Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Laser Lightning Rod (LLR)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Controlling lightning is a long time dream of mankind. The goal of the present project is to investigate and develop a new type of lightning protection based on the use of upward lightning discharges initiated through a high repetition rate multi terawatt laser. The feasibility of the novel technique and the project’s prospect of success are based on recent research providing new insights into the ...
Read Project

 9

 FINISHED 

Lubricant impregnated slippery surfaces (LubISS)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

LubISS, Lubricant Impregnated Slippery Surfaces, is the first European Training Network with the main objectives of designing, characterizing, and modelling low adhesive easy-to-clean surfaces for anti-icing and anti-fouling. In a coordinated effort among 9 world-class academic institutions and industrial partners from 6 European countries (Finland, France, Germany, Great Britain, Netherlands, Swi ...
Read Project

 9

 FINISHED 
Scandium (Sc) is one of the highest valued elements in the periodic table and an element which is usually grouped in REEs as it shares many characteristics with Yttrium. Scandium technological applications are unique, as it is a key component in producing Solid Oxide Fuel Cells (Scandia-Stabilized-Zirconia solid electrolyte layer) or high strength Aluminum alloys used in aerospace and 3D printing ...
Read Project

 20

 FINISHED 
There is an increasing demand for advanced materials with temperature capability in highly corrosive environments for aerospace. Rocket nozzles of solid/hybrid rocket motors must survive harsh thermochemical and mechanical environments produced by high performance solid propellants (2700-3500°C). Thermal protection systems (TPS) for space vehicles flying at Mach 7 must withstand projected service ...
Read Project

 12

 FINISHED 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Start date: Nov 1, 2016, End date: Apr 30, 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Read Project

 14

 FINISHED 
We propose the development of a Very High Performance microprocessor System on Chip (SoC) based on STM European 28nm FDSOI technology with multi-core ARM processors for real-time applications, eFPGA for flexibility and key European IPs, enabling faster and cost-efficient development of products for multiple space application domains. The performance is expected to be 20 to 40 times the performance ...
Read Project

 7

 FINISHED 

Energy for Smart Objects (EnSO)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Read Project

 36

 FINISHED 

Continuous Observation of Embedded Multicore Systems (COEMS)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The ability to observe the internals of an execution of a computer-based system is a fundamental requirement for ultimately ensuring correctness and safe behaviour. Within COEMS (Continuous Observation of Embedded Multicore Systems) a novel observer platform with supporting verification methods for software systems is created. COEMS tackles the issues of detection and identification of non-determi ...
Read Project

 6

 FINISHED 
SARAH is concerned with establishing novel holistic, simulation-based approaches to the analysis of aircraft ditching. It is build up from a consortium of experts from OEM industries, experienced suppliers of simulation technologies, established research institutions and representatives of the certification authorities. Results of SARAH are expected to support a performance-based regulation and ce ...
Read Project

 12

 FINISHED 

Decentralised Agile Coordination Across Supply Chains (DIGICOR)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

European manufacturing competes in a global knowledge-driven economy, and thus increasingly seeks competitive advantage through quality, agility and personalisation based on latest advances in IT. Increasing utilisation of IT in mission-critical elements of the production brings opportunities for consistency, transparency and flexibility, bringing the “lot size of 1” closer to reality even for mas ...
Read Project

 11

 FINISHED 
In the aerospace industry very high quality standards have to be met. For the manufacturing of carbon fibre parts this is currently solved through extended end-of-line inspection in combination with re-work processes to deal with defective parts. Also, in-situ visual inspection is used for quality control, which is currently causing huge productivity losses (30%-50%) during lay-up and has become a ...
Read Project

 7

 FINISHED 
Today, industrial markets demand highly added value products offering new features at a low-cost. To this extent, technologies to modify surfaces instead of creating composites or applying coatings on surfaces can offer new industrial opportunities. Current state of the art identifies short pulsed(SP)/ultra-short pulsed(USP) laser-material processing as a promising technology for structuring surfa ...
Read Project

