Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 
Global warming resulting from the emission of greenhouse gases has received widespread attention with international action from governments and industries, including a number of collaborative programs, such as SET-Plan, and very recently the International Climate Change hold 2015 in Paris. Key European Commission roadmaps towards 2030 and 2050 have identified Carbon Capture and Storage (CCS) as a ...
Read Project

 10

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 

Compact High pErformance QUantum cascadE laseR Sensors (CHEQUERS)

Start date: Mar 1, 2015, End date: Aug 31, 2018,

In this proposal we describe a timely and disruptive solution to the long-standing and vexing problem of the rapid stand-off detection of explosive, toxic or otherwise hazardous materials which are present within potential- or post-terrorist attack or industrial accident sites. We will achieve this by realising highly sensitive, state-of-the-art handheld and tripod-mounted instruments based upon a ...
Read Project

 6

 FINISHED 
Chronic cancer treatment places new demands on patients and families to manage their own care. The iManageCancer project will support this challenge and provide a cancer disease self-management platform designed according to the specific needs of patient groups and focusing on the wellbeing of the cancer patient with special emphasis on psycho-emotional evaluation and self-motivated goals. The pla ...
Read Project

 11

 FINISHED 
The ECOCHAMPS project addresses topic GV-4-2014, Hybrid Light and Heavy Duty Vehicles. The work will, in a single coordinated project, address all aspects of this topic and will be conducted by 26 partners representing the European automotive industry (OEMs (EUCAR), suppliers (CLEPA), ESPs and universities (EARPA)) including members of ERTRAC and EGVIA. The objective is to achieve efficient, compa ...
Read Project

 28

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
The ECO-SEE project aims to develop new eco-materials and components for the purpose of creating both healthier and more energy efficient buildings. We will create and symbiotically use natural eco-materials for healthier indoor environments through hygrothermal (heat and moisture) regulation and the removal airborne contaminants through both chemical capture and photocatalysis. Our objectives inc ...
Read Project

 19

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
...um brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Chalmers and Dresden), measurement equipment vendors (Keysight Technologies, Rohde & Schwarz) and one SME (Qamcom). To ...
Read Project

 19

 FINISHED 
Indoor Air Quality and emissions from building materials have been over the last decades a major challenge for scientists, industry and consumers. Traditional construction materials contribute to contaminants such as VOCs, formaldehyde, particulates and fibres. However, new eco-innovative building materials are able to provide a healthier indoor environment both by substituting source of contamina ...
Read Project

 22

 FINISHED 

European Bank for induced pluripotent Stem Cells (EBISC)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

...nd will undertake cell expansion, QC and characterisation. The European Cell Culture Collection (ECACC) of Public Health England (Department of Health, UK) will coordinate cell line distribution. The Fraunhofer IBMT (Saarbrücken, Germany) will provide comprehensive operational back up. EBiSC’s capacity will be 10,000 cell lines; it will eventually process over 1,000 lines in annual sales. In a p ...
Read Project

 30

 FINISHED 
"Particulate materials, e.g. pharmaceutical formulations, precious metal, fine chemical, metal & ceramic powders, have been compacted to produce a wide range of particulate products in a number of industrial sectors. The diversity of particulate materials and the complexity of manufacturing processes make it a challenging task in product development and process design for particulate product manuf ...
Read Project

 10

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
BioConSepT aims to demonstrate the technically feasibility of White Biotech processes for the conversion of 2nd generation biomass into platform chemicals, which are 30% cheaper and 30% more sustainable than existing chemical routes or 1st generation processes. BioConSepT uses lignocellulose and non-edible oils & fats as cheap, abundantly available feedstocks, which cannot be used as food. The ma ...
Read Project

 38

 FINISHED 
"While early detection of breast cancer by screening appears effective, many women derive little or no benefit from screening, due to the way it is currently organized: as a one-size-fits all approach irrespective of personalised risk factors. It is known, however, that some women are at a much higher risk of getting the disease than others, and that mammography is unsuitable for cancer detection ...
Read Project

