Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Hydrogen Mobility Europe 2 (H2ME 2)

Start date: May 1, 2016, End date: Jun 30, 2022,

...ish the conditions under which electrolytic refuelling stations can play a beneficial role in the energy system, and demonstrate the acquisition of real revenues from provision of energy services for aggregated electrolyser-HRS systems at a MW scale in both the UK and France. This has the further implication of demonstrating viable opportunities for reducing the cost of hydrogen at the nozzle by p ...
Read Project

 37

 FINISHED 

Hydrogen Mobility Europe (H2ME)

Start date: Jun 1, 2015, End date: May 31, 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Read Project

 27

 FINISHED 

European Gram Negative Antibacterial Engine (ENABLE)

Start date: Feb 1, 2014, End date: Jan 31, 2020,

...dth of judgment to this important area of research. The programmes are coming from institutions across Europe, initially with seven efforts from public partners, and arising from a novel discovery stage alliance between GSK and Sanofi. These initial programmes to be considered for ENABLE cover a diverse landscape of targets and approaches including natural products, PNA-peptides, synthetic small ...
Read Project

 42

 FINISHED 

Transforming Transport (TT)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Read Project

 48

 FINISHED 

aDverse wEather eNvironmental Sensing systEm (DENSE)

Start date: Jun 1, 2016, End date: May 31, 2019,

... will advance the state-of-the-art significantly and demonstrate the potential of all-weather environment perception.DENSE innovation lies in the provision of a brilliant restored enriched colour image from a degraded infrared image and consequently, this is followed by a variety of application fields for low cost solutions. An important aim is also to close the gap to US developments in the field ...
Read Project

 16

 FINISHED 
...ed application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competitiveness in the global race of automated sy ...
Read Project

 76

 FINISHED 
...re OPENCOSS and SafeCer, which dealt with assurance and certification of software-intensive critical systems using incremental and model-based approaches. OPENCOSS defined a Common Certification Language (CCL), unifying concepts from different industries to build a harmonized approach to reduce time and cost overheads, via facilitating the reuse of certification assets. SafeCer developed safety-or ...
Read Project

 32

 FINISHED 

Sustainable intensive pig and poultry production (PROHEALTH)

Start date: Dec 1, 2013, End date: Nov 30, 2018,

...est interventions across diverse production circumstances.Dissemination activities will encompass all stakeholders in the food chain and establish new e-learning tools. PROHEALTH will deliver novel diagnostics for the propensity to develop production diseases and their occurrence, and multifactorial improvement strategies that can be applied to produce better quality products in a welfare friendly ...
Read Project

 24

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 

FLUIDGLASS

Start date: Sep 1, 2013, End date: Aug 31, 2017,

...lighting. At the same time FLUIDGLASS substitutes conventional HVAC components such as cooling and heating panels.Replacing four different systems by one, FLUIDGLASS brings a significant cost advantage compared to existing solutions.. FLUIDGLASS increases the thermal performance of the whole building resulting in energy savings potential of 50%-70% for retrofitting and 20%-30% for new low energy b ...
Read Project

 11

 FINISHED 
...ghest relevance and at the right location.Access to necessary information, communication with other rescuers and stakeholders as well as the availability of resources are key factors in minimizing damage and loss of life.Large scale disasters and crisis situations increase the requirements on man and material exponentially. Additional challenges, in particular in cross border events, include lang ...
Read Project

 13

 FINISHED 
The proposed pilot line project WAYTOGO FAST objective is to leverage Europe leadership in Fully Depleted Silicon on Insulator technology (FDSOI) so as to compete in leading edge technology at node 14nm and beyond preparing as well the following node transistor architecture. Europe is at the root of this breakthrough technology in More Moore law. The project aims at establishing a distributed pilo ...
Read Project

 32

 FINISHED 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Start date: May 1, 2013, End date: Apr 30, 2017,

... strategic LNG refuelling points in order to guarantee LNG availability for road transport in a simple and cost effective way. The core of the project is the roll out and demonstration of the first stage of the roadmap of four LNG Blue Corridors involves the building of approx. 14 new LNG or L-CNG stations on critical points/locations in the Blue Corridors and the building up of a fleet of approx. ...
Read Project

 27

 FINISHED 
...obust statistical process control system to map control charts, minimize process drift and improve wafer yields.• Upgrading manufacturing capabilities in front- and back-end, and in packaging activity, and tighten process control.• Development of dedicated testing procedures of the VCSEL devices.• Specify and test VCELs for the different applications.The impact of the project is manifold:• The pro ...
Read Project

