitate the mutual relationship between archives and archivists and the general public across the population stratum. This connecting and equating of archival insti ...
Read Project

 17

 FINISHED 
... at risk of poverty or social exclusion, while EU youth unemployment was 22.7% (Eurostat 2012); JOB LABYRINTH moves from a deep analysis led at EU and national levels which revealed how Italy, Spain, Hungary and Slovakia scored highest and persistent long-term unemployment, though law average of youth and jobseekers participating in activation measures, suggesting how ALMPs are not effective, and ...
Read Project

 8

 FINISHED 

Training goes Global

Start date: Oct 1, 2016, End date: Sep 30, 2018,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int ...
Read Project

 11

 FINISHED 

Flip IT! – Flipped Classroom in the European Vocational Education

Start date: Sep 1, 2015, End date: Aug 31, 2018,

... project period we intend to add new components to the transferred methodology as well, like an FC curriculum and course for the teachers. As a consequence while we defined Hungary and Spain as target countries, the university partners can become the beneficiaries of the results as well, as they will be able to utilize the outcomes for further development of their present achievements. The main ...
Read Project

 10

 FINISHED 
...h could contribute to the success of the systematic introduction of the model program, which may bring results in the struggle against early school leaving. Profile of partners: Partners Hungary Foundation:http://partnershungary.hu/ SOS Malta : http://www.sosmalta.org/home?l=1 Partners Bulgaria Foundation: http://partnersbg.org/?lang=en Szolnoki Szolgáltatási Szakközép- és Szakiskola: http:// ...
Read Project

 4

 FINISHED 
The global market for 3-D printing in medical application was valued $354.5 million worldwide in 2012 and is expected to grow at a compound annual growth rate (CAGR) of 15.4 percent from 2013 to 2019 to reach $965.5 million by 2019. Considering that Europe dominated the additive manufacturing for medical devices market in 2012, these economic forecasts augur a promising future for those European M ...
Read Project

 5

 FINISHED 
Slovenia, Austria and especially Hungary are lagging behind most developed economies in innovation and economic results. One of the important obstacles is the educational system which has not yet adapted to the needs of the modern society. Creativity, innovation and entrepreneurship (CI&E) are crucial competences that cannot be taught in a simple manner. The project aim is to trigger different way ...
Read Project

 7

 FINISHED 

a LOW environmental impact BRAke SYStem (LOWBRASYS)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Primary particulate matter (PM) consists of chemical components suspended in the atmosphere as aerosols, e.g. as a result of exhaust gaseous and friction processes (e.g. braking). Such particles may potentially contribute to smog events in urban areas and might be responsible of negative effects on the environment (e.g. acid rain acidification, toxic effects on plants and animals) and health (e.g. ...
Read Project

 12

 FINISHED 

ITrampoline FOR ALL

Start date: Oct 1, 2016, End date: Jul 31, 2018,

Cieľom projektu ITrampolineFOR ALL (IT4ALL) je zvýšiť zamestnateľnosť a integráciu mladých ľudí so znevýhodnením (fyzickým, sociálnym) do pracovného trhu v oblasti informačných technológií. V rámci projektu bude vytvorený pilotný model tréningovo-rozvojového centra so zameraním na IT, ktoré bude rešpektovať špecifiká a zhodnocovať potenciál cieľovej skupiny. Myšlienka projektového zámeru vychádz ...
Read Project

 5

 FINISHED 

Auslandspraktikum zur Fokussierung eines Arbeitsplatzes in Europa

Start date: Jul 1, 2016, End date: Jun 30, 2018,

... as promoters in the sending country have partners in the receiving European countries the following businesses:(UK) Vic Young, South Shields College, (CZ) Edscha Automotive, (HU) FAG Ungarn, Mahle Hungary Kft., (SK) RWE IT Slovakia., T-Systems Slovakia, Fpt Slovakia, (RO) Schaeffler Romania S.R.L., (TR) Degerdanismanlik Istanbul.The action will begin the participants (2016) in June.
Read Project

 11

 FINISHED 

Nowoczesne Technologie w Naprawie Sprzętu Elektronicznego

Start date: Sep 1, 2016, End date: Jun 30, 2018,

...s during the project objectives while abroad, whether during practice with a foreign partner, as well as organizing free time participants (possible in particular to learn the language and culture in Hungary). Furthermore, their task will be to present the progress of participants in consultation with foreign partners and coverage effects to supervisor of applicant institution.Graduates of our sch ...
Read Project

 2

 FINISHED 

South Hungarian Enhanced Geothermal System Test programme (SHEGST)

