Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Read Project

 18

 FINISHED 
In clinical interventions, skill transfer from therapist to children with autism spectrum disorders (ASD) benefits from the inclusion of expressive artefacts such as puppets and animated characters. Well-designed robotic agents have proven to be particularly effective and are becoming an increasingly important tool for mediating between therapists and ASD children in robot-assisted therapy (RAT). ...
Read Project

 7

 FINISHED 
Europe is confronted by a demographic challenge as a decreasing work force has to support an increasing elderly population. The economic risk implied by this burden could be addressed by efforts to achieve an increase in Healthy Life Years. One key element would be to ensure unrestricted mobility for especially the elderly, allowing them to stay at work for longer. Irreversible joint deterioration ...
Read Project

 11

 FINISHED 
"RECREATE is a policy support network that will collect strategic and analyse information about medium and long term research and innovation trends and prospects.The aim of RECREATE is to overcome this fragmentation, and to create a clear cut research agenda for the Horizon 2020 priority of climate change, raw materials and resource efficiency using an RTD perspective for a transition management s ...
Read Project

 18

 FINISHED 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Read Project

 27

 FINISHED 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Read Project

 26

 FINISHED 

Parasite glycobiology and anti-parasitic strategies (GLYCOPAR)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"Protozoan parasites and helminths are the cause of some of the most devastating diseases worldwide and a major effort is needed to be able to control or eliminate these diseases. Glycoconjugates are abundant and ubiquitous on the surface of many parasites and they are frequently involved in their survival strategies by forming a protective barrier against host defences. A common feature of the pa ...
Read Project

 13

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 
CommONEnergy focuses on existing shopping malls to be refurbished and buildings with a different original function, redesigned to become shopping malls. Wholesales&Retail buildings represent 28% of the total non-residential building stock (BPIE, 2010), accounting for approximately 157 Mtoe in 2005 (EU EEAP). Considering typical shopping malls high impact on modern society (ICSC, 2008), the project ...
Read Project

 23

 FINISHED 
"A scalable, replicable, high energy efficient, zero emissions and cost effective SYSTEM to refurbish existing public-owned non-residential buildings to achieve at least 50% energy consumption reduction through:a) A systemic methodology for optimal building retrofitting towards zero emissions, developed to ensure cost effectiveness, scalability and replicability of the interventions taking into ac ...
Read Project

 18

 FINISHED 

High-Resolution Solar Physics Network (SOLARNET)

Start date: Apr 1, 2013, End date: Mar 31, 2017,

This project aims at integrating the major European infrastructures in the field of high-resolution solar physics. The following actions will be taken: (i) realise Trans-national Access to external European users; (ii) enhance and spread data acquisition and processing expertise to the Europe-wide community; (iii) increase the impact of high-resolution data by offering science-ready data and facil ...
Read Project

 32

 FINISHED 
The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Read Project

 73

 FINISHED 
Recent advances in our understanding and forecasting of climate and climate change have brought us to the point where skilful and useful predictions are being made. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. Howeve ...
Read Project

 26

 FINISHED 

Anti-Parasitic Drug Discovery in Epigenetics (A-PARADDISE)

Start date: Feb 1, 2014, End date: Jan 31, 2017,

This proposal builds on the proven methodology developed in the SEtTReND FP7 project to develop inhibitors of schistosome HME as lead compounds for new drugs. We will employ a target-based strategy for the development of novel drug leads against schistosomiasis, leishmaniasis, Chagas disease and malaria by targeting histone modifying enzymes (HME), in particular those involved in acetylation/deace ...
Read Project

 16

 FINISHED 

Support action for Vehicle and Road Automation network (VRA)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The improvement of sensors, power train control as well as communication, make possible the automation of vehicle driving. Vehicle prototypes are currently capable of driving automatically, in road and urban environment. The automation is provided by systems in the vehicle and/or deployed on the road infrastructure, so that the process is named Vehicle and Road Automation.Partial or full automatio ...
Read Project

