Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The FUTURE-RADAR project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) and the European Green Vehicle Initiative PPP to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FUTURE-RADAR will provide the consensus-based plan ...
Read Project

 23

 FINISHED 
The main goal of the CLOVER project is to offer a novel methodology in an environmental mechatronic control system design relying on multidisciplinary knowledge. This methodology should allow aspects to be taken into account, such as controller robustness, indirect measurement of system states and parameters, and disturbances attenuation on the stage of establishing controller architecture. In add ...
Read Project

 9

 FINISHED 
Within the project a new highly efficient biomass CHP technology consisting of a fuel-flexible fixed-bed updraft gasifier, a novel compact gas cleaning system and a solid oxide fuel cell (SOFC) shall be developed for a capacity range of 1to 10 MW (total energy output). The technology shall distinguish itself by a wide fuel spectrum applicable (wood pellets, wood chips, SRC, selected agricultural f ...
Read Project

 9

 FINISHED 
...rk, Slovenia, Austria, Finland) and one associated country (Switzerland). The partnership covers all competences necessary: experimental testing (CEA, DTU, EPFL), algorithms developments (UNISA, IJS, AVL), hardware development (BIT), system integration and validation (VTT, SP, HTC), supported by AK for the project management and dissemination.
Read Project

 11

 FINISHED 
The aim of INN-BALANCE is to develop a novel and integrated development platform for developing advanced Balance of Plant components in current fuel cell based vehicles, in order to improve their efficiency and reliability, reducing costs and presenting a stable supply chain to the European car manufacturers and system integrators. Accordingly, INN-BALANCE technical objectives are (i) to develop h ...
Read Project

 9

 FINISHED 

Dependability Engineering Innovation for CPS - DEIS (DEIS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Cyber-Physical-Systems harbor the potential for vast economic and societal impact in all major application domains, however in case of failure this may lead to catastrophic results for industry and society. Thus, ensuring the dependability of such systems is the key to unlocking their full potential and enabling European industries to develop confidently business models that will nurture their soc ...
Read Project

 10

 FINISHED 
"The main target of the ITEAM project is to establish and sustainably maintain the European training network with high grade of interdisciplinarity, which will train strong specialists skilled in research and development of novel technologies in the field of multi-actuated ground vehicles (MAGV). The global goals are: (i) Advance of European postgraduate education in the area of environment- and u ...
Read Project

 11

 FINISHED 
The COMPASS project is a collaborative effort of AVL, Plansee, Nissan and Research Center Jülich to develop advanced SOFC APU systems for range extender applications in passenger cars. The consortium is perfectly integrated from powder-, cell-, stack-, APU system technology providers to vehicle manufacturer and an academic partner. The project will use innovative metal supports SOFC stack technolo ...
Read Project

 4

 FINISHED 

High efficient Particulate free Gasoline Engines (UPGRADE)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The UPGRADE project aims to support the transition to a high efficient, cleaner and affordable powertrain technology systems, based on Spark Ignited GDI (Gasoline Direct Injection) approach, suitable for future Light Duty applications. The project also includes a deep analysis of the phenomenon of the formation of the nanoparticles in relationship to the engine design and its operating conditions ...
Read Project

 12

 FINISHED 
DownToTen will seek to develop a reliable and robust methodology to enhance the regulatory approach in the assessment of particle number emissions in the sub 23nm region (down to at least 10nm), focusing on state-of-the art automotive powertrains with direct injection gasoline engines, but also diesel ones, under real-world operation conditions. To this end, DownToTen will first investigate and qu ...
Read Project

 8

 FINISHED 
Reduction of soot emissions from Diesel engines will be explored by utilising simultaneously (a) injection pressure between 2000-4500bar, (b) engine operation at supercritical conditions relative to the injected fuel’s critical point and (c) additives that improve atomisation and reduce pollutant formation. The detailed processes of nozzle flow cavitation/boiling, atomisation, phase-change and mix ...
Read Project