Start date: Dec 31, 2015, End date: Jun 29, 2018,

In the SHEGST, partners will engage in collaborative research to increase the performance of near-commercial scale technologies and reduce the cost of power produced from Enhanced Geothermal Systems (EGS). The research proposed within the SHEGST project is aimed at finding innovative solutions within reservoir creation that reduce well field development cost, resulting in increased technology perf ...
Read Project

 8

 FINISHED 
The aim of the proposed action is to foster the development of the bioenergy sector in the Danube Region, and of the Bioeconomy at large, through the strengthening of local supply chains that will be supported through specific analytics (economics, sustainability and land use models), and targeted capacity building to foster the generation of innovative solutions in a participatory, cross-sector p ...
Read Project

 6

 FINISHED 
This phase 2 proposal targets the pilot application and market introduction of AgriCloud, a cloud-based precision farming (PF) management system for more efficient, sustainable production of crops in Europe. The objectives are: final technical development, product demonstration through field trials with six pilot customers, market launch in five selected EU countries and market replication leading ...
Read Project

 4

 FINISHED 
Background Around 833 000 ha of forests (41% of all forested areas) can be found on Natura 2000 sites in Hungary. This includes 412 000 ha forests under national protection as well. Most of the state-owned forests are managed by state forest companies; only a minor part is in the trusteeship of national park directorates. Because of the unique biogeograph ...
Read Project

 8

 FINISHED 

CONSERVATION OF FALCO VESPERTINUS IN THE CARPATHIAN BASIN (REDFOOT)

Start date: Sep 1, 2012, End date: Mar 31, 2018,

... The red-footed falcon (Falco vespertinus), which is listed in Annex I of the Birds Directive, has a recorded population of 2 372 to 2 861 pairs in the EU. Some 1 000-1 100 pairs are in Hungary (as recorded in 2009) and a further two are in Slovakia (2010). In Slovakia, unsuitable management practices, including the improper application of chemicals on feeding habitats, together wi ...
Read Project

 7

 FINISHED 

LEGumes for the Agriculture of TOmorrow (LEGATO)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

The project has been conceived to promote the culture of grain legumes in Europe by identifying priority issues currently limiting grain legume cultivation and devising solutions in term of novel varietal development, culture practices, and food uses. LEGATO will develop tools and resources to enable state of the art breeding methodology and to exploit fully the breadth of genetic resources avail ...
Read Project

 32

 FINISHED 

Open Source Quality Assurance System for Vocational Education

Start date: Sep 1, 2014, End date: Aug 31, 2017,

... the potential of quality assurance tools and methods for improving the effectiveness of their pedagogical work. In the consortium eight partners will collaborate from five European countries; from Hungary, Italy, Spain, Ireland and from the UK - representing all type of organisations working in the VET sector. The consortium has all the theoretical background (research capacity) and the practical ...
Read Project

 8

 FINISHED 

Auslandspraktikum zur Fokussierung eines Arbeitsplatzes in Europa

Start date: Jun 1, 2015, End date: May 31, 2017,

...s the following businesses: (UK ) Ford Aerospace , Ulster Carpets(UK), (SK) VSDa.s. , RWE IT Slovakia (CZ) Edscha Automotive, RWE IT Czech sro , (RU ) SC Schaeffler Romania SRL ( HU) Delphi Thermal Hungary Kft , Hungary FAG . The action will begin for the participants (2016) in June.
Read Project

 13

 FINISHED 

"CSR" - SOCIETY CHALLANGES IN REGIONS

Start date: Jun 1, 2016, End date: May 31, 2017,

The startegic goals of Defex Hungary Ltd. is to build and develop an International Training Center, where the continouse competency and skill development allows high quality trainign access for our target groups. With the support of our crisis management program, our mentoring program, we would like to widen our portfolio and build international relationships with other trainign intitutions in the ...
Read Project

 1

 FINISHED 

Training goes Global

Start date: Jun 1, 2015, End date: May 31, 2017,

Especially the extension of the European Union requires more mobility and intercultural skills than ever before. Our domestic and foreign business locations as well as the labor market itself need interculturally skilled and internationally deployable employees. At the same time participants should receive attractive development opportunities in the international labor market. Furthermore when int ...
Read Project

 10

 FINISHED 

Judo - Volunteering and Inclusion

Start date: Dec 1, 2016, End date: May 31, 2017,

Judo is not just a sport, but a philosophy, an education system and a way of life. The Malta Judo Academy with her Partner Countries will take it a step forward by developing more awareness on the need for social inclusion of persons with some form of disability and those with fewer opportunities and to promote active citizenship and mutual understandings of different cultures. This Project is ba ...
Read Project

 9

 FINISHED 

TAKE A RISK (RİSK AL)