 10

 FINISHED 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Read Project

 19

 FINISHED 
The ultimate purpose of ANYWHERE is to empower exposed responder institutions and citizens to enhance their anticipation and pro-active capacity of response to face extreme and high-impact weather and climate events. This will be achieved through the operational implementation of cutting-edge innovative technology as the best way to enhance citizen's protection and saving lives.ANYWHERE proposes t ...
Read Project

 32

 FINISHED 

Remotely Operated CBRNe Scene Assessment Forensic Examination (ROCSAFE)

Start date: Jul 1, 2016, End date: Jun 30, 2019,

The overall goal of ROCSAFE is to fundamentally change how CBRNe events are assessed, in order to and ensure the safety of crime scene investigators by reducing the need for them to enter high-risk scenes when they have to determine the nature of threats and gather forensics. For this, ROCSAFE will make use of cost-effective modern remotely-controlled robotic air and ground vehicles (RAVs/RGVs) th ...
Read Project

 14

 FINISHED 

Rf Engineered substrates to FostER fEm performaNCE (REFERENCE)

Start date: Dec 1, 2015, End date: May 31, 2019,

The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The project targets to develop over the next 3 years, innovative solutions from material, engineered substrates, process, design ...
Read Project

 18

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 
The proposed project, IMAGE, is relevant to Topic MG-1.10-2015, aiming to enhance the EU-China collaborative effort focusing on “Innovative methods and numerical technologies for airframe and engine noise reduction”. The project consortium consists of 12 partners.The purpose of IMAGE is to investigate experimentally and numerically innovative airframe and engine noise-reduction technologies and, i ...
Read Project

 13

 FINISHED 

European Space Robot Control Operating System (ESROCOS)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

The ESROCOS activity is devoted to the design of a Robot Control Operating Software (RCOS) that can provide adequate features and performance with space-grade Reliability, Availability, Maintainability and Safety (RAMS) properties. The goal of the ESROCOS proposal is to provide an open source framework which can assist in the generation of flight software for space robots. By providing an open sta ...
Read Project

 10

 FINISHED 
The main objective is to develop a standard interface that considers a set of connections that allow coupling of payload to manipulators and payload to other payload. The realization of a modular reconfigurable system depends, among other things, on interfaces, that includes mechanical interfaces connecting the blocks to one other, electrical interface for power transmission, thermal interfaces fo ...
Read Project

 10

 FINISHED 
The FACILITATORS goals are:-To Enable the highest possible level of validation of the common building blocks (developed by concurring operational grants) in the most relevant environment by adapting and providing the best available European test facilities, as well as -To Guarantee coherence among the different test facilities and among the building blocks by establishing common implementation/val ...
Read Project

 4

 FINISHED 
The accretion of ice represents a severe problem for aircraft, as the presence of even a scarcely visible layer can severely limit the function of wings, propellers, windshields, antennas, vents, intakes and cowlings. The PHOBIC2ICE Project aims at developing technologies and predictive simulation tools for avoiding or mitigating this phenomenon. The PHOBIC2ICE project, by applying an innovative a ...
Read Project

 4

 FINISHED 

FUture Cabin for the Asian Market (FUCAM)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

In many respects, the evolution of the Japanese airline passenger represents an anticipation of the societal trends for the world's future airline passenger (ageing and being connected from point to point for instance). If the design of the future human-centered passenger cabin is able to satisfy the highly demanding expectations from the Japanese customer (in terms of safety, perceived quality, c ...
Read Project

 6

 FINISHED 

Road-, Air- and Water-based Future Internet Experimentation (RAWFIE)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The purpose of the RAWFIE initiative is to create a federation of different network testbeds that will work together to make their resources available under a common framework. Specifically, it aims at delivering a unique, mixed experimentation environment across the space and technology dimensions. RAWFIE will integrate numerous testbeds for experimenting in vehicular (road), aerial and maritime ...
Read Project

