Search for European Projects

39 European Projects Found

Searched on 125080 European Projects

 FINISHED 

DEEP Extended Reach (DEEP-ER)

Start date: Oct 1, 2013, End date: Mar 31, 2017,

The proposed project DEEP-ER (DEEP-Extended Reach) addresses two significant Exascale challenges: the growing gap between I/O bandwidth and compute speed, and the need to significantly improve system resiliency. DEEP-ER will extend the Cluster-Booster architecture of the Dynamical Exascale Entry Platform (DEEP) project by a highly scalable I/O system and will implement an efficient mechanism to re ...
Read Project

 17

 FINISHED 
As our societies are affected by a dramatic demographic change, in the near future elderly and people requiring support in their daily life will increase and caregivers will not be enough to assist and support them. Socially interactive robots can help to confront this situation not only by physically assisting people but also functioning as a companion. The increasing sales figures of robots are ...
Read Project

 8

 FINISHED 
Videogames are one of the most relevant creative industries in Europe - encompassing almost 100,000 individuals – with countries like UK, France and Finland representing the excellence in game development internationally. The market is very interesting, but very competitive too, with an increasing demand of games that are bigger, better and with more realistic computer graphics.Such qualitative a ...
Read Project

 7

 FINISHED 

Adjoint-based optimisation of industrial and unsteady flows (AboutFlow)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

Adjoint-based methods have become the most interesting approach in CFD optimisation due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are members of the EC FP7 project FlowHead which develops ...
Read Project

 9

 FINISHED 

A Coherent and Rich PaaS with a Common Programming Model (CoherentPaaS)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Cloud data management, Big Data and the Internet of Things raise specific challenges with respect to scalable data management, both in real-time and offline. Big Data analytics puts the emphasis on large queries over big cloud data stores. The emerging Internet of Things applications also raise specific challenges with respect to real-time data management. Developing cloud applications at large s ...
Read Project

 13

 FINISHED 
Virtual prototyping (VP) is a key technology for environmental friendly and cost effective design in the aircraft industry. However, the underlying analysis and simulation tools (for loads, stresses, emissions, noise), are currently applied with a unique set of input data and model variables, although realistic operating conditions are a superposition of numerous uncertainties under which the indu ...
Read Project

 22

 FINISHED 

The Human Brain Project (HBP)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Read Project

 116

 FINISHED 

Federation for FIRE (Fed4FIRE)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Read Project

 43

 FINISHED 

Retina-inspired ENcoding for advanced VISION tasks (RENVISION)

Start date: Mar 1, 2013, End date: Aug 31, 2016,

The retina is a sophisticated distributed processing unit of the central nervous system encoding visual stimuli in a highly parallel, adaptive and computationally efficient way. Recent studies show that rather than being a simple spatiotemporal filter that encodes visual information, the retina performs sophisticated non-linear computations extracting specific spatio-temporal stimulus features in ...
Read Project

 4

 FINISHED 

EXascale Algorithms and Advanced Computational Techniques (EXA2CT)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

Numerical simulation is a crucial part of science and industry in Europe. The advancement of simulation as a discipline relies on increasingly compute intensive models that require more computational resources to run. This is the driver for the evolution to exascale. Due to limits in the increase in single processor performance, exascale machines will rely on massive parallelism on and off chip, w ...
Read Project

 10

 FINISHED 
Through the DRONIC project, the consortium will showcase a new, innovative blue-green algae (cyanobacteria) monitoring and treatment robotic system, that can localize hotpots of blue-green algae blooms and only treats the part of the lake which is experiencing blue-green algae bloom. Because of the direct and localized treatment, the system is environmentally friendly, with a minimal impact on the ...
Read Project

 11

 FINISHED 

Environmentally sustainable data centres for Smart Cities (DC4Cities)

Start date: Sep 1, 2013, End date: Feb 29, 2016,

Data centres are involved play two different and complementary roles in Smart Cities' energy policies with two roles: as ICT infrastructures supporting Smart City resource optimization systems - and more in general, delivering for ICT services to the citizens - and as large energy consumers. Therefore there are huge expectations on data centres being able to run at the highest levels of renewable ...
Read Project

 14

 FINISHED 
Description Dem@Care aspires to contribute to the timely diagnosis, assessment, maintenance and promotion of self-independence of people with dementia, by deepening the understanding of how the disease affects their everyday life and behaviourIt implements a multi-parametric closed-loop remote management solution that affords adaptive feedba ...
Read Project

 13

 FINISHED 
Description Many real world systems possess a rich multi-level structure and exhibit complex dynamics that are the result of a web of interwoven interactions among elements with autonomous decision-making capabilities. CONGAS will develop new mathematical models and tools, rooted in game theory, for the analysis, prediction and control of dy ...
Read Project