 9

 FINISHED 

COoperative loGISTICS for sustainable mobility of goods (CO-GISTICS)

Start date: Jan 1, 2014, End date: Mar 31, 2017,

... industrial partners and other stakeholders will jointly implement five services: CO2 Footprint Estimation and Monitoring, Cargo Transport Optimisation, Intelligent Truck Parking and Delivery Area Management, Eco-Drive Support, Priority and Speed Advice. These services will be piloted over one year of real life driving.Each of the pilot sites have full stakeholder chain in their partnership for su ...
Read Project

 33

 FINISHED 

Future of Surface Road Transport European Resarch (FOSTER-ROAD)

Start date: Mar 1, 2013, End date: Dec 31, 2016,

...ety, urban mobility, long distance freight transport, global competitiveness and all issues related to energy and environment.The FOSTER-ROAD activities include project monitoring, strategic research agendas, business case models and innovation plans, coordination of research on European and national level. They include multi-modal issues as well as comprehensive dissemination activities.Overall i ...
Read Project

 17

 FINISHED 
...effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed better regulations (Access or Occupancy management systems). Energy Usage Analysis tools are fairly new on the market. They provide the capability to analyse energy profiles of scattered buildings of large corporations. Energy usage analysis and plann ...
Read Project

 18

 FINISHED 
...ieve high productivity at moderate levels of precision or highest quality at low speeds, but to reach both targets at the same time. Therefore an adequate ultrafast laser source with a very high average power and well-adapted beam parameters, including pulse duration, pulse energy, intensity profile, and polarization, is needed. Additionally, the laser beam has to be applied to the work-piece in a ...
Read Project

 11

 FINISHED 
By bringing together 21 partners including 7 major carmakers, 7 major suppliers, 2 SME's and 5 academia / research centres, ALIVE will develop directly exploitable knowledge on materials and design concepts which offer a high potential for significantly reducing the weight of vehicles for affordable application to high productions volumes, focusing on next generation Electric Vehicles (EVs).Specif ...
Read Project

 26

 FINISHED 

Europe-Wide Platform for Cooperative Mobility Services (MOBiNET)

Start date: Nov 1, 2012, End date: Aug 31, 2016,

...iers to cooperative system-enabled service deployment, including the lack of harmonised services; availability of communication means; inaccessibility and incompatibility of transport-related data; fragmentation of end-user subscription and payment services; proprietary technologies in user devices; etc.MOBiNET will develop solutions for both business (B2B) users and end (B2C) users (drivers and t ...
Read Project

 23

 FINISHED 

Drug Disease Model Resources (DDMORE)

Start date: Mar 1, 2011, End date: Aug 31, 2016,

...ed systems to address the questions researchers, regulators, and public health care bodies face when bringing drugs to patients.The full adoption of MBDD is frustrated by a lack of common tools, languages and ontologies for M&S, which often leads to inefficient reuse of data and duplication of effort by academic, industrial and regulatory stakeholders.The Drug Disease Model Resources (DDMoRe) cons ...
Read Project

 28

 FINISHED 
...s is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders, the moulding of plastics or the thermodynamic properties of hazardous materials requires en ...
Read Project

 96

 FINISHED 

Rapid Analysis and Spatialisation Of Risk (RASOR) (RASOR)

Start date: Nov 11, 2013, End date: Jun 1, 2016,

The Rapid Analysis and Spatialisation Of Risk (RASOR) project will develop a platform to perform multi-hazard risk analysis to support the full cycle of disaster management, including targeted support to critical infrastructure monitoring and climate change impact assessment, exploiting internally produced and available services. RASOR adapts the newly developed 12m resolution TanDEM-X Digital Ele ...
Read Project

 10

 FINISHED 
... CNC machine to manufacture the insoles. The aim of the cooperation is to establish a portal through which scans can be uploaded to the cloud-based software service which then validates the scanned image to produce the design. The experiment will explore the extent to which the service supporting the lifecycle of tailored insole production can be achieved. This will immediately lead to extensions ...
Read Project

 29

 FINISHED 

Enhanced Power Pilot Line - EPPL (EPPL)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

...titive European power semiconductor industry is essential to support the megatrend developments formulated in the Europe 2020 strategy - climate change, energy security, food security, and health and aging population. In practically all these areas, power semiconductors play a vital role. Thus, it is of paramount importance to defend and further extend Europe’s leading position in both power manuf ...
Read Project