 14

 FINISHED 
ADVANCE - Automatic Detection of VAscular Networks for Cancer Evaluation - will implement, optimise and validate the use of Optical Coherence Tomography (OCT) scanners in the setting of dermatology clinics, to improve the diagnosis and treatment of malignant melanoma.OCT is already an established clinical tool for the diagnosis and management of the less lethal non-melanoma skin cancer, but so far ...
Read Project

 7

 FINISHED 
Background:In current drug safety education and training in Europe, an integrative and translational approach is lacking. This shortfall has been identified by EUFEPS. The IMI (‘Strategic Research Agenda’), the FDA and the EMEA have also characterised this fact as a crucial gap in the education and training of scientists evaluating the safety of drug candidates and new medicines. Scope and objecti ...
Read Project

 34

 FINISHED 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Read Project

 32

 FINISHED 

MUlti SEnsor Technology for management of food processes (MUSE-Tech)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The concept behind MUSE-Tech is the development of three single sensors (Photoacoustic, Quasi Imaging UV-Vis and a Distributed Temperature) which will be integrated in a versatile and affordable Multi Sensor Device (MSD). The MSD will be based on a versatile plug-in architecture for real-time monitoring (on-/in-line) of multiple parameters associated with the quality and the chemical safety of raw ...
Read Project

 14

 FINISHED 
Most of the energy consumption in Europe is due to heating and cooling used for domestic, tertiary and industrial purposes; This energy is largely produced by directly burning fossil fuels with a negative environmental impact. RES directive and the SET Plan focuses its attention on the use of RES to drive systems for heating and cooling in order to reduce greenhouse gas emissions and the dependenc ...
Read Project

 24

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
The proposed project aims to the development of an ecological and innovative coating for composite parts which may be able to eliminate the styrene emissions from the workplace. Additionally, this type of coating will deliver improved production perfomance in terms of quality and dramatic reduction of associated operational costs which currently burden the progress of composite materials worldwide ...
Read Project

 16

 FINISHED 

Drug Disease Model Resources (DDMORE)

Start date: Mar 1, 2011, End date: Aug 31, 2016,

Model based-drug development (MBDD) is accepted as a vital approach in understanding patient risk/benefit and attrition. At the core of MBDD lies Modelling and Simulation (M&S), a technology providing the basis for informed, quantitative decision-making.M&S facilitates the continuous integration of available information related to a drug or disease into constantly-evolving mathematical models capa ...
Read Project

 28

 FINISHED 

Automation and Robotics for EUropean Sustainabile manufacturing (AREUS)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

European Factories of the Future will have to be smart and green:• SMART: high performance, reconfigurable, adaptive and evolving factories based on robotic technologies ,• GREEN: reduced ecological footprint through a more efficient use, at factory level, of material and energy resources.Industrial Robotics is the strategic technology needed to keep the European Manufacturing leading edge, unfort ...
Read Project

 12

 FINISHED 
SeaBioTech is a 48-month project designed and driven by SMEs to create innovative marine biodiscovery pipelines as a means to convert the potential of marine biotechnology into novel industrial products for the pharmaceutical (human and aquaculture), cosmetic, functional food and industrial chemistry sectors. SeaBioTech will reduce barriers to successful industrial exploitation of marine biodivers ...
Read Project

 17

 FINISHED 

Efficient Systems and Propulsion for Small Aircraft (ESPOSA)

Start date: Oct 1, 2011, End date: Jun 30, 2016,

The ESPOSA project will develop and integrate novel design and manufacture technologies for a range of small gas turbine engines up to approx. 1000 kW to provide aircraft manufacturers with better choice of modern propulsion units. It will also deal with engine related systems which contribute to the overall propulsion unit efficiency, safety and pilot workload reduction. Through the newly develop ...
Read Project

