Search for European Projects

39 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Sustainable intensive pig and poultry production (PROHEALTH)

Start date: Dec 1, 2013, End date: Nov 30, 2018,

Production diseases compromise health and welfare, generating inefficiencies which impact adversely on profitability, environmental footprint, antibiotic use and product quality.The PROHEALTH project will develop understanding of the multi-factorial dimension of animal pa-thologies linked to the intensification of production and use this to develop, evaluate and disseminate ef-fective control stra ...
Read Project

 24

 FINISHED 
The principal aim of this project is to develop and apply revolutionary graphics rendering and artificial intelligence (AI) methods to an existing social media search engine platform (known as Tapastreet) thereby creating ground breaking mobile search capabilities with significant online commercial potential.Specifically these goals will be achieved by meeting the following Scientific & Technologi ...
Read Project

 3

 FINISHED 

Prediction of Erosion Damages in Hydraulic MAchines (PREDHYMA)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

"Hydraulic turbines can undergo severe damaging during operation, because of low quality water or detrimental flow conditions. Damaging induces maintenance costs and power production losses, and can also endanger safety of installations. Hydropower plants operators and turbine manufacturers are interested in extending overhaul periods by reducing damaging intensity and protecting turbine component ...
Read Project

 2

 FINISHED 

COatings for BipolaR plAtes (COBRA)

Start date: Apr 1, 2014, End date: Mar 31, 2017,

"Several automotive OEMs have announced plans for the commercialization of fuel cell vehicles from 2014/15. While this is a clear signal for the readiness of the automotive market, durability, efficiency, power density and cost of the fuel cell stack need further advancements and in some cases substantial improvement in years to come.Industrial fuel cell development in Europe lacks both state-of-t ...
Read Project

 6

 FINISHED 
"OILTEBIA (Optical Imaging and Laser TEchniques for BIomedical Applications) is an Initial Training Network (ITN) that seeks to train researchers in a multidisciplinary environment where pulsed laser technology, sensor and signal processing techniques meet in the biomedicalenvironment to achieve novel optical imaging technologies from bench to bedside, spanning from basic research and drug discove ...
Read Project

 10

 FINISHED 

Advanced materials for batteries (MAT4BAT)

Start date: Sep 1, 2013, End date: Feb 28, 2017,

"Li-ion technologies initiated in the 90’ at a fast development pace thanks mainly to emerging ICTs with more than 20 GWh sold in 2010. Soon, it appeared as a credible technology for electrical vehicles as it could provide average energy densities of about 140 Wh/kg. However and since then,major breakthroughs have been expected to reach higher storage levels of 250 Wh/kg on battery system level wi ...
Read Project

 18

 FINISHED 
As today’s energy policy decisions are not only very complex, but also fundamentally political decisions, the necessity to build them on sound, unbiased and up-to-date information/knowledge makes energy policy analysis and advice from a broad array of non-commercial actors key to effective policy formulation. Taking this into account, it is the aim of this project to establish a multidisciplinary ...
Read Project

 13

 FINISHED 
The SITOGA project will address for the first time the integration of transition metal oxides (TMO) materials in silicon photonics and CMOS electronics. TMOs have unique electro-optical properties that will offer unprecedented and novel capabilities to the silicon platform. SITOGA will focus on two disruptive TMO materials, barium titanate (BaTiO3) and vanadium oxide (VO2), for developing advanced ...
Read Project

 8

 FINISHED 

Evolution of Evolution (EvoEvo)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Evolution is the major source of complexity on Earth, at the origin of all the species we can observe, interact with or breed. On a smaller scale, evolution is at the heart of the adaptation process for many species, in particular micro-organisms (e.g. bacteria, viruses...). Microbial evolution results in the emergence of the species itself, and it also contributes to the organisms' adaptation to ...
Read Project

 7

 FINISHED 
This project aims at the development of an automatic quality control and feedback mechanism to improve draping of carbon fibres on complex parts. There is a strong need in the automotive industry for automatic systems that perform quality control and improve draping processes in order to allow high production volumes.The technology that is being developed in the project will include a new sensor s ...
Read Project

