Search for European Projects

18 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Gridded Ion Engine Standardised Electric Propulsion Platforms (GIESEPP)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The consortium proposes an innovative activity to develop, build and test to TRL5 the first European Plug and Play Gridded Ion Engine Standardised Electric Propulsion Platform (GIESEPP) to operate Airbus Safran Launchers and QinetiQ Space ion engines. These are the only European ion engines in the 200-700W (LEO) and 5kW (GEO) domains that are space-proven, and the consortium’s intention will be to ...
Read Project

 8

 FINISHED 

Technology for Self Removal of Spacecraft (TeSeR)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

Orbital space is getting increasingly crowded and a few collision events could jeopardize activities in important orbits and cause significant damage to the infrastructure in space. As a preventive measure to be included in future S/C, TeSeR proposes a universal post mission disposal module to be carried into orbit by any S/C to ensure its proper disposal after ending its service lifetime, be it p ...
Read Project

 11

 FINISHED 

Speaker Identification Integrated Project (SIIP)

Start date: May 1, 2014, End date: Apr 30, 2018,

SIIP is a break-through Suspect Identification solution based on a novel Speaker-Identification (SID) engine fusing multiple speech analytic algorithms (e.g. voiceprints recognition, Gender/Age/Language/Accent ID, Keyword/ Taxonomy spotting and Voice cloning detection). This Fused Speaker Identification will result in significantly higher true-positive speaker identification, reduced False-Positiv ...
Read Project

 20

 FINISHED 

Hybrid Propulsion Module for transfer to GEO orbit (HYPROGEO)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

Independent access to space is a key component of the European Space Policy. The competition is increasing in this area both for the full launching systems and the key subsystems. Cost-effectiveness becomes the main driving factor.HYPROGEO ambition is to study a propulsion module based on Hybrid chemical propulsion. Hybrid propulsion is not a new technology but its application to a transfer module ...
Read Project

 15

 FINISHED 

A Low Cost Active Debris Removal Demonstration Mission (REMOVEDEBRIS)

Start date: Nov 11, 2013, End date: Nov 11, 2017,

A huge amount of debris has progressively been generated since the beginning of the space era. Most of the objects launched into space are still orbiting the Earth and today these object and their by-products represent a threat both in space and on Earth. In Space, debris lead to collisions and therefore to damages to operational satellites. For both issues, a credible solution has emerged over th ...
Read Project

 11

 FINISHED 

Global ATM security management (GAMMA)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Read Project

 23

 FINISHED 
"In a disaster situation three things contribute to a success: having the right resource available in the shortest time, with the highest relevance and at the right location.Access to necessary information, communication with other rescuers and stakeholders as well as the availability of resources are key factors in minimizing damage and loss of life.Large scale disasters and crisis situations inc ...
Read Project

 13

 FINISHED 
...udy the portability to European latest and highest performance hardened semiconductor technology (STM65nm)This is achieved by the collaboration of the most experienced companies in this field, namely Airbus Defence and Space (G, F) for specific heritage on high reliable and radiation hardened systems, ARM (UK) providing its excellence in processor core IPs and know-how in this field of development ...
Read Project

 6

 FINISHED 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Read Project

 32

 FINISHED 
"A range of new applications will be enabled by ultra-precise optical clocks, some of which by using them in space, near or far distant from Earth. They cover the fields of fundamental physics (tests of General Relativity), time and frequency metrology (comparison of distant terrestrial clocks, operation of a master clock in space), geophysics (mapping of the gravitational potential of the Earth), ...
Read Project

 17

 FINISHED 
"European Space industry demand for lighter and cheaper launcher transport systems. The proposed project DESICOS contributes to these aims by a new design approach for imperfection sensitive composite launcher structures, exploiting the worst imperfection idea efficiently: the Single Perturbation Load Approach. Currently, imperfection sensitive shell structures prone to buckling are designed accor ...
Read Project

 13

 FINISHED 

European CYber Security Protection Alliance (CYSPA)

Start date: Oct 1, 2012, End date: Mar 31, 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Read Project

 21

 FINISHED 

Very High Speed Serial Interfaces (VHiSSI)

Start date: Jan 1, 2012, End date: Oct 31, 2014,

Space-based Earth observation and scientific instrumentation currently under development will push the limits of on-board data-handling technology. In the past Mil-Std 1553 and proprietary data-links were used to get instrument data from the instruments to the on-board mass memory unit and to the down-link telemetry system. Over the past decade the proprietary data links have been replaced with a ...
Read Project

 8

 FINISHED 

Long-Term Advanced Propulsion Concepts and Technologies II (LAPCAT-II)

Start date: Oct 1, 2008, End date: Dec 31, 2013,

"Lacpat II is a logical follow-up of the previous EC-project which has as objective to reduce antipodal flights to less than 2 to 4 hours. Among the several studied vehicles, only two novel aircraft for a Mach 5 and 8 flight are retained in the present proposal. Starting from the available Mach 5 vehicle and its related precooled turboramjet, assumed performance figures of different components ...
Read Project

 16

 FINISHED 

Reducing the Vulnerability of Space Systems (ReVuS)

Start date: Mar 1, 2011, End date: Dec 31, 2013,

It is accepted that space debris will increase in the nextdecades despite any considerable effort made to limit their generation.Debris of more than 10cm can be avoided by the satellites and also thevery small particles of less than 0.1cm are taken into account in thecurrent designs. The debris from 0.1 to 10cm is however not predictable,not taken into account today and could severely damage a spa ...
Read Project

 11

 FINISHED 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Read Project

 19

 FINISHED 
geoland2 intends to constitute a major step forward in the implementation of the GMES Land Monitoring Core Service (LMCS). The three components (Local, Continental and Global) of the LMCS are addressed. The goal of geoland2 is (i) to prepare, validate and demonstrate pre-operational service chains and products that will underpin the LMCS, and (ii) to propose and demonstrate a concrete functional o ...
Read Project

 54

 FINISHED 
The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Read Project

 19