Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Background The conservation status of the bearded vulture (Gypaetus barbatus) is listed as vulnerable on the European IUCN Red List and endangered in France. Before vulture reintroductions started, the Alps represented a huge barrier separating the Pyreneo-Iberian populations and those of the Balkans. To bridge the distance between the populations of the ...
Read Project

 9

 FINISHED 
mySMARTLife project aims at the development of an Urban Transformation Strategy to support cities in the definition of transition models, as a suitable path to reach high level of excellence in its development process, addressing the main city challenges and progressing to the smart people and smart economy concepts.The main instrument to achieve this very ambitious strategy will be the definition ...
Read Project

 28

 FINISHED 
SMARTER TOGETHER’s overarching vision is to find the right balance between smart technologies and organizational/ governance dimensions in order to deliver smart and inclusive solutions and to improve citizen’s quality of life.SMARTER TOGETHER gather the European Lighthouse cities Lyon, Munich, Vienna, the Follower cities Santiago de Compostela, Sofia, Venice and Kyiv and Yokohama as observer citi ...
Read Project

 30

 FINISHED 
According to the Integrated Roadmap of the Set-plan, and to reach the new EU target of 27% of renewable energies in 2030, there is the need to rapidly expand the use of all renewable energy sources in Europe to accelerate the fight against global climate change. This requires the acceleration of development of new options that are emerging today, particularly, technologies that solve the key issue ...
Read Project

 10

 FINISHED 

Photovoltaic module life time forecast and evaluation (SOLAR-TRAIN)

Start date: Sep 1, 2016, End date: Aug 31, 2020,

The quality assurance in the photovoltaic industry is yet in its infancy, requiring both underpinning science and trained personnel to reduce costs of energy. An unmet industrial requirement is an accelerated, and operating environment specific, service life time and energy yield assessment. SOLAR-TRAIN will qualify ESRs in the field of PV durability as part of a highly innovative, multi-disciplin ...
Read Project

 8

 FINISHED 

Adaptive Management of Barriers in European Rivers (AMBER)

Start date: Jun 1, 2016, End date: May 31, 2020,

Rivers rank among some of the most threatened ecosystems in the world, and are the focus of costly restoration programmes that cost billions to taxpayers. Much of Europe depends on water from rivers for drinking, food production, and the generation of hydropower, which is essential for meeting the EU renewable energy target. Yet only half the EU surface waters have met the WFD’s 2015 target of goo ...
Read Project

 21

 FINISHED 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Read Project

 20

 FINISHED 
Advanced aRchitectures for ultra-thin high-efficiency CIGS solar cells with high Manufacturability (ARCIGS-M)This project´s goal is advanced materials and nanotechnologies for novel CIGS PV device architectures with efficiencies ≥ 23.0 %, thus beyond that of the current state-of-the-art technologies. The technology targets the BIPV sector and enables several innovative solutions for BIPV.The novel ...
Read Project

 15

 FINISHED 
SmILES zooms in simulation and optimisation of smart storage in local energy systems for increasing the understanding and transparency of innovative multi-energy projects. Setting up a shared data and information platform and effective dissemination of related results will contribute to competence building.The objective is to obtain fundamental knowledge about linking and optimising heterogeneous ...
Read Project

 6

 FINISHED 

FAST Nuclear Emergency Tools (FASTNET) (FASTNET)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

When dealing with emergency, two issues with fully different time requirements and operational objectives, and thus different methods and tools, have to be considered: emergency preparedness and emergency response. This project will address both issues by combining the efforts of organizations active in these two areas to make already identified deterministic reference tools and methods a decisive ...
Read Project

 22

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 
MATChING goal is the reduction of cooling water demand in the energy sector through innovative technological solutions, to be demonstrated in thermal and geothermal power plants. The project targets include an overall saving of water withdrawal of 30% in thermal power generation, and a decrease of evaporative losses up to 15% in geothermal sector. The use of advanced and nano-technology based mate ...
Read Project

 17

 FINISHED 
Imagine an inherently safe reactor that produces all electricity world-wide for thousands of years, and recycles all actinides until fission.The Molten Salt Fast Reactor (MSFR) can reach this goal. The cylindrical reactor core contains actinide-fluorides mixed in lithium-fluoride. The liquid salt is at ambient pressure and can freely expand upon heating, giving a strong negative reactivity feedbac ...
Read Project

 11

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring programme, taking into account the requirements of specific national programmes. The work allows advanced national radioactive waste disposal programmes to design monitoring systems suitable for deployment when repositories start operating in the next deca ...
Read Project

 28

 FINISHED 

Competitive SolAr Power Towers – CAPTure (CAPTure)

