Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Chronic aortic aneurysms are permanent and localized dilations of the aorta that remain asymptomatic for long periods of time but continue to increase in diameter before they eventually rupture. Left untreated, the patients’ prognosis is dismal, since the internal bleeding of the rupture brings about sudden death. Although successful treatment cures the disease, the risky procedures can result in ...
Read Project

 26

 FINISHED 

EuroPubHealth Plus

Start date: Sep 1, 2016, End date: Aug 31, 2021,

...to 4 months, the drafting and defence of a master thesis. Students choose one of seven pathways which focus on specific public health functions or disciplines: • Health Promotion (University of Granada/Andalusian School of Public Health, taught in Spanish), Spain;• Leadership in European Public Health (University of Maastricht, English), The Netherlands;• Governance of Health Systems in transition ...
Read Project

 6

 FINISHED 
Graphene is considered a very promising material. Perfect samples of graphene without structural defects are extremely electrical and thermal conductive. However, defects usually appear during the production of graphene, modifying its thermal, electrical and mechanical properties. If we understand the influence of imperfections on the properties of graphene, we may tune its local electrical proper ...
Read Project

 1

 FINISHED 
Sustainable Multi-functional Automated Resilient Transport Infrastructures ETN, will bring together a stimulating platform where the stakeholders of the transport infrastructure sector will work alongside world-wide experts in smartening of systems (developers of high-tech sensors, advanced monitoring equipment, automated structures, etc.,) with direct support from the roads, railways and airport ...
Read Project

 9

 FINISHED 
Understanding mechanisms underlying comorbid disorders poses a challenge for developing precision medicine tools. Psychiatric disorders are highly comorbid, and are among the last areas of medicine, where classification is driven by phenomenology rather than pathophysiology. We will study comorbidity between the most frequent psychiatric conditions, ADHD, mood/anxiety, and substance use disorders, ...
Read Project

 17

 FINISHED 
Background The link between the provision of key ecosystem services (e.g. soil retention, temperature regulation, pollination) and socio-ecosystems (e.g. mountain Mediterranean scrub, coastal dune forests) in three Mediterranean Natural Protected Areas (NPAs) is well established on the basis of long-term management experience and scientific knowledge. Hab ...
Read Project

 7

 FINISHED 
...kills - and DestiNA Genomics - with ‘error free’ chemical technology for microRNAs recognition – joined forces with three key academic research groups from the Universities of Trento (Italy), Granada (Spain) and Santa Catarina (Brazil). All the parties combined their knowledge with respect to miRNA biomarkers with a particular focus on lung cancer, to develop a novel and reliable miRNA detection s ...
Read Project

 4

 FINISHED 

COlour in Science and Industry

Start date: Oct 15, 2014, End date: Oct 14, 2019,

...eeds of the industry on the other hand.Course durationTwo years (120 ECTS credits).Brief descriptionCOSI involves four EU HEIs as full partners: University Jean Monnet (UJM – France), University of Granada (UGR- Spain), University of Eastern Finland (UEF–Finland), Gjøvik University College (GUC–Norway); five associated industrial partners; four HEIs in Asia as associated academic partners; and ten ...
Read Project

 4

 FINISHED 

TUnisian Network for Employability and Development of Graduates' Skills

Start date: Oct 15, 2016, End date: Oct 14, 2019,

Following the request of the Tunisian Ministry of HE, the project will support the ongoing reform of the HE system by the scaling up of the TEMPUS ISLAH observatory so to include the new coming universities of Tunis, Carthage, Kairouan and Sfax, in the integrated demand supply matching model, designed as to achieve the following results: -collect and analyze data on university and graduates perfor ...
Read Project

 14

 FINISHED 

GRACE: Gender and Cultures of Equality in Europe (GRACE)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