 13

 FINISHED 
VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Read Project

 11

 FINISHED 
The advent of commercial-of-the-shelf (COTS) heterogeneous multi-core platforms is opening up a series of opportunities in the embedded computing market. Integrating multiple computing element running at smaller frequencies allows obtaining impressive performance capabilities at a reduced power consumption. At the same time, new applications are being proposed integrating more and more functionali ...
Read Project

 7

 FINISHED 
The main objective of the proposal is development of active multi-functional surfaces with high level of self-healing ability on the basis of Layered Double Hydroxide (LDH) structures formed on different industrially relevant metallic substrates. The main idea of the project is based on “smart” triggered release on demand for functional organic or inorganic anionic compounds intercalated into inte ...
Read Project

 4

 FINISHED 

Towards a EU framework for the security of Widezones (ZONESEC)

Start date: Dec 1, 2014, End date: Nov 30, 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Read Project

 19

 FINISHED 
The FLEXOP project is about developing multidisciplinary aircraft design capabilities for Europe that will increase competitiveness with emerging markets -particularly in terms of aircraft development costs. A closer coupling of wing aeroelasticity and flight control systems in the design process opens new opportunities to explore previously unviable designs. Common methods and tools across the di ...
Read Project

 10

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 

PROJET PILOTE FRANCO ALLEMAND POUR UN ERASMUS DES APPRENTIS

Start date: Jun 1, 2016, End date: May 31, 2018,

Par manque de temps, le résumé n'a pas été traduit.
Read Project

 2

 FINISHED 

ENHANCED EMPLOYABILITY THROUGH WORK-BASED LEARNING

Start date: Jun 1, 2016, End date: May 31, 2018,

We would like to carry out this project to further support the INTERNATIONALISATION STRATEGY of our institution, that has beensuccessfully offering VET transnational mobility experience since 2006.The vocational areas chosen are Engineering -(Aircraft Manufacturing, Welding) , Hospitaliy and Catering - Professional Cookery,Agriculture, Hairdressing that are priority areas of the College, the 4 sec ...
Read Project

 22

 FINISHED 
It is presently acknowledged and scientifically proven than climate related hazards have the potential to substantially affect the lifespan and effectiveness or even destroy of European Critical Infrastructures (CI), particularly the energy, transportation sectors, buildings, marine and water management infrastructure with devastating impacts in EU appraising the social and economic losses. The ma ...
Read Project

 20

 FINISHED 
AGILE targets multidisciplinary optimization using distributed analysis frameworks. The involvement of many disciplinary analyses ranging up to high levels of fidelity and agile workflow management are considered to be state-of-the-art and starting point for AGILE. Advanced optimization techniques and strategies will be developed in order to exploit available computing systems and to gain faster c ...
Read Project

 20

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9

 FINISHED 

Aeroelastic Gust Modelling (AEROGUST)

Start date: May 1, 2015, End date: Apr 30, 2018,

...ptable cost. These investigations will reduce the need for expensive wind tunnel testing and hence lead to time and cost savings at the design stage therefore ensuring that the European aerospace and defence industry remain competitive in the future. The wind turbine industry has similar concerns, with gusts and wind shear restricting the locations available for wind farms. The project will also ...
Read Project

 13

 FINISHED 
The integration of innovative lightweight materials like CFRP into multi-material design (MMD) environments in aeronautic applications brings along a paradigm shift in initial design, manufacturing and in maintenance, repair and overhaul (MRO). Essential cost reductions over the whole aircraft lifecycle demand innovative processes meeting the specific requirements of MMD in general and specificall ...
Read Project

 14

 FINISHED 
SALSA is an exploratory research project relating to multi-source ADS-B system.A multi-source ADS-B system that combines the benefit of all possible type of relays (space, maritime, air or ground based) of ADS-B messages could provide a global surveillance system to overcome the prevailing continuous surveillance constraints in the non-radar airspace (NRA). By bringing Space based ADS-B with othe ...
Read Project

 6