Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Erasmus Mundus Masters in Journalism, Media and Globalisation

Start date: Sep 1, 2016, End date: Aug 31, 2021,

...earch and industry links and exchanges into the delivery of our Mundus Master programme. Consortium: Aarhus University/Danish School of Media and Journalism (Denmark) (coordinator), University of Hamburg (Germany), University of Amsterdam (the Netherlands), City University London and Swansea University (UK), the University of California at Berkeley (USA), University of Technology Sydney (Austral ...
Read Project

 9

 FINISHED 
Many HIV vaccine concepts and several efficacy trials have been conducted in the prophylactic and therapeutic fields with limited success. There is an urgent need to develop better vaccines and tools predictive of immunogenicity and of correlates of protection at early stage of vaccine development to mitigate the risks of failure. To address these complex and challenging scientific issues, the Eur ...
Read Project

 43

 FINISHED 

European Gram Negative Antibacterial Engine (ENABLE)

Start date: Feb 1, 2014, End date: Jan 31, 2020,

The intensive use and misuse of antibiotics has resulted in some level of antibiotic resistance in essentially all human bacterial pathogens. There is a growing concern that the loss of therapeutic options will present us with a post-antibiotic era where present and future medical advances are negated. Resistant bacteria dramatically reduce the possibilities of treating infections effectively, a ...
Read Project

 42

 FINISHED 
The SoundCity Project MONICA aims to provide a very large scale demonstration of multiple existing and new Internet of Things technologies for Smarter Living. The solution will be deployed in 6 major cities in Europe.MONICA demonstrates a large scale IoT ecosystem that uses innovative wearable and portable IoT sensors and actuators with closed-loop back-end services integrated into an interoperab ...
Read Project

 28

 FINISHED 
EuPRAXIA will produce a conceptual design report for the worldwide first 5 GeV plasma-based accelerator with industrial beam quality and user areas. EuPRAXIA is the required intermediate step between proof-of-principle experiments and ground-breaking, ultra-compact accelerators for science, industry, medicine or the energy frontier (“plasma linear collider”). The study will design accelerator tech ...
Read Project

 17

 FINISHED 
The project aims to ensure that the universities in Jordan and Syria can offer a high quality education compatible with European standards and meets the market needs of the emerging knowledge-based society by strengthening environmental teaching. Also, EGREEN aims to introduce the concept of environmental and climate change issues in order to graduate professional leaders who can meet market needs ...
Read Project

 14

 FINISHED 
The main objective of the project is the development of the pilot scale production system of the new generation of nanoporous organic and hybrid aerogels with multiple functions for application in gas and humidity adsorption, personal care and food. Thereby the fast manufacturing in form of spherical particles will be in focus in order to reduce the process time and to decrease the overall process ...
Read Project

 13

 FINISHED 
INMARE stands for “Industrial Applications of Marine Enzymes: Innovative screening and expression platforms to discover and use the functional protein diversity from the sea”. It is a collaborative Innovation Action to streamline the pathways of discovery and industrial applications of new marine enzymes and bioactives for targeted production of fine chemicals, drugs and in environmental clean-up ...
Read Project

 26

 FINISHED 
...rban planning;• To create a user interaction tool (web-server) that enables structured interaction with users and communities. smarticipate offers real world solutions developed and tested in Hamburg, Rome and London, that are fully effective and implementable, as well as sustainable in the long term. These three pilot city demonstrations are transferable to all cities throughout Europe, supportin ...
Read Project

 11

 FINISHED 
VOX-Pol is a 60-month, €5+ million project that integrates the world’s leading researchers and research groups in Violent Online Political Extremism (VOPE), to include those researching the intersection of terrorism and the Internet (incl. violent jihadists, violent separatists, etc.), the online activities of the extreme Right, the potential for violent online radicalisation, etc., in order to:1. ...
Read Project

 9

 FINISHED 
"The aim of SYBIL is to carry out extensive functional validation of the genetic determinants of rare and common skeletal diseases and the age related factors contributing to these painful conditions. To achieve this goal SYBIL will gather complementary translational and transnational scientists, systems biologists, disease modellers, leading SMEs and industrialists that will perform in-depth char ...
Read Project

 19

 FINISHED 

Silicon Nitride Coatings for Improved Implant Function (LifeLongJoints)