Start date: May 9, 2016, End date: May 8, 2017,

...ntries will be attended in, contains entrepreneurship, career management, youth unemployment, labor market and non-formal education subjects.2 youth workers from each group of Bosnia and Herzegovina, Hungary, Slovakia, Armenia, Belarus, Bulgaria, Croatia, Czech Republic, Latvia, Lithuania, Spain and Turkey will be attended in this project. In this training, there will be totally 24 participants an ...
Read Project

 12

 FINISHED 

Model European Union Zagreb 2016

Start date: Aug 1, 2016, End date: Mar 31, 2017,

Model European Union Zagreb 2016 (MEUZ 2016) is an international educational conference, designed as a combination of the simulation of the decision-making procedure of the EU institutions (European Parliament, Council of the European Union) and structured dialogues with decision-makers on the current issues in the field of youth and policies affecting young people. MEUZ 2016 will be held from 3r ...
Read Project

 22

 FINISHED 

Colour Our World

Start date: May 1, 2016, End date: Mar 31, 2017,

European societies face increasing challenges due to unstable situation and crisis in the Middle East, where fear and prejudice lead to acts of discrimination and hate speech. One of the ways to help foster intercultural understanding and thus enable building the grounds for more peaceful societies is to offer intercultural educational activities to young people. "Coloured Glasses" is the framewor ...
Read Project

 11

 FINISHED 
The POLYMARK consortium represent the SME communities of Polymer Recyclers. The EU polymer recycling sector forms a vital part of the polymer sector and has an estimated annual turnover of €2,500 million generated by over 1,000 SMEs. However, our members have a major problem. Within the EU legislation exists (EC/282/2008) that states that plastic containers that have been used in a non-food applic ...
Read Project

 11

 FINISHED 

BUILDING BRIDGES FORGING WELLFARE

Start date: May 2, 2016, End date: Mar 1, 2017,

...uth in Valencia (Spain), Norges Unge Muslime (Norway), Giovani Musulmani d'Italia (Italy) and musilm Association of Ireland (Ireland), Muslim Association of Britain (UK) and Organization of Muslim in Hungary (Hungary) have designed a youth exchange, consistent with the priorities of the Erasmus + program for 2016:-reaching out to young people with fewer opportunities including refugees, asylum see ...
Read Project

 6

 FINISHED 

European Archival Records and Knowledge Preservation (E-ARK)

Start date: Feb 1, 2014, End date: Jan 31, 2017,

The goal of the E-ARK Project is to pilot archival services to keep records authentic and usable based on current best-practices. These will address the three main endeavours of an archive – acquiring, preserving and enabling re-use of information. E-ARK will demonstrate the potential benefits for public administrations, public agencies, public services, citizens and business by providing easy and ...
Read Project

 16

 FINISHED 

Developing Youth Programs for Habitat for Humanity

Start date: Sep 19, 2016, End date: Jan 18, 2017,

Habitat for Humanity is an international non-profit charity organization working to provide decent and affordable housing to those in need. Even though Habitat offices co-operate worldwide, it's employees do not have many structured opportunities to meet and interact in a creative way to develop, expand and improve their programmes for young people.Our Erasmus project described above is aimed to h ...
Read Project

 6

 FINISHED 
...d The eastern imperial eagle (Aquila heliaca) is a globally threatened Eurasian bird species, with a world population of only a few thousand breeding pairs. Hungary is home to the largest population in the EU – in 2010, 62% of the species were found in the country including 117 nesting pairs. Since the 1980’s, the population is slowly increasing in Hu ...
Read Project

 9

 FINISHED 

FORMER WEST, Culminating Phase: Edits, Annotations, Proposals

Start date: Sep 1, 2014, End date: Dec 31, 2016,

This application seeks support for the Culminating Phase (1.9.2014–31.12.2016) of FORMER WEST (FW), a long-term, collaborative, pan-European, transdisciplinary project. Initiated in 2008, and realized through intensive European cooperation—which has assured sustainability of creative practices, knowledges, and network throughout the project’s successive phases—FW aims at developing a critical unde ...
Read Project

 5

 FINISHED 
Establishing services enhancing the innovation management capacity of Hungarian SME's in the Enterprise Europe NetworkThe global objective of the services delivered under this project is to effectively contribute to the innovation driven competitiveness and sustainable growth of the European economy via improving the innovation management processes in SMEs enabling them to get their products, serv ...
Read Project

 9

 FINISHED 
For visually impaired people it is difficult to digitally get graphical contents increasingly conveyed through sight. The sense of touch can potentially bridge the gap, as it is crucial - in absence of vision - for understanding abstract concepts and acquiring information about the surroundings. Examples are learning at school and developing mental maps in orientation and mobility daily tasks.Howe ...
Read Project

 6