Start date: May 1, 2015, End date: Apr 30, 2019,

The main objective of this project is to significantly reduce costs of concentrated solar power, in order to pave the way for its deserved competitiveness on the power market. Specifically, the solar-to-electric conversion efficiency of the plant will be improved by increased receiver operating temperatures as well as an innovative power cycle configuration also providing advantages regarding plan ...
Read Project

 16

 FINISHED 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Read Project

 21

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 

High Performance Capture - HiPerCap (HiPerCap)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

This proposal aims to develop high-potential novel and environmentally benign technologies and processes for post-combustion CO2 capture leading to real breakthroughs. The proposal includes all main separation technologies for post-combustion CO2 capture; absorption, adsorption and membranes. Enzyme based systems, bio-mimicking systems and other novel forms of CO2 binding will be explored. For eac ...
Read Project

 17

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 
The objective of eStorage is to develop cost-effective solutions for the widespread deployment of flexible, reliable, GWh-scale storage across EU, and to enhance grid management systems to allow the integration of large share of renewable.The key issue we plan to address is the need for power regulation during low demand periods, when only inflexible baseload generation and intermittent renewable ...
Read Project

 7

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 
PELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, l ...
Read Project

 12

 FINISHED 
FORTRESS will identify and understand cascading effects by using evidence-based information from a range of previous crisis situations, as well as an in-depth analysis of systems and their mutual interconnectivity and (inter-)dependency. FORTRESS will seek to intervene in current crisis response practices by bridging the gap between the over-reliance on unstructured information collection on one s ...
Read Project

 17

 FINISHED 

Code for European Severe Accident Management (CESAM)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Read Project

 21

 FINISHED 
Chemical-looping combustion (CLC) has unique potential for reducing energy and cost penalty for CO2 capture, as it avoids the costly gas separation of other CO2 capture technologies. Early deployment is seen in natural gas steam generation, where gas-to-steam efficiency penalty with CLC is below 1%-point compared to 15%-points with amine scrubbing and 8%-points with oxyfuel combustion, all for 95% ...
Read Project

 17

 FINISHED 
OCTAVIUS aims to demonstrate integrated concepts for zero emission power plants covering all the components needed for power generation as well as CO2 capture and compression.Operability and flexibility of first generation post combustion processes are demonstrated by TNO, EnBW and ENEL pilot plants in order to prepare full scale demo projects such as the ROAD and Porto Tolle projects that will st ...
Read Project

 18

 FINISHED 
CITYOPT mission is to improve sustainability by enabling more energy-efficient built environments. The specific target is to engage users with the new CITYOPT applications, create new partnerships connecting city leaders and stakeholders and create new business models for decision support systems for energy efficient neighbourhoods.The project will create a set of applications and related guideli ...
Read Project

 7

 FINISHED 
Recent advances in our understanding and forecasting of climate and climate change have brought us to the point where skilful and useful predictions are being made. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. Howeve ...
Read Project

 26

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 
With the growing relevance of distributed renewable energy sources (DRES) in the generation mix and the increasingly pro-active demand for electricity, power systems and their mode of operation need to evolve. evolvDSO will define future roles of distribution system operators (DSOs) on the basis of scenarios which will be driven by different DRES penetration levels, various degrees of technologica ...
Read Project

 16

 FINISHED 
"In case of a severe accident in a Nuclear Power Plant (NPP) fission products are released from the degraded fuel and might reach the environment if their confinement is lost and/or bypassed. Given the high radio-toxic nature of fission products for environment and population, their release should be avoided at all costs. This highlights the importance of relying on efficient mitigation systems ca ...
Read Project

 11

 FINISHED 

Dynamic Risk Approaches for Automated Cyber Defence (PANOPTESEC)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

The PANOPTESEC consortium will deliver a beyond-state-of-the-art prototype of a cyber defence decision support system, demonstrating a risk based approach to automated cyber defence that accounts for the dynamic nature of information and communications technologies (ICT) and the constantly evolving capabilities of cyber attackers. "Panoptes" is an ancient Greek term meaning 'all eyes' or 'all see ...
Read Project

 10

 FINISHED 
"The European photovoltaics PV market still represents the predominant share of worldwide installations and electricity generated from PV is becoming increasingly competitive, with an average levelized cost of energy (LCOE) estimated to be between 0.10–0.16 €/kWh in 2011 . This constant reduction of LCOE means that the European industry can only regain its competitiveness with (i) a concomitant re ...
Read Project

 16

 FINISHED 
The science of complex systems distinguishes linear from non-linear dynamics. Simpler systems can often be satisfactory described by linear models, but complex systems require non-linear models that can capture more of the characteristics of such systems, such as thresholds, feedback loops, avalanche effects, and irreversibility. Linear systems can be validated by aligning models to the past and u ...
Read Project

 17

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Read Project

 9

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28