Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
This project aims to stimulate intersectoral and international collaboration within Europe and with an ICPC country, Kazakhstan, in the area of novel nanoporous and nanostructured adsorbents for the treatment of very serious health conditions associated with acute and chronic exposure to external radiation and uptake of heavy metals and radiation as a consequence of accidental, occupational or del ...
Read Project

 11

 FINISHED 
Scandium (Sc) is one of the highest valued elements in the periodic table and an element which is usually grouped in REEs as it shares many characteristics with Yttrium. Scandium technological applications are unique, as it is a key component in producing Solid Oxide Fuel Cells (Scandia-Stabilized-Zirconia solid electrolyte layer) or high strength Aluminum alloys used in aerospace and 3D printing ...
Read Project

 20

 FINISHED 
Certain industries, such as chemical production or petroleum refining have been identified as producing quantities of by-product hydrogen that can be used to produce clean, load-following power on a distributed basis, reducing reliance on fossil fuels. While the chemical production industry generally acknowledges the potential value of stationary fuel cell applications, the lack of multiple megawa ...
Read Project

 8

 FINISHED 
In today’s translation industry, both quantitative and qualitative changes provide a challenge for higher education institutions that offer specialised translator training. These changes include an estimated annual market growth of 10 %, radical technological advancement and the dramatic change of the job profile ‘specialised translator’. However, a number of studies show that HE translator traini ...
Read Project

 3

 FINISHED 

Forecast Engineering: From Past Design to Future Decisions

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Current and future engineering practices needs highly qualified engineers trained in advanced topics of structural engineering, modern technologies and good transversal competencies. Additionally, previous acquired knowledge and conducted experimental tests have to be collected, provided and make available and accessible. Beside this, there is an urgent need for advanced training courses in the fi ...
Read Project

 5

 FINISHED 
The European lighting industry aims at reducing cost, at continuously improving product performance while reducing time to market and enlarging the product. The main challenge for the design in of LED components into lighting systems is the temperature and current dependence of their performance. In order to achieve a good design of LED systems, a modular, multi-physics based modelling approach is ...
Read Project

 15

 FINISHED 

Stability Islands: Performance Revolution in Machining (SIREN)

Start date: Mar 1, 2014, End date: Feb 28, 2019,

"Cutting went through a revolution in the 1990s when high-speed milling (HSM) was introduced: the sculpture-like workpieces produced with high precision and efficiency resulted in one order of magnitude less parts in cars/aircrafts, which kept this traditional technology competitive at the turn of the century. This has been followed by an incremental development when not just the cutting speeds, b ...
Read Project

 1

 FINISHED 

MicroElectronics Cloud Alliance

Start date: Jan 1, 2016, End date: Dec 31, 2018,

mCloud Alliance brings together 18 higher education institutions (HEIs) and small and medium enterprises (SMEs) to develop Cloud-based European infrastructure and organisation for education in microelectronics providing a range of open educational resources (OERs), remote access and sharing of educational and professional software, remote and practice-based learning facilities. Neither university ...
Read Project

 18

 FINISHED 
This European Training Network aims to produce the next generation of early stage researchers who will enable Europe to take a leading role in the development of future devices, systems and networks supporting the 5G high-speed wireless internet. To do this, researchers must be able to work in interdisciplinary teams, integrate their activities, share expertise, and promote a vision of a converged ...
Read Project

 10

 FINISHED 

PROactive Safety for PEdestrians and CyclisTs (PROSPECT)

Start date: May 1, 2015, End date: Oct 31, 2018,

The past decade has seen significant progress on active pedestrian safety, as a result of advances in video and radar technology. In the intelligent vehicle domain, this has recently culminated in the market introduction of first-generation active pedestrian safety systems, which can perform autonomous emergency braking (AEB-PED) in case of critical traffic situations. PROSPECT will significantly ...
Read Project

 18

 FINISHED 

Piezoelectric Vibration Absorber for Machining Applications (PIEZOMACH)

