Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...ems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical work-packages. The first contains safety analyses to support licensing of MYRRHA. Design-based, design extended and severe accident events will be studied with a focus on transients potentially leading to fuel pin failures. Fuel assembly blo ...
Read Project

 14

 FINISHED 
Fanconi anemia (FA) is a rare inherited syndrome characterized by the early development of bone marrow failure and increasing predisposition to cancer with age. Allogeneic hematopoietic cell transplantation (alloHCT) is the only curative therapy for hematopoietic manifestations of FA, although associated with complications arising from myeloablation, graft versus host disease and increased inciden ...
Read Project

 13

 FINISHED 
...oring potential enhancement of existing source term mitigation devices,Demonstrating the ability of innovative systems to achieve larger source term attenuation.The understanding gained from in-depth analysis of experimental results will make it possible to produce simple models and/or correlations easy to be implemented in accident analysis codes, this way enhancing code capabilities to model Sev ...
Read Project

 11

 FINISHED 
...centres; establishing one access point and clear rules for users; preparing all the necessary mechanisms to secure sustainable financial resources; defining appropriate systems for knowledge and IPR management; coordinating the efforts of the participating infrastructures around Europe; establish joint future development of research facilities; elaborating effective rules for the dissemination of ...
Read Project

 15

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

...oordination and Support Action and the second part a Collaborative Project. The aim of the first part, the Coordination and Support Action, is to establish an efficient, transparent and high quality management structure to carry out the planning and management of R&D including project calls, proposal evaluation, project follow-up dissemination and valorisation of R&D results in the area of safety ...
Read Project

 52

 FINISHED 

INNOVATIVE CONFIGURATION FOR A FULLY RENEWABLE HYBRID CSP PLANT (HYSOL)

Start date: May 1, 2013, End date: Jul 31, 2016,

Renewable energies have often problems in order to provide a stable and reliable power supply, as they often depend on meteorological circumstances that have a variable or stochastic component. This fact is often used by their detractors to favour the use of other alternatives such as fossil fuels.The main added value of the hybridisation concept will be the achievement of the Europe Strategic Ene ...
Read Project

 8

 FINISHED 

Safety of ACtinide Separation proceSSes (SACSESS)

Start date: Mar 1, 2013, End date: Jun 30, 2016,

...d makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensuring a robust and socially acceptable system of protection of man and environmen ...
Read Project

 26

 FINISHED 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Read Project

 9

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 
Recent safety assessments nuclear waste repositories have shown that the formation and stability of colloids may have a direct impact on the overall performance of the repository.The main aim of the BELBaR project is increase the knowledge of the processes that controls clay colloid stability, generation and ability to transport radionuclides. The overall purpose of the project will be to suggest ...
Read Project

 18

 FINISHED 

Logistics for Energy Crops' Biomass (LOGISTEC)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

... of the Strategic Energy Technologies-Plan of the European Union, which are likely to be impeded by the potential scarcity of lignocellulosic biomass from agriculture. Innovative techniques for crop management, biomass harvesting and pre-treatment, storage and transport offer a prime avenue to increase biomass supply while keeping costs down and minimizing adverse environmental impacts.The LogistE ...
Read Project

 24

 FINISHED 
... close gaps that have been identified in nuclear and radiological preparedness following the first evaluation of the Fukushima disaster. It addresses the call Fission-2010-3.3.1: Update of emergency management and rehabilitation strategies and expertise in Europe. The consortium intends to review existing operational procedures in dealing with long lasting releases, address the cross border proble ...
Read Project

 50

 FINISHED 

PEL-SKIN: A novel kind of surface coatings in aeronautics (PEL-SKIN)

Start date: Jun 1, 2013, End date: Nov 30, 2015,

"The PEL-SKIN project aims to deliver a novel airfoil coating to improve the global aerodynamic performance and manoeuvrability of future air transport. We propose to investigate drag reduction from a prefabricated coating composed of a densely packed arrangement of flexible fibres that can be attached directly onto a wing or aerodynamic surface, in the region of separated flow.Inspired by the ‘po ...
Read Project

 6

 FINISHED 
...ill investigate how climate change alters local patterns of pollutant exposure and threshold exceedance.A network of European experiments for contrasting ecosystems and climates, combined with meta-analysis of unpublished datasets, will quantify how climate change alters ecosystem vulnerability to tropospheric O3 and N deposition, including interaction with increased CO2. Combined with special top ...
Read Project

 41

 FINISHED 
CHAIN-REDS vision is to promote and support technological and scientific collaboration across different eInfrastructures established and operated in various continents, in order to facilitate their uptake and use by established and emerging Virtual Research Communities (VRCs) but also by single researchers, promoting instruments and practices that can facilitate their inclusion in the community of ...
Read Project

 14

 FINISHED 
...th systems. RA is the most common inflammatory arthritis, affecting 0.5% to 1% of the general population worldwide with little variation of the prevalence among countries.The current pharmacological management of RA involves early intervention with synthetic disease modifying anti-rheumatic drugs (DMARDs) either singly or in combination. Despite all those treatments, RA remains as an unmet clinica ...
Read Project

 10

 FINISHED 
In concentrating photovoltaic systems (CPV) the incident solar radiation is multiplied by a factor equal to the concentration ratio. The electricity production per cell area is increasing almost linear with the concentration ratio. Concentration on PV cells surface, directly results in a proportional temperature increase, deteriorating the performance of the cells. To cope with this effect, in som ...
Read Project

 7

 FINISHED 
...ease and emission reduction in this field.The chosen system approach of the BioMaxEff consortium rather than an isolated product optimization and demonstration approach consequently is:• Perform an analysis of framework conditions and market needs• Develop seasonal efficiency and emission factor determination methods for the test stand and field testing• Demonstrate and optimize considered technol ...
Read Project

 13

 FINISHED 

Solar Facilities for the European Research Area (SFERA)

Start date: Jul 1, 2009, End date: Dec 31, 2013,

Concentrated solar energy is a very promising renewable source of energy. The solar resource in the Mediterranean countries of the EU and in North Africa is huge. The best known application so far is bulk electricity generation through thermodynamic cycles, but other applications have also been demonstrated, such as production of hydrogen and solar fuels, water treatment and research in advanced m ...
Read Project

 12

 FINISHED 

Co-ordination and Harmonisation of Advanced e-INfrastructures (CHAIN)

Start date: Dec 1, 2010, End date: Nov 30, 2012,

Over the past 6 years, the EC has invested to extend the European eInfrastructure technology and European eInfrastructure (and particularly Grid) operational and organisational principles to a number of regions in the world, and reinforcing the close collaboration and exchange of know-how with similar technologies in other areas. A number of different collaboration models have thus been establishe ...
Read Project

 13

 FINISHED 
... dissemination actions, workshops, Conferences;o\tProduce dissemination material.Grid Services for VRCs will be provided by CLARA on the basis of a business plan using a Life Cycle Product Management (LCPM) approach.
Read Project

 31