 8

 FINISHED 
The BrainScaleS project aims at understanding function and interaction of multiple spatial and temporal scales in brain information processing. The fundamentally new approach of BrainScaelS lies in the in-vivo biological experimentation and computational analysis. Spatial scales range from individual neurons over larger neuron populations to entire functional brain areas. Temporal scales range fro ...
Read Project

 17

 FINISHED 
The CableBOT project deals with a novel methodology for designing, developing and evaluating cable robots customised for the automation in large-scale auxiliary processes. Parallel cable robots extend the payloads and workspace of conventional industrial robots by more than two orders of magnitude.The main objective is to develop a new generation of modular and reconfigurable robots able to perfor ...
Read Project

 8

 FINISHED 
The project aims at significant improvement of the interoperability of computational tools for the design, analysis and optimization of functional products. An isogeometric approach is applied for selected manufacturing application areas (cars, trains, aircraft) and for computer-aided machining. Computer Aided Design and numerical simulation algorithms are vital technologies in modern product deve ...
Read Project

 10

 FINISHED 

OpenLab: extending FIRE testbeds and tools (OpenLab)

Start date: Sep 1, 2011, End date: Jun 30, 2014,

Experimentally-driven research is key to success in exploring the possible futures of the Internet. An open, general-purpose, shared experimental facility, both large-scale and sustainable, is essential for European industry and academia to innovate today and assess the performance of their solutions. OpenLab brings together the essential ingredients for such a facility. We extend early prototypes ...
Read Project

 31

 FINISHED 

Experimental UpdateLess Evolutive Routing (EULER)

Start date: Oct 1, 2010, End date: Jun 30, 2014,

The main objective of the EULER exploratory research project is to investigate new routing paradigms so as to design, develop, and validate experimentally a distributed and dynamic routing scheme suitable for the future Internet and its evolution. The resulting routing scheme(s) is/are intended to address the fundamental limits of current stretch-1 shortest-path routing in terms of routing table s ...
Read Project

 9

 FINISHED 

Security UPgrade for PORTs (SUPPORT)

Start date: Jul 1, 2010, End date: Jun 30, 2014,

"Port security remains of paramount importance for Europe both due to potential threats on passenger life and the potential for crippling economic damage arising from intentional unlawful attacks on port facilities. Challenges arise due to the complexity of operational modalities of sea and hinterland traffic and the lack of efficient organisational and technological interfaces linking ports to bo ...
Read Project

 22

 FINISHED 
"The PRESTO project aims at improving test-based embedded systems development and validation, while considering the constraints of industrial development processes. This project is based on the integration of (a) test traces exploitation (generated by test execution in the software integration phase induced by the industrial development process, to validate the requirements of the system) along wi ...
Read Project

 15

 FINISHED 
"Reynolds stress is the most important quantity affecting the mean flow as it is responsible for a major part of the momentum transfer in the wall bounded turbulent flow. It has a direct relevance to both skin friction and flow separation. Manipulation of the Reynolds stress can directly lead to changes in the viscous stress at the wall so as to effectively control the flow for effective flow cont ...
Read Project

 19

 FINISHED 

From single neurons to visual perception (NERVI)

Start date: Jan 1, 2009, End date: Dec 31, 2013,

"We propose to develop a formal model of information representation and processing in the part of the neocortex that is mostly concerned with visual information. This model will open new horizons in a well-principled way in the fields of artificial and biological vision as well as in computational neuroscience. Specifically the goal is to develop a universally accepted formal framework for describ ...
Read Project

 2

 FINISHED 

Computational Geometric Learning (CG Learning)

Start date: Nov 1, 2010, End date: Oct 31, 2013,

High dimensional geometric data are ubiquitous in science and engineering, and thus processing and analyzing them is a core task in these disciplines. The Computational Geometric Learning project (CG Learning) aims at extending the success story of geometric algorithms with guarantees, as achieved in the CGAL library and the related EU funded research projects, to spaces of high dimensions. This ...
Read Project

 8

 FINISHED 
The goal of PLAY is to develop and validate an elastic and reliable federated SOA architecture for dynamic and complex, event-driven interaction in large highly distributed and heterogeneous service systems. Such architecture will enable exchange of contextual information between heterogeneous services, providing the possibilities to optimize/personalize the execution of them, resulting in the so ...
Read Project

 9

 FINISHED 
FACETS-ITN is a research and training network involving partners from 11 universities and research centres, 3 industrial companies and 1 semi-industrial research centre from 6 European countries. It combines competencies in neurobiology, computational neuroscience, information science, physics and electrical engineering. The scientific goal is to experimentally and theoretically explore the struct ...
Read Project

 15

 FINISHED 

Formalisation of Mathematics (FORMATH)

Start date: Mar 1, 2010, End date: Jul 31, 2013,

We propose to developed libraries of formalized mathematics concerning linear algebra, real number computation, and algebraic topology. The main originality of this work will be to structure these libraries as a software development, relying on a basis that has already shown its power in the formal proof of the four color theorem, and to address topics that were mostly left untouched by previous r ...
Read Project

