Search for European Projects

2 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...fit times far beyond the mandatory scheduled dry dock period that ships must take every 5 years. A fundamental barrier to converting all ships during the expected 5 – 8 yr regulatory window exists. Castlet Ltd have developed a novel high current power supply, based on modular power-sharing of 3 – 10 IGBT-controlled high frequency resonant converters. With a step change in performance, scalability ...
Read Project

 1

 FINISHED 
...ABLE TO CONTROL THE ELECTRICAL MACHINES USED TO ACTUATE THE MAIN ROTOR SWASHPLATE OF A MEDIUM SIZED ROTORCRAFT. THE POWER CONVERTERS WILL FORM AN INTEGRAL PART OF THE FAULT TOLERANT ACTUATION SYSTEM. CASTLET WILL DEVELOP AND SUPPLY AN INNOVATIVE SOLUTION TO THIS REQUIREMENT THAT MEET OR EXCEEDS THE PROJECT TEAMS EXPECTATIONS.
Read Project

 1