The aim of the GRACE (Gender and Cultures of Equality in Europe) project is to systematically investigate the cultural production of gender equalities within Europe. Extending the success of GEMMA, the Erasmus Mundus ‘Masters of Excellence’ in Women’s and Gender Studies, the central objective of GRACE is to become the programme of reference for innovative interdisciplinary doctoral training for ea ...
Read Project

 8

 FINISHED 
One area with greater relevance to use ICT is educational context, because with them, it will compensate the adequacy to the needs and characteristics of the students. Now, one of the problems facing the future teachers for their incorporation into educational practice is to have acceptable levels of training, both in regards to its technological and instrumental knowledge as with respect to its m ...
Read Project

 11

 FINISHED 

Art et Apprentissage

Start date: Sep 1, 2016, End date: Aug 31, 2019,

1. BackgroundToday, many scientific studies show the positive impact of artistic practices on learning. Teachers involved with their students in artistic projects reflect the contributions observed on the cognitive level, especially on attention, memory, motivation, self-esteem and social cohesion.Yet school systems in Belgium, France and Spain do not allow art programs in schools .In Spain, arts ...
Read Project

 8

 FINISHED 

Economic Integration in the European Union

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Reason:The Chair will become the backbone of Economic Studies on European Integration at the University of Granada.The European Convention has established the need for a broader debate on the core issues of the economic future of Europe. This debate on the “deepening and widening” of the European Union will be promoted on different levels and with regard to various target groups. Output:The main o ...
Read Project

 1

 FINISHED 
The overall concept of the project consist of supporting innovation in SMEs and fostering the smart reindustrialization of Europe by enabling the emergence of new cross-border and cross-sectoral value chains resulting from the translation of advanced technologies among selected sectors with strong synergies. These new value chains will be created from the interaction of the following sectors: aer ...
Read Project

 13

 FINISHED 
Terrestrial and marine ecosystems provide essential services to human societies. Anthropogenic pressures, however, cause serious threat to ecosystems, leading to habitat degradation, increased risk of collapse and loss of ecosystem services. Knowledge-based conservation, management and restoration policies are needed to improve ecosystem benefits in face of increasing pressures. ECOPOTENTIAL makes ...
Read Project

 47

 FINISHED 
The multidisciplinary project will address key technical issues that must be tackled to support the implementation of planned geological disposal projects for higher-level radioactive wastes across the EU. Our current understanding of the impact of microbial metabolism on the safety of geological repositories remains tenuous, even though microorganisms may have controlling influences on wasteform ...
Read Project

 15

 FINISHED 
A collective effort is needed to create the environmental research infrastructure for answering pressing questions in a world of rapid social, economic and environmental change.The overall aim of the eLTER project is to advance the European network of Long-Term Ecosystem Research sites and socio-ecological research platforms to provide highest quality services for multiple use of a distributed res ...
Read Project

 31

 FINISHED 

Astronomy ESFRI and Research Infrastructure Cluster (ASTERICS)

Start date: May 1, 2015, End date: Apr 30, 2019,

ASTERICS (Astronomy ESFRI & Research Infrastructure Cluster) aims to address the cross-cutting synergies and common challenges shared by the various Astronomy ESFRI facilities (SKA, CTA, KM3Net & E-ELT). It brings together for the first time, the astronomy, astrophysics and particle astrophysics communities, in addition to other related research infrastructures. The major objectives of ASTERICS ar ...
Read Project

 24

 FINISHED 

Aerosols, Clouds, and Trace gases Research InfraStructure (ACTRIS-2)

Start date: May 1, 2015, End date: Apr 30, 2019,

ACTRIS-2 addresses the scope of integrating state-of-the-art European ground-based stations for long term observations of aerosols, clouds and short lived gases capitalizing work of FP7-ACTRIS. ACTRIS-2 aims to achieve the construction of a user-oriented RI, unique in the EU-RI landscape. ACTRIS-2 provides 4-D integrated high-quality data from near-surface to high altitude (vertical profiles and t ...
Read Project

