Search for European Projects

3 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Advanced FOrging of an Optimized Turbine casing (AFOOT)

Start date: Oct 1, 2013, End date: Apr 30, 2016,

The objective of this project is to determine and validate a robust set of forging and heat treatment parameters leading to the forging of a fan case for a geared turbofan demonstrator as part of the Sustainable and Green Engine (SAGE) platform by making the microstructure of ATI 718Plus stable against overaging effects occurring during long-term exposure at 700°C.This project represents the colla ...
Read Project

 2

 FINISHED 

Greater Operating Temperature Alloy (GOTA)

Start date: Oct 1, 2012, End date: Apr 30, 2016,

...ad the review of literature and prior industrial work. A candidate alloy (Ti+) will be selected based on this review, and on commercial and industrial factors.• TIMET will supply Ti+ billets to Forgital Italy S.p.A. which will manufacture, heat treat, and sample rolled rings.• TIMET will supply Ti+ casting stock to Deritend International, which will manufacture stepped section cast samples by both ...
Read Project

 4

 FINISHED 

Rolled-Only IN718 Ring-shaped Components (RORC)

Start date: Mar 1, 2013, End date: Feb 29, 2016,

The objective of this proposal is to develop and validate a robust and reliable ring-rolling-only route for manufacturing IN718 alloy near-net-shaped rotating aero-engine disk components, RORC (e.g., low-pressure turbine disks). The material and mechanical response of the RORC must comply with the current microstructural and mechanical requirements demanded for close-die forged disks with an econo ...
Read Project

 2