 7

 FINISHED 

OPerating RAck For Full-Electric Vehicle (OPERA4FEV)

Start date: Sep 1, 2011, End date: Aug 31, 2016,

To improve deployment of electrical vehicles in Europe, large scale production processes for Rack, cells and electrical components need to be developed. The OPERA4FEV project aims to develop a cost effective innovative thermoplastic battery rack, able to integrate any type of cylindrical cells. The solution proposed by OPERA4FEV project, adaptable to any Full Electric Vehicle model, will indeed in ...
Read Project

 11

 FINISHED 
Proposal Full title: Biomimetic Approaches of Natural Functional Surfaces with hierarchical micro & nano structure and the extreme Wettability (Acronym: BioApproNFS Wett)Abstract:In the natural world, plants and animals have evolved over time to best adapt to the environment. They interact very effectively with the surrounding environment by exchanging energies and mass flow across their cuticles ...
Read Project

 6

 FINISHED 

POWER SoC With Integrated PassivEs (PowerSwipe)

Start date: Oct 1, 2012, End date: Mar 31, 2016,

Europe is a world leader in innovative automotive systems with competencies covering the full supply chain from the main OEMs (Audi, BMW, Daimler, Fiat, PSA, RSA, VW) to Tier1 suppliers (Bosch, Continental, Magneti Marelli) to leading semiconductor companies (Infineon, ST). The vision for electronic automotive control units in 2020 is that the battery will supply multi-core µControllers via multip ...
Read Project

 9

 FINISHED 

BIOCERAMICS FOR BONE REPAIR (BIOBONE)

Start date: Mar 1, 2012, End date: Feb 29, 2016,

"There is a general consensus that ceramic based materials should play a very important role in the development of new therapies to treat and substitute damaged or diseased bone. Due to their resistance to wear and corrosion, bioinert technical ceramics are the ideal candidates to replace metallic alloys in a new generation of small, durable and safe orthopaedic implants. On the other hand, osteoc ...
Read Project

 9

 FINISHED 
"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Read Project

 29

 FINISHED 
"SMILEY aims to develop and apply a ""bottom-up"" approach to build nano-structured devices with smart multi-functional properties: bio-mineralization, self-assembly, self-organization are an ensemble of concomitant phenomena, inspired by nature, that will be properly directed to generate elementary nano-sized building blocks organized in macroscopic devices for application in EHS (Environment, He ...
Read Project

 8

 FINISHED 
In the current market, the well-known brands of technical textiles are coated with Perfluorocarbon chemistry to possess highly durable oil and water repellent (OWR) finish. In early days, water repellent finish for fabrics was provided by simple paraffin or wax coatings which washed out eventually. Alternatively, PFOS and PFOA are the chemicals belonging to the family of perflourochemicals (PFCs) ...
Read Project

 12

 FINISHED 
"The DIABAT project will employ knowledge of the function, dysfunction and physiological regulation of brown adipocytes to develop innovative therapeutic and preventive strategies for type 2 diabetes. Brown adipose tissue (BAT) is currently a worldwide recognized target to combat obesity and diabetes due to last years re-discovery of functional BAT in adult humans by several of the members of the ...
Read Project

 22

 FINISHED 
The aim of LONGLIFE is to develop new multi-functional zirconia oral and spine (lumbar inter-vertebral disc) implants, with a perfect reliability and a lifetime longer than 60 years. Such an ambitious goal, motivated by the risks and costs associated to revision surgery, will only be reachable by an improvement of the Low Temperature Degradation (LTD) resistance of zirconia and by an enhancement o ...
Read Project

 13

 FINISHED 
The greater use of polymer matrix composite materials would be highly desirable. Their low weight, along with their inherent resistance to corrosion and fatigue, enables more fuel efficient and sustainable transport structures. However, for many applications, the biggest factor currently preventing the more widespread use of light high-performance polymer matrix composites is their poor fire perfo ...
Read Project

