Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 ONGOING 

SEMMERING RAILWAY BASE TUNNEL

End date: Dec 30, 2024,

Aim: Projects part of proposed Core Network and Baltic Adriatic Core Network corridorConstruction of two tube base tunnel
Read Project

 1

 FINISHED 
...and Belgium on the other. Between the Odra River and German, Dutch and Flemish ports, it also includes inland waterways, such as the "Mittelland-Kanal". The most important project is "Rail Baltic", a European standard gauge railway between Tallinn, Riga, Kaunas and North-Eastern Poland. ...
Read Project

 1

 FINISHED 

VIENNA MAIN RAILWAY STATION

End date: Dec 30, 2015,

Aim: Projects part of PP17, PP 23 (core Network corridor Strasbourg – Danube, Baltic Adriatic, Hamburg Levkosia) Construction of new railway station as a key node between TEN-T corridors
Read Project

 1

 FINISHED 
The Scandinavian-Mediterranean Corridor is a crucial north-south axis for the European economy. Crossing the Baltic Sea from Finland to Sweden and passing through Germany, the Alps and Italy, it links the major urban centres and ports of Scandinavia and Northern Germany to continue to the industrialised high production centres of Southern Germany, Austria and Northern Italy further to the Italian ...
Read Project

 1

 FINISHED 

CONSTRUCTION OF A NEW BRIDGE OVER THE DANUBE RIVER AT VIDIN – CALAFAT

Start date: Dec 31, 2006, End date: Dec 30, 2012,

Aim:Part of the TEN-T Priority Project 22 (Pan-European transport corridor K 4).The Project includes design and construction of a combined (road and rail) bridge with 4 road lanes and a single-track railway line plus bicycle lane.
Read Project

 1

 FINISHED 

KORALM RAILWAY LINE

Start date: Dec 31, 2006,

Aim: Projects part of proposed Core Network and Baltic Adriatic Core Network corridorConstruction of new high speed railway line between Graz and Klagenfurt
Read Project

 1

 FINISHED 
Priority Project 22 (rail): from Nurnberg / Dresden to Constanta and Athens via Prague, Vienna, Budapest and Arad through the whole region (according to the Decision No 884/2004/EC of the European Parliament and of the Council amending Decision No trans-European transport network).The Priority Project 22 on the Romanian territory has a length of 80 km for the North Branch (to Constanta) and is spl ...
Read Project

 1

 FINISHED 
Aim: Projects part of PP17 (core Network corridor Strassbourg– Danube)Construction of a new high speed line between Vienna, Main Railway station and St. Poelten including Lainzertunnel and Wienerwaldtunnel
Read Project

 1