Start date: Oct 1, 2016, End date: Sep 30, 2018,

The main idea of the PIEZOMACH project is to develop a fully passive nonlinear device for suppressing chatter vibrations in machine tools. These vibrations represent a major concern in industry, as they result, for instance, in waves on the machined surface. This project goes beyond the challenge of dealing with the nonlinear nature of chatter vibrations, to developing a device that can unlock the ...
Read Project

 1

 FINISHED 
In recent years, the importance of high quality in education and care for young children has been increasingly acknowledged and reflected in a high number of European strategies, policies and programmes between the European Commission and the Member States. In 2011, the Council of the EU formally recognizes the central impact of early years service provision for individual, societal, and economic ...
Read Project

 10

 FINISHED 
The main objective of the eu-WELD project is to develop a qualification according to the European Qualifications Framework (EQF) based on the continuous requirements on the labor market. The project aims at identifying the needs of the fields that use welded structures concerning the expert welder’s skills and knowledge that are necessary to meet the requirements related to the execution of welde ...
Read Project

 6

 FINISHED 
The main objective of the proposed CORONA II project is to enhance the safety of nuclear installations through further improvement of the training capabilities aimed at building up the necessary personnel competencies.Specific objective of the proposed CORONA II project is to proceed with the development of state-of-the-art regional training center for VVER competence (which will be called CORONA ...
Read Project

 9

 FINISHED 
"For a vast amount of applications in the medical, industrial, research and other sectors, a good understanding of radiation protection (RP) is fundamental in order to protect workers, the public and the environment from the potential risks of ionising radiation. Within this perspective, building and maintaining an advanced level of competence in RP, assuring sufficient well-trained personnel and ...
Read Project

 14

 FINISHED 

Career Management Skills at VET school level

Start date: Nov 1, 2016, End date: Apr 30, 2018,

Career management skills combine elements of several transversal competences, highlighted in the European Framework of Key Competences for Lifelong Learning such as learn to learn (setting and following learning goals related to career choice made, investing efforts and maintaining discipline for continuous development in the professional area of one's interest); digital competences (applying ICT ...
Read Project

 5

 FINISHED 
FLOW sees a need for a paradigm shift wherein non-motorised transport (often seen from a transport policy perspective simply as a nice “extra”) is placed on an equal footing with motorised modes with regard to urban congestion. To do this, FLOW will create a link between (currently poorly-connected) walking and cycling and congestion by developing a user-friendly methodology for evaluating the abi ...
Read Project

 16

 FINISHED 
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Read Project

 47

 FINISHED 

5G Exchange (5GEx)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Read Project

 20

 FINISHED 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Read Project

 15

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
For Europe to remain at the forefront of scientific and technological development, the current shortage of persons trained in these fields at secondary and higher education has to be overcome. While some progress has been made in increasing enrolment in Science, Technology, Engineering and Mathematics (STEM) programs in most European countries as stipulated by the Lisbon Objectives, the most press ...
Read Project

 7

 FINISHED 
The growth of advanced composites in construction in recent years has been spectacular, doubling in size in the last 10 years. This expansion has been largely due to the use of Fibre Reinforced Polymer reinforcement in structural applications and, although the current economic climate has seen a slowdown of the general construction market, the demand of composite products within the European const ...
Read Project

 14

 FINISHED 
The (KA2) D-TRANSFORM program is a first attempt to set up a "University Leader Program" (addressed to university presidents and vice-presidents) at the European level on the role of e-Education in shaping University strategies. EU-ordered foresight studies on the issues raised by learning modernization in higher education in the 21st century clearly shows that the major bottleneck found is the st ...
Read Project

 7

 FINISHED 

Networked Activities for Realization of Innovative Products

Start date: Sep 1, 2014, End date: Aug 31, 2017,

Design researchers acknowledge five trends of the industrial design practice that emerge from the changing global environment: (1) emerging new technology increases the use of digital media; (2) the boundary between design disciplines is fuzzy; (3) there is a need for multidisciplinary teamwork; (4) there is a movement trend from individual product to systems; (5) there is an increasing dependence ...
Read Project

 4

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Heusler Alloy Replacement for Iridium (HARFIR)