 10

 FINISHED 
There is a strong pull for practical ultrafast laser sources from a magnitude of applications and associated markets. These applications often demand systems with high reliability and maintenance-/alignment-free operation while at the same time, be highly adaptable to cater the numerous requirements imposed by the specific application. One of the key issues that prevent state-of-the-art ultrafast ...
Read Project

 6

 FINISHED 
Natural gas may be liquefied at -160oC thereby reducing its volume and providing an economic means for its transportation. Liquefied natural gas (LNG) enables gas markets to be connected with more distant export sources thereby improving market competitiveness and stability. Effective thermal insulation is critical to energy management throughout the LNG value chain, impacting on competitiveness a ...
Read Project

 7

 FINISHED 
RationaleThe inability of pre-clinical studies to predict clinical efficacy is a major bottleneck in drug development. In severe asthma this bottleneck results from: a lack of useful and validated biomarkers, underperforming pre-clinical models, inadequate and incomplete sub-phenotyping, and insufficient disease understanding.HypothesisThe use of biomarker profiles comprised of various types of hi ...
Read Project

 42

 FINISHED 
The research necessary to extend the application areas of femtosecond frequency combs through the development of compact, robust, low-cost, commercially-exploitable sources is now possible; taking advantage of the fact that ultrafast laser pulses of femtosecond widths, separated by nanoseconds, manifest themselves as a phase-coherent comb of frequencies spread over a wide spectral band. Furthermor ...
Read Project

 8

 FINISHED 
Description EURECA (Enabling information re-Use by linking clinical REsearch and Care) aims to enable seamless, secure, scalable and consistent linkage of healthcare information, which resides in electronic health record (EHR) systems with information in clinical research information systems, such as clinical trials. Achieving semantic inter ...
Read Project

 20

 FINISHED 

VARiability In safety critical Embedded Systems (VARIES)

Start date: May 1, 2012, End date: Apr 30, 2015,

"In order to succeed or even to survive, manufacturers and system integrators must be able to deliver new products with speed, diversity, high quality, and at an acceptable cost.Embedded Systems (ES) are rarely entirely conceived from scratch. Companies developing ES constantly face decisions about using and adapting existing products or product assets versus new developments. Determining the long ...
Read Project

 29

 FINISHED 
Internet-connected objects will be an integral component of the future internet. Therefore, they must become integrated into emerging internet service delivery models, such utility and cloud computing. Indeed, the proliferation of applications involving internet-connected objects, has recently given rise to the notion of clouds of internet-connected objects, which are promoted as large-scale netwo ...
Read Project

 9

 FINISHED 
In all industrial sectors, Non Destructive Evaluation techniques play a critical role for ensuring structures reliability, plant safety and increasingly also for ensuring quality and efficiency of products and processes. The emerging use of numerical simulation is a major trend in the field with tremendous potential benefits in terms of costs reduction, enhanced diagnosis reliability and consequen ...
Read Project

 20

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Oxide Materials Towards a Matured Post-silicon Electronics Era (Orama)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

Orama is on the development of new high performance multifunctional oxide based electronic materials, processable at low temperatures, including flexible substrates that have the potential to catapult the electronics industry into a new era of growth. Orama will develop, analyze and utilize these new materials and techniques to investigate into device concepts highlighting the potential of oxides ...
Read Project

 18

 FINISHED 
NANOINSULATE will develop durable, robust, cost-effective opaque and transparent vacuum insulation panels (VIPs) incorporating new nanotechnology-based core materials (nanofoams, aerogels, aerogel composites) and high-barrier films that are up to four times more energy efficient than current solutions. These new systems will provide product lifetimes in excess of 50 years suitable for a variety o ...
Read Project

 11

 FINISHED 

Extended Non-Destructive Testing of Composite Bonds (ENCOMB)