 20

 FINISHED 
This proposal addresses the consolidation of the European Centre for Nanostructured Polymers - ECNP - which was established in 2006 by the European Network of Excellence NANOFUN-POLY (FP6 2004-2008) and is currently operating in coordinating research, dissemination and technology transfer activities among its partners. ECNP is focused on the continuation of the four main activities of the NoE: a j ...
Read Project

 5

 FINISHED 
The objective of NEUJOBS is to imagine future, or rather various possible futures, under the conditions of the socioecological transition (and incorporating other key influences), map the implications for employment overall, but also in key sectors and relevant groups and integrate all of this together under a single intellectual framework. It will do so by combining EU-wide studies based on exist ...
Read Project

 31

 FINISHED 
"Recent studies suggest that vehicles, driven in electric mode, either hybrid or pure electric vehicles, are considerably quiet and, thus, that they constitute a safety hazard for pedestrians and bicyclists in traffic. It is claimed that such vehicles are not acoustically perceived due to the power unit being exchanged from a combustion engine to electric motors; something that essentially cuts aw ...
Read Project

 13

 FINISHED 

Packaging of futuRe Integrated ModulAr Electronics (PRIMAE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

"Affordable transport for the citizen relies on innovative solutions and technologies that will result in lower costs and lead-time of the aircraft and its systems. In this area, the packaging of on-board computers is an important contributor.The Packaging of futuRe Integrated ModulAr Electronics (PRIMAE) objective is to develop a new flexible, robust and open aeronautical packaging for the next g ...
Read Project

 20

 FINISHED 

COMPOSITE PHENOTYPIC TRIGGERS FOR BONE AND CARTILAGE REPAIR (OPHIS)

Start date: Sep 1, 2010, End date: Aug 31, 2014,

Osteoarthritis (OA) and osteoporosis (OP) are disabling, degenerative bone diseases with significant economic and societal impacts. The incidence of these conditions increases with age but in recent years the number of younger patients has increased, due mainly to factors related to modern life-styles. The efficiency of current pharmacologic and implant-based solutions are limited and often poorly ...
Read Project

 9

 FINISHED 
Searching for the alternative energy sources and particularly for liquid fuel is strategic task for the nearest future. Renewable biomass, large deposits of natural gas and coal can be such sources. A major challenge for this direction is to develop efficient the gas-to-liquid process. The heart of such process is Fischer-Tropsch (FT) synthesis (CO hydrogenation by hydrogen) that takes place on Co ...
Read Project

 4

 FINISHED 

A quantitative model of thrombosis in intracranial aneurysms (THROMBUS)

Start date: Feb 1, 2011, End date: Apr 30, 2014,

Rupture risk of intracranial aneurysms (IA) has been studied at length. However, very little is known about the healing mechanism, namely the formation of a clot inside the cavity after insertion of a stent. The multiscale interaction between biological and hemodynamic processes is the central ingredient of this proposal. The core of the project is to develop and validate a biological model of spo ...
Read Project

 10

 FINISHED 

Standardisation of laboratory analytical methods (SLAM)

Start date: Apr 1, 2012, End date: Mar 31, 2014,

SLAM is a project proposal for a supporting and coordinating activity with the objective of reviewing the needs for standardisation of CBRN analysis and suggesting a road map for its implementation. All partners to the SLAM consortium are significant players in on-going dialogues on CBRN analytical requirements and procedures on the European scene. The composition of this consortium is well-balanc ...
Read Project

 10

 FINISHED 

PREPARED “ENABLING CHANGE” (PREPARED)

Start date: Feb 1, 2010, End date: Jan 31, 2014,

IPCC climate change scenarios have a global perspective and need to be scaled down to the local level, where decision makers have to balance risks and investment costs. Very high investments might be a waste of money and too little investment could result in unacceptable risk for the local community. PREPARED is industry driven, 12 city utilities are involved in the project and the RDT carried out ...
Read Project

 36

 FINISHED 
"CRISIS is a 42 month project to research and develop an advanced critical incident management, interactive simulation environment for training security and emergency personnel in airport operational security. The prototype to be delivered will be distributed, scalable, collaborative interactive simulation environment that will enable training of crisis managers and their staff at airports, at dif ...
Read Project