Start date: Apr 1, 2013, End date: Mar 31, 2018,

Articulating joint replacements represent a medical market exceeding €14 billion p.a. that is expected to rise as demographics reflect an ageing population. However, faster growth has been seen in the revision market, where prosthetic joints are replaced, than in primary interventions. The major cause of these revisions is that all joint replacements are prone to wear leading to loss of implant fu ...
Read Project

 16

 FINISHED 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Read Project

 126

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Preparing for Extreme And Rare events in coastaL regions (PEARL)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Coastal floods are one of the most dangerous and harmful natural hazards affecting urban areas adjacent to shorelines. Rapid urbanisation combined with climate change and poor governance means a significant increase in the risk of local surface flooding coinciding with high water levels in rivers and high tide or storm surges from the sea, posing a greater risk of devastation to coastal communiti ...
Read Project

 26

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 
Migraine is a common brain disorder, typically characterised by recurring, incapacitating attacks of 1-3 days of severe headache, autonomic dysfunction, and sometimes aura symptoms. The disease affects 15% of all European citizens including children, ranks among the WHO top 12 of most disabling and undertreated disorders, and is responsible for the highest socio-economic burden of any brain ailmen ...
Read Project

 14

 FINISHED 

Rational Bioactive Materials Design for Tissue Regeneration (BIODESIGN)

Start date: Jan 1, 2012, End date: Dec 31, 2016,

The development of functional materials for tissue regeneration is today mostly based on perceived and limited design criteria often using a single point approach with lengthy animal trials. The outcome after in-vitro and in-vivo evaluation is often disappointing resulting in a tedious iteration process. The main objective of this project is to achieve radical innovations in state-of-the-art bioma ...
Read Project

 21

 FINISHED 

Membrane Protein Nanocrystallography (NanoMem)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

Modern structural biology builds upon synergies between lab-bench scale science on the one hand and large scale research infrastructure on the other. NanoMem recognises the transformative opportunities that are created by current X-ray source and detector developments to impact strongly on membrane protein structure, a challenging sub-field of structural biology. We will exploit synchrotron based ...
Read Project

 11

 FINISHED 

Materials for a Magnetic Memory in Three Dimensions (M3d)

Start date: Dec 1, 2012, End date: Nov 30, 2016,

This project concerns data storage in three dimensions (3D). Conventional planar (2D) devices are expected to reach the limits of scaling within less than a decade. We will develop the materials needed for 3D memories based on magnetic shift-register devices, namely dense arrays of vertical magnetic wires in a matrix (race-track memory, IBM patent). In this concept series of bits are shifted alo ...
Read Project

 7

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Read Project

 116

 FINISHED 

Quantum sensor technologies and applications (QTea)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

This training network focuses on the development of modern quantum sensors based on precision measurements of inertial forces, electro-magnetic fields, and time. Important ideas and major contributions to current research in this field have originated from atomic physics and quantum optics. The topics covered are gravitational probing, rotational sensing, field probes, and atomic clocks, with pote ...
Read Project

 11

 FINISHED 

XPTO+ eXcellence in Professional Training Opportunities

Start date: Sep 1, 2014, End date: May 31, 2016,

The XPTO + project was promoted by the "Consortium XPTO +", which was coordinated EUROYOUTH and composed by the sending schools: Agrupamento de Escolas de Santo André (AESA), Escola Profissional de Fafe (EP Fafe) and Instituto da Soldadura e Qualidade (ISQ). XPTO + The result of a convergence of ideas and wills between all partners, for, in consortium, send graduates of vocational training of nat ...
Read Project

 45

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
"The MSY concept was included as a principle in the 2009 Green Paper on the reform of the Common Fisheries Policy (CFP) in accordance with the global imperative to manage fish stocks according to the maximum sustainable yield (MSY). This implies a commitment to direct management of fish stocks towards achieving MSY by 2015. Attaining this goal is complicated by the lack of common agreement on the ...
Read Project

 31

 FINISHED 

European Soft Matter Infrastructure (ESMI)

Start date: Jan 1, 2011, End date: Dec 31, 2015,

The central objective of this ESMI proposal is to create a top-level interdisciplinary research infrastructure available to a broad European materials research community. This is of crucial importance to the EU in view of the European strategy for nanosciences and nanotechnology and its implementation report that identifies “a lack of leading interdisciplinary infrastructures”.ESMI offers the mos ...
Read Project