 8

 FINISHED 
Fuel economy is a key aspect to reduce operating costs and improve efficiency of freight traffic, thus increasing truck competitiveness.The main objective of the IMPERIUM project (IMplementation of Powertrain Control for Economic and Clean Real driving EmIssion and ConsUMption) is to achieve fuel consumption reduction by 20% (diesel and urea) whilst keeping the vehicle within the legal limits for ...
Read Project

 16

 FINISHED 

Future Freight Loco for Europe (FFL4E)

Start date: Sep 1, 2016, End date: May 31, 2019,

Since 2008, the rail freight market has not yet recovered from the global recession and profit margins in the railway sector have been falling throughout Europe. Moreover, competition was able to increase their capacity due to innovations. Within the last 15 years, inland vessels have increased their transport capacity by 158%, truck transportation by up to 50% while rail freight transportation on ...
Read Project

 7

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
The project aims at the development of a new innovative highly efficient and fuel flexible micro-scale biomass CHP technology consisting of a small-scale fixed-bed updraft gasifier, a compact gas cleaning system and a solid oxide fuel cell (SOFC). The technology shall be developed for a capacity range of 25 to 150 kW (fuel power) and shall be characterised by a wide fuel spectrum applicable (wood ...
Read Project

 8

 FINISHED 

Power Semiconductor and Electronics Manufacturing 4.0 (SemI40)

Start date: May 1, 2016, End date: Apr 30, 2019,

Addressing European Policies for 2020 and beyond the “Power Semiconductor and Electronics Manufacturing 4.0” (SemI40) project responds to the urgent need of increasing the competitiveness of the Semiconductor manufacturing industry in Europe through establishing smart, sustainable, and integrated ECS manufacturing. SemI40 will further pave the way for serving highly innovative electronic markets w ...
Read Project

 38

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 

Solid Oxide Stack Lean Manufacturing (SOSLeM)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The proposed SOSLeM project will contribute to the call objectives by improving production processes as well as developing and applying novel manufacturing technologies for FC stacks. The improvements proposed by the project will sum up to a reduction of manufacturing costs of about 70%, leading to decreased capital cost of about 2.500 €/kW. Besides these outstanding economical and technical impro ...
Read Project

 6

 FINISHED 
‘Massive Open Online Courses’ (MOOCs) caused a major impact on HEIs worldwide. Business models, target groups, quality standards, certification, sustainability, teaching, delivery & learning methods are all affected. Europe is yet to respond to these emerging trends. Initiatives in the EU exist, but remain isolated, both geographically and per sector. They lack impact on the HEI area as a whole, a ...
Read Project

 11

 FINISHED 
Cavitation, described as the formation of vapour/gas bubbles of a flowing liquid in a region where the pressure of the liquid falls below its vapour pressure, often leads to vibration and damage of mechanical components, for example, bearings, fuel injectors, valves, propellers and rudders, impellers, pumps and hydro turbines. Cavitation erosion when experienced, normally leads to significant addi ...
Read Project

 8

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
"The main target of the Mont-Blanc 3 project "European Scalable and power efficient HPC platform based on low-power embedded technology" is the creation of a new high-end HPC platform (SoC and node) that is able to deliver a new level of performance / energy ratio whilst executing real applications.The technical objectives are:1. To design a well-balanced architecture and to deliver the design for ...
Read Project

 10

 FINISHED 
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving the improvement of perception, decision and planning under adverse conditions is one of the main challenges to be addressed. Robus ...
Read Project

 15

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Read Project

 13

 FINISHED 

REal World Advanced Technologies foR Diesel Engines (REWARD)

Start date: May 1, 2015, End date: Apr 30, 2018,

The overall objective of the REWARD project is to develop the knowhow, intellectual property rights and technical capabilities to adequately and cost-effectively produce cleaner, highly efficient Diesel powertrains and aftertreatment technologies for future cleaner class A, B, C, D and E passenger cars and light commercial vehicles (LCVs) up to 3,500 kg that “go beyond Euro 6 limits under Real Dri ...
Read Project