 32

 FINISHED 
The Gluco-Psychosocial Axis (GPA) concerns the interplay of factors determining glucose metabolism and insulin sensitivity and the neuroendocrine response resulting from exposure to psychosocial stress. A sub-optimal GPA influences the development of type 2 diabetes and related impairments with varying degrees of interplay between genetics and early growth (particularly adiposity and cognitive fun ...
Read Project

 14

 FINISHED 
Most European Lifelong Learning (LLL) policies have been designed to create economic growth and, at the same time, guarantee social inclusion (EC 2010). First, we will study how different LLL policies are compatible with each other in terms of their orientations and objectives and how each policy considers the needs of ‘young adults’. Second, we will research the intended and unintended effects of ...
Read Project

 15

 FINISHED 
We concur to the IMI on “Reclassification of SLE, connective tissue diseases and RA” call by presenting a proposal aimed at using the power of OMICs, and bioinformatics to identify new classifications for diseases known to share common pathophysiological mechanisms. Such knowledge has not been applied to individual patients, depriving them from potential benefits in terms of the use of new therape ...
Read Project

 30

 FINISHED 
The aim of MultiSens is to develop a revolutionary quality indicator platform for the food industry. This innovative intelligent packaging platform will alert the customer of the meat quality adding value and benefits across the food packaging supply chain, reducing waste, providing valuable end user feedback and help Europe maintain a market competitive advantage. In the EU alone, food waste alon ...
Read Project

 1

 FINISHED 
Internationalization is becoming critical for an increasing number of European academic spin offs. Managers of these organizations are in a key position to effectively and strategically deal with the new challenges of the globalization of markets. The GLOBAL-SPIN project aims to develop an innovative and inclusive training tool for managers of academic spin offs on transnational entrepreneurship, ...
Read Project

 7

 FINISHED 
The construction sector, currently in crises in some countries due to the economic development model adopted during last decades, can again play an important role for the European economy to be more innovative by using fewer resources (raw materials and energy) and reducing environmental impact (emission of greenhouse gases and dust pollution). Access to raw materials and resource efficiency are a ...
Read Project

 10

 FINISHED 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Read Project

 9

 FINISHED 

Smart Manufacturing for EU Growth and Prosperity (MAKERS)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

MAKERS will bring together leaders from business, academia and policy to study issues related to the drivers and dynamics of sustaining the competitiveness of EU manufacturing sectors. The project’s innovative research, training and mobility activities will address key concerns related to the historic opportunity for the EU to lead a manufacturing renaissance that not only upgrades existing manufa ...
Read Project

 17

 FINISHED 

Formación en centros de trabajo en otros países de la Unión Europea

Start date: Dec 31, 2016, End date: Dec 30, 2018,

...he long term we expect to extend the mobility and employment companies so that it could be enjoyed by others through the possible future creation of a consortium with several of the five centres of Granada or others from Andalusia, offering VET courses in microcomputer systems and networks.
Read Project

 9

 FINISHED 
...mming; the training will take place in Spanish IT companies. The transnational partnership includes: the Pentecostal High School from Arad as project beneficiary, Desarrollo Web and DSI Spain Granada as host organizations and MEP Europrojects Granada as intermediate organization. The need the project addresses is that of improvement of training opportunities, in order to promote a highly qualified ...
Read Project

 4

 FINISHED 
Emerging evidence indicates that the gut microbiome contributes to our ability to extract energy from the diet and influences development and function of the immune, endocrine and nervous systems, which regulate energy balance and behaviour. This has led to hypothesize that developing microbiome-based dietary interventions can be cost-effective measures to prevent diet-related and behavioural diso ...
Read Project

 30

 FINISHED 
To meet the greenhouse gas reduction targets set by the European Commission and to reduce the reliance on imported energy sources from not-EU countries, the energy efficiency sector vitally needs basic analytical and decision support tools. This is especially true for large scale energy-consumer plants (for ex. foundries) but also for medical centres which typically (1) use large amounts of energy ...
Read Project