Start date: Nov 1, 2010, End date: Apr 30, 2014,

"Even though composite materials are already used in the manufacturing of structural components in aeronautics industry a consequent light-weight design of CFRP primary structures is limited due to a lack of adequate joining technologies. In general, adhesive bonding is the optimum technique for joining CFRP light-weight structures, but difficulties in assessing the bond quality by non-destructive ...
Read Project

 15

 FINISHED 

Building service testbeds on FIRE (BonFIRE)

Start date: Jun 1, 2010, End date: Dec 31, 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Read Project

 26

 FINISHED 
By 2020, the EC aim to increase our overall renewable energy capacity from 8.5% to 20% as a proportion of Europe’s total energy demand. Considering that domestic heating and hot water provision accounts for nearly 40% of total energy demand it is clearly desirable to increase market penetration of renewable heating systems. On a domestic scale solar thermal systems are increasingly common and are, ...
Read Project

 11

 FINISHED 

Optimized Infrastructure Services (OPTIMIS)

Start date: Jun 1, 2010, End date: May 31, 2013,

With the challenges of service and infrastructure providers as the point of departure, OPTIMIS focuses on open, scalable and dependable service platforms and architectures that allow flexible and dynamic provision of advanced services.The OPTIMIS innovations can be summarized as a combination of technologies to create a dependable ecosystem of providers and consumers that will be the foundation of ...
Read Project

 16

 FINISHED 

Integrated Mobile Security Kit (IMSK)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Read Project

 29

 FINISHED 
EU farmers face significant costs related to the management and disposal of on-farm organic waste arisings such as manures and slurries through having to comply with specific EU legislation such as the Nitrates Directive and the Landfill Directive. Rising waste disposal costs have been cited as a contributing factor to the estimated closure of 7,000 EU farms per annum. Our consortium consists of f ...
Read Project

 7

 FINISHED 

Anaglyptic Refreshable Photo-Haptic Screen (Anagraphs)

Start date: Jan 1, 2011, End date: Dec 31, 2012,

The scientific and technological developments in the present research project will be to make possible the manufacture of an anaglyptic or tactile display that can be connected to a personal computer or used in stand-alone mode as a Braille e-book reader. The display may be read either by touch or indeed by sight, since the tactile dots will also be illuminated when active. This feature will be of ...
Read Project

 6

 FINISHED 

Highly Flexible Printed ITO-free OPV Modules (HIFLEX)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

HIFLEX aims to develop a cost-effective Highly Flexible Printed ITO-free OPV module technology that matches the particular requirements of mobile and remote ICT applications in terms of efficiency under different light conditions, lifetime, cost structure, power to weight ratio and mechanical flexibility. The project intends to accelerate the exploitation of this OPV technology for a wide variety ...
Read Project

 7

 FINISHED 
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 mill ...
Read Project

 13

 FINISHED 
IMPALA will develop flexible and efficient Rapid Manufacturing processes of custom parts or small batches. SME end users will be at the forefront of this project, helping them increase their annual turnover by 20-50%, by producing a diversified range of high value components. Currently, manufacturing custom products such as artificial teeth can take several days or weeks and is very expensive. Thi ...
Read Project

 16

 FINISHED 
The ÆGIS project seeks to determine whether 3rd generation access techniques will provide a more accessible, more exploitable and deeply embeddable approach in mainstream ICT (desktop, rich Internet and mobile applications). We develop and explore this approach with the Open Accessibility Framework (OAF) through which we address aspects of the design, development and deployment of accessible mains ...
Read Project

 25

 FINISHED 
Our idea is to develop microwave technology which will reduce drying times in buildings after flooding events. A single Microdry unit will run off mains electricity be capable of drying a room in just 10% of the time taken by current technologies. We will develop an intelligent control system that will measure the reflected microwaves to determine residual moisture content and adjust the power out ...
Read Project

 8