Search for European Projects

11 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Artificial lighting is a global and growing industry. New forms of efficient solid state lighting (SSL) in particular are rapidly gaining a market share. New OLED technologies (Organic Light Emitting Diode) can revolutionise this industry as they have done in displays because of their potential flexible structure, infinite tailoring of their properties, efficiency and high colour quality. Industri ...
Read Project

 9

 FINISHED 

CarbON Nanotube compositE InterconneCTs (CONNECT)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Our modern society has gained enormously from novel miniaturized microelectronic products with enhanced functionality at ever decreasing cost. However, as size goes down, interconnects become major bottlenecks irrespective of the application domain. CONNECT proposes innovations in novel interconnect architectures to enable future CMOS scaling by integration of metal-doped or metal-filled Carbon Na ...
Read Project

 7

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

FLEXOLIGHTING

Start date: Jan 1, 2015, End date: Dec 31, 2017,

The flexolighting programme is focussed on research and innovations on materials, processes and device technology for OLED lighting with the intention of building a supply chain within Europe. The aim is to realise OLED devices over a large area/surface with high brightness, high uniformity and long life time. A demonstrator will be built and delivered at the end of the project. The main targets a ...
Read Project

 9

 FINISHED 
"GLADIATOR (Graphene Layers: Production, Characterization and Integration) will enable the scalable production of cheaper, higher quality and larger area graphene sheets. The project will achieve this by optimizing the performance of CVD graphene (using doping), by increasing the throughput and size of CVD batch reactors, and by improving the process by which graphene is transferred for the CVD ca ...
Read Project

 16

 FINISHED 
The target of the Smartonics project is the development of Pilot lines that will combine smart technologies with smart nanomaterials for the precision synthesis of Organic Electronic (OE) devices.The Smartonics objectives are:1.Development of smart Nanomaterials for OEs (polymer & small molecule films, plasmonic NPs and super-barriers) by process and computational modeling optimization.2.Developme ...
Read Project

 19

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
"Windows are critical elements to control the energy performance of buildings especially for zero-energy buildings. It is of paramount importance to develop windows which show reduced U-value, weight and costs and certain features to control and harvest energy. Such a window will have a high impact in the window industry and will reduce green house gas emissions as long as the window is affordable ...
Read Project

 15

 FINISHED 

European 450mm Equipment & Materials Initiative (EEMI 450)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

Large-scale semiconductor fabrication is now standardised on 300mm diameter wafers. However, as demand grows and node dimensions diminish, major chipmakers are considering offsetting the growing costs of miniaturisation by increasing wafer size to 450mm to cut cost per produced die. A prerequisite is the availability of the required quality wafers and equipment able to handle larger wafers. The EN ...
Read Project

 27

 FINISHED 

Technology for Wafer-scale Carbon Nanotube Applications (TECHNOTUBES)

Start date: May 1, 2009, End date: Apr 30, 2012,

Carbon nanotubes are materials with a set of unique electrical, mechanical, surface and thermal properties. Yet their adoption in mainstream applications has been limited by mass production and device integration. This project develops the first 300mm wafer-scale equipment for production of carbon nanotubes on surfaces. The project will cover the design, engineering, process control, quality assur ...
Read Project

 12

 FINISHED 

Materials for Robust Gallium Nitride (MORGaN)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Read Project

 24