Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 

Advanced Ablation Characterization and Modelling (ABLAMOD)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

"As mentioned in the FP7 space call for Europe to be active in space in the long term, be it in earth-orbit or across the solar system, it is essential that space technologies with key capabilities are at its disposal. This goal requires developments by radical innovation which may then lead to “disruptive technologies”. In this frame new thermal shielding and low risk return strategies are define ...
Read Project

 11

 FINISHED 
Inspection and Maintenance are important aspects when considering the availability of aircraft for revenue flights. Modern airframe design is exploiting new exciting developments in materials and structures to construct ever more efficient air vehicle able to enable ‘smart’ maintenance including self-repair capabilities. The improvement in the aircraft safety by self-healing structures and protect ...
Read Project

 10

 FINISHED 

RECEPTivity and amplitude-based transition prediction (RECEPT)

Start date: Feb 1, 2011, End date: Apr 30, 2015,

"The RECEPT project will deliver upstream aerodynamics research that will contribute (i) to the drive to strengthen the competitiveness of European manufacturing industry, (ii) to the need to improve the environmental impact of aircraft with regards to emissions.Within the RECEPT project, knowledge about transition phenomena and theoretical/numerical tools obtained during the last 50 years since t ...
Read Project

 12

 FINISHED 
"HIKARI (“light” in Japanese) aims at pursuing and bringing one step further cooperation between Europe and Japan in the field of high speed transport (HST).Such a disruptive approach to commercial air transport will foster innovation, ensure leadership in high technology areas, and contribute to ACARE goals by studying alternative fuels and low emissions propulsive technologies. But for such a pr ...
Read Project

 15

 FINISHED 

Smart Aircraft in Emergency Situations (SMAES)

Start date: Feb 1, 2011, End date: Oct 31, 2014,

"Ditching analysis is requested for large transport aircraft by EASA. The respective requirements are specified under § ‘’CS 25.801 Ditching’’. They are primarily devoted to a minimisation of risks for immediate injuries and the provision of fair chances for an evacuation. A significant part of average air travel is over water and historically a planned or unplanned water-landing event occurs gros ...
Read Project

 16

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

Planetary Entry Integrated Models (Phys4Entry)

Start date: May 1, 2010, End date: Apr 30, 2014,

One of the major technological challenges associated with the access to planetary surfaces is the entry of the space vehicle in the planetary atmospheres at superorbital speeds. The problem is the very large heat released to the vehicle surface by the surrounding gas either as convective heating or as radiation. Optimization of the thermal shield design can have a profound impact on the overall mi ...
Read Project

 14

 FINISHED 

High-Speed Experimental Fly Vehicles (HEXAFLY)

Start date: Oct 1, 2012, End date: Mar 31, 2014,

"The HEXAFLY project aims to mature an experimental high-speed self-propelled vehicle in combination with several multi-disciplinary technologies. By this approach, the grounds for a future flight test will be prepared and potential technological risks identified in time. This potential will increase drastically the Technology Readiness Level (TRL) of developments realized in previous high-speed a ...
Read Project

 6

 FINISHED 

Air Transport Net (AirTN) (AirTN)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

The AirTN ERA-Net was established under FP6 as a network of Member States whose ministries and agencies manage public funded national research activities and programmes in Aeronautics and Air Transport. The results from AirTN in FP6 are prerequisites for the implementation of joint activities to enhance co-operation and coordination of national and regional research programmes. AirTN in FP7 will s ...
Read Project

 25

 FINISHED 
"In the frame of Activity 9.2.1 – Strengthening of Space foundations / Research to support space science and exploration - SPA.2009.2.1.01 Space Exploration, the actions proposed on RASTAS SPEAR project try to enlarge the basic capabilities on few known topics with low Technology Readiness Level and to strengthen European Industry and Research for coming or future Space Exploration missions with f ...
Read Project

 11

 FINISHED 

Small Air Transport - Roadmap (SAT-Rdmp)

Start date: Jan 1, 2011, End date: Mar 31, 2013,

The Small Air Transport (SAT) focuses on the new mode affordable, accessible, energy effective component of Air Transport System. It fills niche between Surface and Scheduled Air Transport.This future SAT system will provide a wide choice of transportation mode - and the wider use of small aircraft, served by small airports, to create access to more communities in less time.The goal of the propos ...
Read Project

 14

 FINISHED 

GReener Aeronautics International Networking (GRAIN)

Start date: Oct 1, 2010, End date: Dec 31, 2012,

"Aerochina1&2 have been networking projects co-funded by FP7 and AVIC (China) and coordinated by CIMNE. Many of the GRAIN partners have participated in them. These collaborative projects gathered experts on the two Europe (13) and China (17) sides to foster cooperation and debate future trends in the field of integrated multi physics modeling, computer simulations and code validation, experimental ...
Read Project

 18

 FINISHED 

Observatory Platform Technological and Institutional (OPTI)

Start date: Jan 1, 2011, End date: Nov 30, 2012,

"The monitoring of the implementation of the Strategic Research Agenda developed by the Advisory Council of Aeronautics Research in Europe to reach the 2020 goals is paramount to evaluate the progress, identify gaps, and inform the Air Transport Community of the state of progress.In this context, technical goals and institutional enablers were identified as key areas to address to be able to reach ...
Read Project

 3

 FINISHED 
"The PPlane project is a direct follow up study to Out-of-the-Box project that aimed to identify potential new concepts and technologies for future air transport and focused on a number of radical changes to the system rather than taking incremental steps.As a result of the Out-of-the-Box project, PPlane implements a systematic approach to radical and novel ideas for Personal Air Transport System ...
Read Project

 13

 FINISHED 
‘Raising European Students Awareness in Aeronautical Research Through School-Labs’ is the main objective of the project REStARTS. The objective of the project is to contribute in reversing the current trend of disinterest of young people towards aeronautics. In this project, the partners of the aeronautical research and training institutes develop informative material about current research topics ...
Read Project

 5