 33

 FINISHED 
...llence Centres gather representatives of the different sectors: biomarkers (proteomics, transcriptomics), pharmacodynamic markers ( electrophysiology, psychophysiology, morphological and functional imaging), preclinical model specialists (cellular, transgenic mouse, monkey), clinicians, and clinical pharmacologists.By the end of this (-year project, the following achievements are expected; definit ...
Read Project

 38

 FINISHED 

Future Internet Technologies for MANufacturing (FITMAN)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

...c and flexible Trials Verification and Validation Framework, encompassing concepts, methods and tools for a technical and business assessment of the Trials• An open-to-all FITMAN Phase III Package, to support FI-WARE PPP Phase III objective 1.8, Expansion of Use Cases, by providing access to FITMAN Reports and Prototypes for Phase III preparation and implementation• Three FITMAN Specific Platforms ...
Read Project

 41

 FINISHED 
...trated recommendations and proposes standards.PERSEUS has assembled major users and providers, ensuring privileged access to existing surveillance systems and assets for an optimised coverage of the area of interest. These users will define, assess and validate the alignment of PERSEUS’s recommendations to their needs. PERSEUS also includes an evolution mechanism to enlarge the user base and inte ...
Read Project

 35

 FINISHED 

High Power, high Reliability offshore wind technology (HIPRWIND)

Start date: Nov 1, 2010, End date: Jun 30, 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Read Project

 22

 FINISHED 

SAFER AND FASTER EVIDENCE-BASED TRANSLATION (SAFE-T)

Start date: Jun 15, 2009, End date: Jun 14, 2015,

...addition, the consortium will investigate biologic/mechanistic understanding of DIVI-BMs in severe cardiovascular adverse events (sCVAE) that will allow us predicting drug-induced sCVAE risk by diagnostic kits.The Consortium will establish a database of human BM profiles and a Biobank for supporting future BM R&D.
Read Project

 26

 FINISHED 
...ments and interfaces which will drasticly improve the testability and reliability of ICs.Presently, production testing of ICs is done by large and expensive Automated Test Equipment (ATE). A disadvantage of this approach is that while the production cost of a transistor decreases with each new technology node, the cost to test these transistors remains flat or increases, especially for ICs with an ...
Read Project

 16

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

...e, building upon generic and reusable building blocks developed in earlier research projects. We will demonstrate how this infrastructure supports emerging Future Internet (FI) services in multiple Usage Areas, and will exhibit significant and quantifiable improvements in the productivity, reliability and cost of service development and delivery – building a true foundation for the Future Internet ...
Read Project

 92

 FINISHED 
... builds strongly on previous and on-going work on cooperative systems, which are now considered to be mature enough for large-scale field operational tests. The Europe-wide testing community envisaged for DRIVE C2X comprises of six test sites in Germany, Italy, the Netherlands, Sweden, France and Finland. Essential activities in this project are the testing methodology and evaluation of the impact ...
Read Project

 36

 FINISHED 

Towards Zero Waste in Industrial Networks (ZeroWIN)

Start date: May 1, 2009, End date: Apr 30, 2014,

The first work package will define a common vision on zero-waste entrepreneurship within the first 6 months. The mythos Individual Producer Responsibility will be investigated if it can become the all-healing-solution in electronics industry as well as how this concept can be applied to other industrial sectors. WP2 concentrates on new technological developments, WP3 on waste prevention methodolog ...
Read Project

 33

 FINISHED 
...olution for road transport energy efficiency by developing systems and tools to help drivers sustainably eliminate unnecessary fuel consumption (and thus CO2 emissions), and to help road operators manage traffic in the most energy-efficient way. By applying this combination of cooperative systems using vehicle-infrastructure communication, the project aims to reduce fuel consumption by 20% overall ...
Read Project

 43

 FINISHED 

UniverSelf

Start date: Sep 1, 2010, End date: Nov 30, 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Read Project

 22

 FINISHED 

Internet of Things Architecture (IoT-A)

Start date: Sep 1, 2010, End date: Nov 30, 2013,

Description The Lighthouse Project IoT-A proposes the creation of an architectural reference model for the IoT as well as the definition of a set of key building blocks to lay the foundation for a ubiquitous IoT.There has been much hype about the “Internet of Things”. The idea of a globally interconnected continuum of devices, objects and ...
Read Project

 20