 4

 FINISHED 

Experiential Living Lab for the Internet Of Things (ELLIOT)

Start date: Sep 1, 2010, End date: Jun 30, 2013,

The ELLIOT project aims to develop an Internet Of Things (IOT) experiential platform where users/citizens are directly involved in co-creating, exploring and experimenting new ideas, concepts and technological artefacts related to IOT applications and services. ELLIOT will allow studying the potential impact of IOT and the Future Internet in the context of the Open User Centred Innovation paradigm ...
Read Project

 13

 FINISHED 

Virtual Physiological Human Network of Excellence (VPH NoE)

Start date: Jun 1, 2008, End date: May 31, 2013,

Description The Virtual Physiological Human Network of Excellence (VPH NoE), 2008-2013, served as a rallying point and source of best-practice information for the VPH community.  This role has now has been passed to the VPH Institute (http://www.vph-institute.org/).  The tools and educational/outreach materials developed by the VPH NoE – and ...
Read Project

 23

 FINISHED 

Networking innovations Over Virtualized Infrastructures (NOVI)

Start date: Sep 1, 2010, End date: Feb 28, 2013,

NOVI (Networking innovations Over Virtualized Infrastructures) research concentrates on efficient approaches to compose virtualized e-Infrastructures towards a holistic Future Internet (FI) cloud service. Resources belonging to various levels, i.e. networking, storage and processing are in principle managed by separate yet interworking providers. NOVI will concentrate on methods, information syste ...
Read Project

 13

 FINISHED 

TEstbed for Future Internet Services (TEFIS)

Start date: Jun 1, 2010, End date: Feb 28, 2013,

The flourishing of user driven demand, the heterogeneity of networks, the multiplicity of new devices, all mean that the Internet as we know it is reaching a saturation point. One of the main challenges of Future Internet research is to address the surge in complexity that service and network developers are facing.Building on top of the on-going actions to support large-scale experimentation for F ...
Read Project

 19

 FINISHED 
Cardiovascular disease (CVD) has a significant impact on the European society in terms of mortality, morbidity and allied healthcare costs. The opportunity of multi-scale modelling spanning, sub-cellular level up to whole heart is to improve CVD outcomes by providing a consistent, biophysically-based framework for the integration of the huge amount of fragmented and inhomogeneous data currently av ...
Read Project

 21

 FINISHED 
"Tensors play a wide role in numerous application areas as Signal Processing for Telecommunications, Arithmetic Complexity or Data Analysis. In some applications tensors may be completely symmetric, or symmetric only in some modes, or may not be symmetric. In most of these applications, the decomposition of a tensor into a sum of rank-1 terms is relevant, since tensors of interest have a reduced r ...
Read Project

 1

 FINISHED 
The over-all objective of the FIREBALL project is to coordinate and align methodologies and approaches in the domains of Future Internet (FI) research and experimentation testbeds and user driven open innovation towards successful innovation in "smart city" environments.In doing so, and in covering the whole FI research and innovation value chain driven by smart cities being the users of the FI, F ...
Read Project

 17

 FINISHED 
"This project focuses on computational tools for the optimized design of functional free-form surfaces. Specific applications are ship hulls and propellers in naval engineering and car components, frames, and turbochargers in the automotive and railway transportation industries. The functionality of these products depends on the shape of the surfaces, and even small variations may have significant ...
Read Project

 10

 FINISHED 

Co-advising PhD for IT Research In the Mediterranean region (COADVISE)

Start date: Feb 1, 2009, End date: Jan 31, 2012,

"The project aims to support and strengthen the different existing collaboration actions between Europe and Mediterranean Partner Countries (MCP) for research and research training in the field of Information and Communication Technologies through the staff exchange opportunities offered by IRSES. The structuring action of the programme consists in co-advising PhD students between the two sides of ...
Read Project

 2

 FINISHED 

Experimental COgnitive Distributed Engine (ECODE)

Start date: Sep 1, 2008, End date: Dec 31, 2011,

The aim of the ECODE proposal is to develop, implement and validate experimentally a cognitive routing system. This system will use cognitive techniques to provide a routing system able to meet the future Internet challenges. The project gathers networking and machine learning experts to address these challenges efficiently. In architectural phase one, the cognitive routing system is designed and ...
Read Project

 8

 FINISHED 
In 2006, over 45.000 European citizens died of cirrhosis of the liver and 44,000 additional citizens of liver cancer, knowing that the same year 48,700 new liver cancer cases were declared. Surgical procedures remain the options that offer the foremost success rate against such pathologies. Regretfully, surgery is not so frequent due to several limitations. Indeed, eligibility for liver surgery is ...
Read Project

 16

 FINISHED 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Read Project

 30