Start date: Sep 1, 2013, End date: Mar 31, 2017,

The proposed HARFIR project intends to develop antiferromagnetic (AF) Heusler alloy (HA) films to replace the antiferromagnetic alloy Iridium Manganese (IrMn), which has been widely used in all spin electronic devices including hard disk drives and next-generation magnetic memories. Accordingly the price of Ir has risen by a factor of 4 in the last five years and by more than a factor of 10 in the ...
Read Project

 5

 FINISHED 
eDIGIREGION is a unique collaborative project that brings together a balanced blend of complimentary and experienced partners from four diverse regions. The sixteen (16) people involved in formulating this proposal are senior executives and decision makers in their respective organisations. These partners have embarked upon, are committed to, and have already demonstrated the power of transnationa ...
Read Project

 16

 FINISHED 
European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Read Project

 34

 FINISHED 

Intelligent Catheters in Advanced Systems for Interventions (INCITE)

Start date: Mar 1, 2014, End date: Mar 1, 2017,

INCITE aims to develop intelligent catheter technologies and systems that will accelerate the paradigm shift from costly, burdensome surgical treatments to cost-effective and patient-friendly minimally invasive interventions. It will also enable the creation of new advanced treatments for currently complex surgical procedures. This will allow for more individuals to be treated thereby contributing ...
Read Project

 24

 FINISHED 
Aim of the Training Program (DoHip) is to meet the growing demand of Europe’s industry for highly trained scientists and engineers in process technology. Process Technology is fundamental for chemical, pharmaceutical, and polymer industry as well as food industry and cosmetics. High Pressure Processes like the Polyethylene Synthesis have been developed in Europe, leading to the outstanding positio ...
Read Project

 7

 FINISHED 

Certifications of Critical Systems (CECRIS)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"The project aims at taking a step forward in the growing field of development, verification and validation and certification of critical systems.The project focuses on the more difficult/important points of (safety, efficiency, business, …) of critical system development, verification and validation and certification process. The scientific objectives of the project are study both the scientific ...
Read Project

 6

 FINISHED 

Graduate and Executive Nuclear Training and Lifelong Education (GENTLE)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

The GENTLE project is a pan-European effort in the field of education and training (E&T) on Nuclear Energy. It brings together leading European academic and research institutions with the goal to set up a life-long learning programme, strongly supported by stakeholders from industry. GENTLE focuses on two E&T domains: (a) the education of students by means of student research experiences in the nu ...
Read Project

 12

 FINISHED 

Engineering Technology-based Innovation in Medicine (eTime)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

Background: Healthcare systems worldwide are increasingly unable to meet growing demand for and cost of healthcare. Changing demographics leading to increasing demand for services of increasing cost exacerbate this problem. Thus,healthcare costs are an increasingly unaffordable share of economically constrained national budgets.More specifically, an average 10% of healthcare costs are for acute an ...
Read Project

 3

 FINISHED 

Portable Automated Water Analyser for Viruses (AQUAVIR)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

Water-borne viral diseases pose high risks for public health worldwide. The urban wastewater contains large number of pathogen viruses, and even the most advanced wastewater treatment is not safe for full removal of virus particles.The conventional biological water quality indicators do not provide adequate information about the presence of pathogenic viruses. The currently available reliable viru ...
Read Project

 14

 FINISHED 

Cooper pairs as a source of entanglement (CooPairEnt)

Start date: Feb 1, 2011, End date: Oct 31, 2016,

Entanglement and non-locality are spectacular fundamentals of quantum mechanics and basic resources of future quantum computation algorithms. Electronic entanglement has attracted increasing attention during the last years. The electron spin as a purely quantum mechanical two level system has been put forward as a promising candidate for storing quantum information in solid state. Recently, great ...
Read Project

 1

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2015, End date: Sep 30, 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

DYNAMICAL SYSTEMS AND THEIR APPLICATIONS (DynSysApll)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

The main objective of this project is to create fundamental understanding in dynamical systems theory and to apply this theory in formulating and analyzing real world models met especially in Neuroscience, Plasma Physics and Medicine. The specific objectives, tasks and methodology of this proposal are contained in the 5 WPs of the project. In WP1 we want to develop new methods for the center and i ...
Read Project

 10

 FINISHED 
Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Read Project

 20