 10

 FINISHED 
The project is designed to create in Maghreb a PhD school in regular PhD programs in water & environment, improve existing prerequisite courses and develop new modern courses to train staff and PhD students, through a regional Hydroplatform establishment based on open GIS and modeling softwares, to follow-up the recent water strategies in Maghreb (2010-2030).This goal is consistent with the HE sys ...
Read Project

 11

 FINISHED 
Through the project "European opportunities for training and integrating on the job market from the hotel industry" whose beneficiary is the Technological High School "Nicolae Dumitrescu", we consider that we'll achieve the main strategic objective from the institutional developing plan- correlating professional training of graduates with the demands of the job market and we'll create a model of a ...
Read Project

 7

 FINISHED 
The artistic and cultural sector is growing all over Europe. This trend is stronger in countries with a long tradition (like UK) where the impact on GDP and jobs is considerable, weaker in other areas of Europe that still need policies and ecosystem to foster the growth of the sector.What is visible all around Europe is the need, for the operators of the sectors, particularly arts/culture, to dev ...
Read Project

 7

 FINISHED 

Capacity Building for Intermediary Organisations through e-learning

Start date: Oct 1, 2016, End date: Sep 30, 2018,

In many countries of the Southern and Eastern Europe, current legislative reform is moving the apprenticeship system from a 100% school-based system towards a company based system. However, neither the intermediary organisations nor the companies are ready in order to cope with this change. The E-APPREN project is aiming to build the capacity of the intermediary organisations to support apprentice ...
Read Project

 10

 FINISHED 
This project is going to be realized in a form of three – week foreign technical training, in companies dealing with IT, production, trading and service branches. The realization of this practice is going to take place two years. The participants of this project will be 66 students from Zespol Szkol No 3 in Wyszkow who educate in IT and economical areas. The offer will be directed to the students ...
Read Project

 4

 FINISHED 

Betriebspraktika in Granada für kaufmännische Assistentinnen

Start date: Oct 1, 2016, End date: Sep 30, 2018,

The project "Internships in Granada for Commercial Assistants" aims at facilitating temporary internships for certain students of our full-time vocational school for foreign language secretaries.We are trying to encourage and provide for students without a proper financial background to experience internships in Spain, widening their horizon and improving skills.We are applying for funding for two ...
Read Project

 2

 FINISHED 

Velká Británie, Španělsko a Turecko - cestovní ruch a gastronomie

Start date: Oct 1, 2016, End date: Sep 30, 2018,

...ur school, pass a compulsory work placement abroad. Foreign internships will take place in Spain, Great Britain and Turkey and will be carried out in cooperation with our partners M.E.P. Europrojects Granada (ESP), Internship in Brughton (UK) a Sirene Belek Hotel (TU).The objectives of the project are to improve the quality of students' practical training, their expertise to enable them to applyth ...
Read Project

 4

 FINISHED 

Euro-start Zawodowy

Start date: Sep 5, 2016, End date: Sep 4, 2018,

...eeing social protection and inclusion. The project encompasses 24-month duration (05/09/2016- 04/09/2018) and it is based on mobilities of students in order to serve their 4-week internships in Granada/ Spain and Dublin/ Ireland. The students participating in the mobilities will be divided into 2 groups (20 trainees in May 2017, 18 trainees in May 2018)) accompanied by teachers. Due to the uniqu ...
Read Project

 3

 FINISHED 
...evelopment modules. Project partners with relevant expertise are each responsible for a module: Cologne for vocabulary acquisition; Jyvaskyla for language and literacy in their social context; Granada for reading development from a psycholinguistic perspective, Newcastle for acquisition and assessment of morphosyntax and Bogazici for bilingualism/multilingualism. Northumbria is responsible for al ...
Read Project

 7