 45

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

Future Of Surface Transport Research Rail (FOSTER RAIL)

Start date: May 1, 2013, End date: Apr 30, 2016,

FOSTER RAIL addresses the broad support challenges of SST.2013.6-1. Strengthening the research and innovation strategies of the transport industries in Europe. This Research action is a Level 1 Coordination and Support Action aiming at supporting the land transport European Technology Platforms activities.This action will assist ERRAC and the other transport-related European technology platforms ( ...
Read Project

 20

 FINISHED 

Europeana Cloud: Unlocking Europe's Research via The Cloud (eCloud)

Start date: Feb 1, 2013, End date: Apr 30, 2016,

Europeana Cloud is a Best Practice Network, submitted under Objective 2.1.a and coordinated by the Europeana Foundation, designed to establish a cloud-based system for Europeana and its aggregators. Europeana Cloud will provide new content, new metadata, a new linked storage system, new tools and services for researchers and a new platform - Europeana Research. Content providers and aggregators, a ...
Read Project

 36

 FINISHED 
Cost-effectiveness for controlling emissions of Volatile Organic Compounds (VOC) in industrial waste gas depend on the characteristics of the gas emitted. SMEs affected by VOC emission Directive 99/13/EC (wood, printing, surface cleaning, dry cleaning, leather, vehicle refinishing) generate low and variable concentrations of several different VOCs in small volumes of waste air. This profile of VOC ...
Read Project

 8

 FINISHED 
"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Read Project

 29

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
DIRECTION project aims at the creation of a framework of demonstration and dissemination of very innovative and cost-effective energy efficiency technologies for the achievement of very low energy new buildings . This framework is based in three pillars:• Analysis of suitable energy efficiency technologies (technical and economic viability)• Demonstration activity deployed in three new buildings• ...
Read Project

 11

 FINISHED 
FERTIPLUS will identify urban and farm organic wastes that can be used to recycle nutrients into agriculture as biochar, compost or combinations of them. Urban and farm organic residues are a large source of nutrients and today not used to its full potential. FERTIPLUS will assess and use this potential and contribute to sustainable crop production and soil productivity and quality across regions ...
Read Project

 14

 FINISHED 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Read Project

 21

 FINISHED 

Minerals Intelligence Network for Europe (MINERALS4EU)

Start date: Sep 1, 2013, End date: Aug 31, 2015,

The Minerals4EU project is designed to meet the recommendations of the Raw Materials Initiative and will develop an EU Mineral intelligence network structure delivering a web portal, a European Minerals Yearbook and foresight studies. The network will provide data, information and knowledge on mineral resources around Europe, based on an accepted business model, making a fundamental contribution t ...
Read Project

 32

 FINISHED 

Enhanced plant productivity through control of lifespan (CROPLIFE)

Start date: Dec 1, 2010, End date: Jun 30, 2015,

The world-wide demand for primary plant products to be used for food, feed and fuel is increasing dramatically. The foreseen climate changes are expected to have a negative impact on plant productivity in addition. Future agriculture urgently needs new crop plant varieties with enhanced and sustainable productivity. To meet this challenge, “CropLife” focuses on leaf lifespan as a major determinant ...
Read Project

 11

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 
CAMPUS 21 focuses on the energy-efficient operation of public buildings and spaces. It brings together the expertise of national research centres from Germany (Telecommunications), Ireland (IT in AEC, Artificial Intelligence), Austria (Building Physics), and Spain (Information Technology); the management experience of Public Authorities and bundles this with the process expertise from multiple ind ...
Read Project

 10

 FINISHED 
"For many transport modes, energy reduction strategies can be effectively formulated at the level of the vehicle or vessel. New technologies can therefore be introduced to a vehicle and the direct energy savings can be readily quantified. However, such approach is not suitable to be employed for urban rail, where it is not sufficient to consider only the energy performance of vehicles; the energy ...
Read Project

 18