Search for European Projects

28 European Projects Found

Searched on 125080 European Projects

 FINISHED 
INNOQUA will accelerate the path to market of a modular set of innovative, patent protected, award winning and scalable fully ecological sanitation solutions that address wide market needs in rural communities, for agricultural industries, for sustainable home-builders or collective housing owners and for developing countries worldwide. The modular system is based on the purification capacity of b ...
Read Project

 20

 FINISHED 

Analysis System for Gathered Raw Data (ASGARD)

Start date: Sep 1, 2016, End date: Feb 29, 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Read Project

 34

 FINISHED 

European Gram Negative Antibacterial Engine (ENABLE)

Start date: Feb 1, 2014, End date: Jan 31, 2020,

The intensive use and misuse of antibiotics has resulted in some level of antibiotic resistance in essentially all human bacterial pathogens. There is a growing concern that the loss of therapeutic options will present us with a post-antibiotic era where present and future medical advances are negated. Resistant bacteria dramatically reduce the possibilities of treating infections effectively, a ...
Read Project

 42

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
SIMUTOOL will develop a simulation platform for the manufacturing of composites through microwave MW heating. The simulation will include the electromagnetic field coupled with heat transfer mechanisms that take place during the production process. It will also include the process control loop which will enable the optimum design of the manufacturing process.One of the major outputs of the simulat ...
Read Project

 9

 FINISHED 

SMILE - SMall Innovative Launcher for Europe (SMILE)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

... technical operational and economical perspectiveThese objectives are achieved through combined research into a novel and innovative launcher system following a multidisciplinary concurrent engineering design and optimization approach. The overall design and development process encompasses technology and process advances aiming at cost reduction, such as series production, re-usability, and the ap ...
Read Project

 14

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 

Product-Service sYMBIOtic SYStems (PSYMBIOSYS)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

...e intangible, risky, service-oriented and Internet-based businesses?PSYMBIOSYS aims at improving the competitiveness of European Manufacturing industries by developing an innovative product-service engineering environment, symbolized by a five-pointed symbiosis star – design-production, product-service, knowledge-sentiment, EDA-SOA, business-innovation – and able to dramatically reduce the time-to ...
Read Project

 13

 FINISHED 
FABRIC addresses directly the technological feasibility, economic viability and socio-environmental of dynamic on-road charging of electric vehicles.FABRIC responds to the need to assess the potential and feasibility of a more extensive integration of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of th ...
Read Project

 27

 FINISHED 

REsettable Hold-Down and Release ACTuator (REACT)

Start date: Jan 1, 2015, End date: Oct 31, 2017,

Unrestricted access to Space low shock non-explosive actuators has been identified as an urgent action by the European Commission, the European Space Agency and the European Defence Agency. Project REACT proposal is oriented to permit the unrestricted access of Europe to the technology of high reliable non-explosive actuators based on SMA (Shape Memory Alloy) technology. The REACT (REsettable Hold ...
Read Project

 8

 FINISHED 
Despite recent evolutions of tools/practices in the Architecture Engineering, Construction and Facility Management have already resulted in considerable advances, some limitations remain, related to the complexity and variability of building life cycles, addressing building end user awareness and participation, lack of new business models, life cycle fragmentation, limited interoperability of the ...
Read Project

 21

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
CITI-SENSE will develop “citizens’ observatories” to empower citizens to contribute to and participate in environmental governance, to enable them to support and influence community and societal priorities and associated decision making. CITI-SENSE will develop, test, demonstrate and validate a community-based environmental monitoring and information system using innovative and novel Earth Observa ...
Read Project

 32

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 

Protection Measures for Merchant Ships (PROMERC)

Start date: Mar 1, 2014, End date: May 31, 2016,

There is a bewildering array of ongoing actions in the field of countering pirate assaults and there are a large number of options available to shipping companies to mitigate the risk of piracy and to deter pirates. However there is scant information regarding their operational effectiveness or the cost benefits of their use, particularly when employed in combination as part of a holistic approach ...
Read Project

 10

 FINISHED 

DEvelopment platform for Safe and Efficient dRiVE (DESERVE)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

According to a recent forecast published by ABI Research , a fast growth of the market of Advanced Driving Assistance Systems (ADAS) is foreseen in the next five years. For example, in 2016 the overall annual market for Lane Departure Warning systems is expected to reach 22 million units/year (corresponding to 14,3 billion dollars). This market growth will be possible only through the reduction of ...
Read Project

 28

 FINISHED 

Future Internet Technologies for MANufacturing (FITMAN)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

According to the 2010 EC Competitiveness Report, Manufacturing is still the driving force of Europe's economy, contributing over € 6553 billion in GDP and providing more than 30 million jobs. It covers more than 25 different industrial sectors, largely dominated by SMEs, and generates annually over € 1535 billion (42%) worth of value added services.The mission of the FITMAN (Future Internet Techno ...
Read Project

 41

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
"Aircraft structures appear to be strategic components to be manufactured in composite materials for reducing weight, although new questions regarding electrical conductivity have arisen such as static discharge, electrical bonding and grounding, interference shielding and current return through the structure.These functions can be met by the use of technologies based on nanocomposites, which inde ...
Read Project

 14

 FINISHED 
"Today’s design and certification procedures of aircrafts are mainly based on conservative static loading which leads to additional weight and, potentially, to a structurally unsafe aircraft. The overall objective of the DAEDALOS project is to develop methods and procedures to determine dynamical loads considering the effects of dynamic buckling, material damping and mechanical hysteresis during a ...
Read Project

 13

 FINISHED 

Designing Dynamic Distributed Cooperative Human-Machine Systems (D3CoS)

Start date: Mar 1, 2011, End date: Feb 28, 2014,

Transportation based on cars, aircraft and ships is a key factor for modern human societies. Human operators have historically been in charge of the two main facets of transportation: vehicle control and traffic control. Technological innovations have progressively allowed the introduction of advanced automated assistance systems leading to a complex interplay of humans and automation which has be ...
Read Project

 24

 FINISHED 
The project addresses from one site the most critical and costly step to produce liquid fuel from natural gas using conventional routes, e.g. the stage of syngas production, and from the other side explores alternative routes to convert natural gas to liquid transportable products. The general objective is to explore novel and innovative (precompetitive) routes for transformation of natural gas t ...
Read Project

 25

 FINISHED 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Read Project

 67

 FINISHED 

Future INternet for Smart ENergY (FINSENY)

Start date: Apr 1, 2011, End date: Apr 30, 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Read Project

 41

 FINISHED 

COllaboration and INteroperability for networked enterprises (COIN)

Start date: Jan 1, 2008, End date: Dec 31, 2011,

"By 2020 enterprise collaboration and interoperability services will become an invisible, pervasive and self-adaptive knowledge and business utility at disposal of the European networked enterprises from any industrial sector and domain in order to rapidly set-up, efficiently manage and effectively operate different forms of business collaborations, from the most traditional supply chains to the m ...
Read Project

 28

 FINISHED 
ICT Employee empowerment : A portal and online learning tool are in the process of being refined. They will provide work guidance counselors with the skills to train ICT company employees in personalised career management. This project started in 2003 and lasted 36 months.
Read Project

 18