Search for European Projects

17 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
InteGrid’s vision is to bridge the gap between citizens, technology and the other players of the energy system. The project will demonstrate how DSOs may enable all stakeholders to actively participate in the energy market and distribution grid management and develop and implement new business models, making use of new data management and consumer involvement approaches. Moreover, the consortium w ...
Read Project

 15

 FINISHED 
RESCCUE aims to deliver a framework enabling city resilience assessment, planning and management by integrating into software tools new knowledge related to the detailed water-centred modelling of strategic urban services performance into a comprehensive resilience platform. These tools will assess urban resilience from a multisectorial approach, for current and future climate change scenarios and ...
Read Project

 18

 FINISHED 
Critical infrastructure (CI) provides the essential functions and services that support European societal, economic and environmental systems. As both natural and man-made disaster and crises situations become more common place, the need to ensure the resilience of CI so that it is capable of withstanding, adapting and recovering from adverse events is paramount. Moving resilience from a conceptua ...
Read Project

 12

 FINISHED 
Unlike the control and observability put in service in HV/MV, LV networks are still being substantially managed as usual: no visibility of power and voltage or grid components status, poor knowledge of connectivity, manual operation of switches or few tools for worker support. The LV grid characteristics (radial topology, exposition to local disturbances, local accumulation of distributed generati ...
Read Project

 20

 FINISHED 

Security for smart Electricity GRIDs (Segrid)

Start date: Oct 1, 2014, End date: Sep 30, 2017,

SEGRID’s main objective is to enhance the protection of smart grids against cyber-attacks. We do this by applying a risk management analysis approach to a number of smart grid use cases (the SEGRID use cases), which will define security requirements and determine gaps in current security technologies, standards and regulations. The identified gaps and the analysis itself will give input to the enh ...
Read Project

 12

 FINISHED 
...o-economical requirements with necessary adaptation.The proposed energy management platform will be evaluated in realistic scenarios using real world set-ups in Alliander microgrid in Bronsbergen and EDP Smart Grid in Portugal, as well as in emulation.In order to stimulate the exploitation of the results we will provide a guide book and tools for parties interested in using our solution, to help t ...
Read Project

 12

 FINISHED 
With the growing relevance of distributed renewable energy sources (DRES) in the generation mix and the increasingly pro-active demand for electricity, power systems and their mode of operation need to evolve. evolvDSO will define future roles of distribution system operators (DSOs) on the basis of scenarios which will be driven by different DRES penetration levels, various degrees of technologica ...
Read Project

 16

 FINISHED 
At the moment European countries are not obliged to have a (virtual) registry of infrastructures, however public administrations, private or public enterprises and citizens feel the need of knowing how the various infrastructures are placed and managed and which are the relative responsabilities and properties as the lack of a single and common registry generates conflicts of competence between op ...
Read Project

 12

 FINISHED 

Integrative Smart City Planning (INSMART)

Start date: Dec 1, 2013, End date: Nov 30, 2016,

The InSMART concept brings together cities, scientific and industrial organizations in order to establish and implement a comprehensive methodology for enhancing sustainable planning addressing the current and future city energy needs through an integrative and multidisciplinary planning approach. This approach will identify the optimum mix of short, medium and long term measures for a sustainable ...
Read Project

 10

 FINISHED 
The SuSTAINABLE project will develop and demonstrate a new operation paradigm, leveraging information from smart meters and short-term localized predictions to manage distribution systems in a more efficient and cost-effective way, enabling a large-scale deployment of variable distributed resources.The SuSTAINABLE concept is based on the cloud principle, where the distribution system operator i) c ...
Read Project

 9

 FINISHED 
The anticipated mass roll-out of electric vehicles (EVs) in Europe and the continuously increasing number of distributed energy resources (DER) are posing major challenges to Europe’s Distribution System Operators (DSOs) with regard to ensuring a secure and reliable energy supply and network operation. Despite ongoing research and demonstration activities in this field, particularly the developmen ...
Read Project

 12

 FINISHED 

Smart Consumer - Smart Customer – Smart Citizen (S3C)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The overall objective of the S3C project is to foster ‘smart’ energy behaviour of households and SMEs in Europe via active user participation. Strongly linked to European large-scale demonstration projects, the small and flexible consortium follows a human centric approach from social and behavioural sciences. It includes insights from other fields such as telecommunications, and tests different t ...
Read Project

 7

 FINISHED 

STAtionary BAtteries LI-ion safe Deployment (STABALID)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

...on with selected projects financed by METI and NEDO. STABALID project is technically led by a world leading manufacturing company, SAFT, and involves a utility company as representative of end-users, EDP, as well as reference organizations for safety inspection, testing, certification, and for integrated risk management. Thus ,the consortium ambition is to have the new standard adopted during the ...
Read Project

 8

 FINISHED 
The key objective of the EcoGrid EU project is to demonstrate efficient operation of a distribution power system with high penetration of many and variable renewable energy resources. The demonstration will take place on the Danish island Bornholm with more than 50 % of electricity consumption from renewable energy production.A real-time market concept will be developed to give small end-users of ...
Read Project

 17

 FINISHED 
Protecting critical infrastructures providing communications, energy, or healthcare presents increasing ICT challenges as ICT itself has become vital to them. Internet-scale ICT infrastructures ("infrastructure clouds") promise scalable virtualised computing, network, and storage resources over the Internet. They provide scalability and cost-efficiency but pose significant new privacy and resilien ...
Read Project

 16

 FINISHED 
The goal of WSAN4CIP is to substantially advance the technology of Wireless Sensor and Actuator Networks (WSANs) beyond the current state of the art and to apply this technology to the Protection of Critical Infrastructures. In particular, the WSAN4CIP project will apply these advanced wireless and sensor network developments to the management of power generation and distribution infrastructure ma ...
Read Project

 12