 13

 FINISHED 
Mutation of transport industry to carbon fibre reinforced polymer (CFRC) is now ineluctable in order to reduce our mobility environmental imprint. This sector is at a turn of its conversion from metal to composite, which should impose a radical rethinking of the whole supply chain. Combined developments of materials and matched processes is the main strategy of IMS&CPS project, only such a concert ...
Read Project

 16

 FINISHED 
"The ARISTOTEL project challenge is ensuring aircraft safety and aims to reduce the aircraft and rotorcraft accidents caused by a particularly unfavourable category of phenomena: aircraft-pilot-couplings and rotorcraft-pilot-couplings (A/RPCs). Generally, A/RPCs are defined as “inadvertent, sustained aircraft oscillations which are a consequence of an abnormal joint enterprise between the aircraft ...
Read Project

 10

 FINISHED 

Virtual Physiological Human Network of Excellence (VPH NoE)

Start date: Jun 1, 2008, End date: May 31, 2013,

Description The Virtual Physiological Human Network of Excellence (VPH NoE), 2008-2013, served as a rallying point and source of best-practice information for the VPH community.  This role has now has been passed to the VPH Institute (http://www.vph-institute.org/).  The tools and educational/outreach materials developed by the VPH NoE – and ...
Read Project

 23

 FINISHED 

Indoor radio network PLANning and optimisation (iPLAN)

Start date: Jun 1, 2009, End date: May 31, 2013,

It is estimated that 2/3 of the calls (voice services) and 90% of data services (e.g., Internet access) using wireless technologies take place indoors. How to plan and design good indoor radio networks has become a paramount issue. However, the vast majority of the work on Radio Access Network (RAN) Planning and Optimisation (P&O) has been done for outdoor rather than indoor. As a result, there la ...
Read Project

 4

 FINISHED 

Engine LUBrication SYStem technologies (ELUBSYS)

Start date: Jun 1, 2009, End date: Nov 30, 2012,

"In aeronautics, gas turbine engines are equipped with lubrication systems whose function is to cool and lubricate the highly loaded rolling bearings and gearboxes. Current lubrication systems are based on architectures and technologies that have not much evolved for the last 30 years and that, despite advances made on components, have reached their technological limit. Future aero-engine requirem ...
Read Project

 20

 FINISHED 
"Effective and efficient vibration and acoustic analysis, modelling and design methods are required to produce world-leading products with good noise and vibration performance. Noise and vibration levels must remain within safe limits, there are issues regarding human comfort and a need for robust, optimal, efficient designs. There is also an increasing trend towards virtual design and prototyping ...
Read Project

 13

 FINISHED 
The main purpose of the EVINCI-study is to test the impact of combined “anatomo-functional” non invasive cardiac imaging for detection and characterization of Ischemic Heart Disease (IHD). The EVINCI-study is a prospective clinical European multicenter trial performed in a cohort of 700 patients with suspected IHD. Patients with intermediate pre-test probability will undergo clinical and biohumora ...
Read Project

 22

 FINISHED 
This proposal aims to investigate the ways the destruction and subsequent selective reconstruction of the cultural heritage impact identity formation. Recent conflicts in Europe, as well as abroad, has brought the deliberate destruction of the heritage of others, as a means of inflicting pain, to the foreground. With this has come the realisation that the processes involved and thus the long-term ...
Read Project

 9

 FINISHED 

Wavelength Division Multiplexed Photonic Layer on CMOS (WADIMOS)

Start date: Jan 1, 2008, End date: Jun 30, 2011,

WADIMOS proposes to develop a generic technology for the realization of complex electro-photonic integrated ICs using standard CMOS processing technologies.These ICs will contain a photonic interconnect layer incorporating microsource arrays and ultracompact WDM (wavelength division multiplexing) functionality based on silicon nanophotonic wire circuits, driven directly from by the CMOS electronic ...
Read Project

 8