 18

 FINISHED 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Read Project

 13

 FINISHED 

InnoVative Flexible Electric Transport (V-FEATHER)

Start date: Jul 1, 2012, End date: Oct 31, 2015,

The V-FEATHER project presents a complete electric vehicle architecture vision on how urban light duty vehicles will be designed, built and run in the near future. This project is led by industrial partners with emphasis on energy efficiency, commercial viability, life cycle design and development of new technologies for LDVs steered by leading research institutes.The vehicle is built around an ac ...
Read Project

 11

 FINISHED 
The overall objective of EFENIS is to facilitate and accelerate a move to low carbon manufacturing processes and site management by deployment and demonstration of innovative energy management systems and enabling efficiency technologies, which extend the scope of energy management outside the boundaries of a single plant to total site and then beyond the total site to district heating/cooling sys ...
Read Project

 18

 FINISHED 
A study on fatal accidents of professional drivers in Finland (Laapotti & Peräaho 2011) has revealed that the risks in loading and securing of cargo comprised 12 % of all vehicular risk factors. This was more than the proportion of risks connected to tires and brakes together (10 %). Europe is an area where goods and products can move around freely, without any checks at the national borders. Thi ...
Read Project

 18

 FINISHED 
RNA virus infections kill millions of humans annually, largely due to the lack of suitable vaccines and drugs to control them. This problem is addressed in this FP7 call and in response a consortium of Europe’s and Asia’s leading molecular virologists, structural biologists, medicinal chemists and bioinformaticians has been brought together to generate a state-of-the-art drug discovery and design ...
Read Project

 25

 FINISHED 

Climate Neutral Urban Districts in Europe (CLUE)

Start date: Dec 31, 2011, End date: Dec 30, 2014,

The project idea Climate Neutral Urban Districts in Europe (CLUE) was formulated by a team of experts at the City of Stockholm and KTH Royal Institute of Technology in Stockholm. The project idea was first presented during the EU Interregional Cooperation Forum, 20/21 September 2007, Lisbon. The objective of the CLUE regional development project is increased regional capacity in policy development ...
Read Project

 12

 FINISHED 
The extension stage project “Best Agers Lighthouses” focuses on implementation of age management interventions in selected small and medium-sized enterprises and public organisations in different Baltic Sea Region countries. The interventions will follow a jointly developed methodology which is based on the results of the “Best Agers” project, and they will be monitored and evaluated scientificall ...
Read Project

 12

 FINISHED 
The project North Sea Region Electric Mobility Network (E-Mobility NSR) provides state of the art information which may help policy development in e-mobility in the NSR. It also provides insight into the gaps and needs in respect of infrastructure, logistics and preliminary standards for multi charging techniques. Ultimately, the project will deliver a long-term basis upon which regional and local ...
Read Project

 17

 FINISHED 
Key questions in physics can be answered only by constructing a giant underground observatory to search for rare events and study terrestrial and astrophysical neutrinos. The Astroparticle Roadmap of ApPEC/ASPERA strongly supports this, recommending that: “a new large European infrastructure of 100'000-500'000 ton for proton decay and low-energy neutrinos be evaluated as a common design study tog ...
Read Project

 39

 FINISHED 

Collaborative research on flood resilience in urban areas (CORFU)

Start date: Apr 1, 2010, End date: Jun 30, 2014,

Collaborative research on flood resilience in urban areas (CORFU) is an interdisciplinary international project that will look at advanced and novel strategies and provide adequate measures for improved flood management in cities. The differences in urban flooding problems in Asia and in Europe range from levels of economic development, infrastructure age, social systems and decision making proces ...
Read Project

 17

 FINISHED 

QUICK: Innovative SMEs by Gender and Age (Quick-IGA)

Start date: Sep 19, 2011, End date: Mar 27, 2014,

The following findings are the background of the project: a) The number of persons in employable age in the BSR countries decreases by up to 20 % until 2030.b) The increasing lack of skilled workers will limit innovation and growth of SMEs.c) While equal opportunities for women and elderly in the workplace are comparably high in Scandinavia, it must be improved considerably in countries south of t ...
Read Project

 13

 FINISHED 

European Clearing House for Open Robotics Development (ECHORD)

Start date: Jan 1, 2009, End date: Dec 31, 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Read Project

 105