 16

 FINISHED 
The ECOCHAMPS project addresses topic GV-4-2014, Hybrid Light and Heavy Duty Vehicles. The work will, in a single coordinated project, address all aspects of this topic and will be conducted by 26 partners representing the European automotive industry (OEMs (EUCAR), suppliers (CLEPA), ESPs and universities (EARPA)) including members of ERTRAC and EGVIA. The objective is to achieve efficient, compa ...
Read Project

 28

 FINISHED 
The FiveVB project will develop a new cell technology based on innovative materials such as high capacity anodes, high voltage cathodes and stable, safe and environmentally friendly electrolytes. Since main European industry partners representing the value chain from materials supplier to car manufacturer are involved, this program will support and enable the development of a strong and competitiv ...
Read Project

 11

 FINISHED 

Heavy Duty Gas Engines integrated into Vehicles (HDGAS)

Start date: May 1, 2015, End date: Apr 30, 2018,

The overall objective of HDGAS is to provide breakthroughs in LNG vehicle fuel systems, natural gas and dual fuel engine technologies as well as aftertreatment systems. The developed components and technologies will be integrated in up to three demonstration vehicles that are representative for long haul heavy duty vehicles in the 40 ton ranges. The demonstration vehicles will: a) comply with the ...
Read Project

 19

 FINISHED 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Read Project

 15

 FINISHED 
This project aims at improving the robustness, manufacturability, efficiency and cost of SOLIDpower’s state-of-the-art SOFC stacks so as to reach market entry requirements. We propose a focused project addressing the key issues that have manifested themselves in the course of the ongoing product development efforts at SOLIDpower SA. The key issues are the mechanical robustness of solid oxide fuel ...
Read Project

 10

 FINISHED 
"The BATWOMAN ITN aims at structuring research training in basic and advanced acoustics and setting up a work program on methodologies for acoustics for skills development in a highly diverse research field offering multiple career options.The consortium consists of renowned public and private partners from musical acoustics, room acoustics and automotive acoustics who will merge their existing kn ...
Read Project

 11

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
This proposal specifically addresses the topic MG.9.6-2014. Strengthening the research and innovation strategies of the transport industries in Europe.The aim of SETRIS is to deliver a cohesive and coordinated approach to research and innovation strategies for all transport modes in Europe. To fulfil the aim of SETRIS, the following objectives are envisaged:1. To identify synergies between the tra ...
Read Project

 18

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
CPS require multiple engineering competences across various engineering disciplines. The development of such systems is a huge challenge, also because of the heterogeneity of engineering tools involved in development platforms across the development lifecycle. In order to overcome this challenge, past and on-going EU research projects have developed the basis for an International Open Standard for ...
Read Project

 9

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Future of Surface Road Transport European Resarch (FOSTER-ROAD)

Start date: Mar 1, 2013, End date: Dec 31, 2016,

"The FOSTER-ROAD project will support the European Technology Platform ERTRAC (the European Road Transport Research Advisory Council) to create and implement the needed research and innovation strategies for a sustainable and competitive European road transport system. Linking all relevant stakeholders FOSTER-ROAD will provide the consensus-based plans and roadmaps addressing the key societal, env ...
Read Project

 17

 FINISHED 
Traditionally, the European manufacturing industry is characterized by innovative technology, quality processes and robust products which have leveraged Europe's industrialization. However, globalization has exposed Europe's industry to new emerging and industrialized manufacturing markets and the current economic challenges have decelerated the internal boost and investment, respectively. Hence, ...
Read Project

 29

 FINISHED 
One of the main factors for energy efficiency enhancement in fully electric vehicles is systems integration. To achieve this, iCOMPOSE proposes a step change in the control software architecture with particular focus on comprehensive energy management. This will lead to energy savings and extended driving range of the fully electric vehicle, with benefits of improved vehicle safety and comfort. Th ...
Read Project

 9