Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
4RinEU will define robust, cost-effective, tailorable deep renovation technology packages supported by usable methodologies, feeding into reliable business models. The project will minimize failures in design and implementation, manage different stages of the deep renovation process, from the preliminary audit up to the end-of-life, and provide information on energy, comfort, users’ impact, and in ...
Read Project

 13

 FINISHED 
NewSOL proposal addresses the specific challenge towards high efficiency solar energy harvesting by advance materials solutions and architectures that are in line with those specified in SET-plan. Its main objective is to develop advance materials solutions based on innovative storage media and concepts for Concentrated Solar Power (CSP) up to validation in field of their performance by real time ...
Read Project

 14

 FINISHED 
Offshore wind business competitiveness is strongly related to substructures and offshore logistics. DEMOGRAVI3 addresses these areas through a very promising solution called GRAVI3.GRAVI3 is an innovative hybrid steel-concrete offshore sub-structure for transitional water depths between 35 and 60m. It will sustainably reduce the levelized cost of energy by up to 15% by combining the following vect ...
Read Project

 11

 FINISHED 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Read Project

 42

 FINISHED 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Read Project

 32

 FINISHED 
The project is focused on efficient integration of city districts with industrial parks through smart thermal grids. The overall objective of the project is to demonstrate a highly replicable, cost-effective and high energy efficiency large scale energy generation system that will allow sustainable urban planning of very low energy city districts.The main focus of the project is medium (150-400ºC) ...
Read Project

 13

 FINISHED 
"A scalable, replicable, high energy efficient, zero emissions and cost effective SYSTEM to refurbish existing public-owned non-residential buildings to achieve at least 50% energy consumption reduction through:a) A systemic methodology for optimal building retrofitting towards zero emissions, developed to ensure cost effectiveness, scalability and replicability of the interventions taking into ac ...
Read Project

 18

 FINISHED 
Buildings consume about 40% of total final energy in Europe, and those built before 1980 represent 95% of this energy consumption. The low renovation rate of building stock (1% per year) means that boosting energy efficient buildings’ retrofitting is the only way to reach EU’s “20-20-20” targets. The higher impact will be achieved through interventions in non-residential buildings, as their energy ...
Read Project

 22

 FINISHED 
SUPRAPOWER is a research project focused on a major innovation in offshore wind turbine technology by developing a new compact superconductor-based generator.The project aims to provide an important breakthrough in offshore wind industrial solutions by designing an innovative, lightweight, robust and reliable 10 MW class offshore wind turbine based on a superconducting (SC) generator, taking into ...
Read Project

 11

 FINISHED 
...of these technologies.To reach such objectives, the project will join a 10 partnership European consortium, industry led by three global wind turbine manufacturers and wind farm operators, GAMESA and ACCIONA WINDPOWER and ACCIONA ENERGIA, in cooperation with the floating systems developers IDEOL and NAVANTIA, the contribution of OLAV OLSEN and STUTTGART UNIVERSITY for structural design, and suppor ...
Read Project

 10

 FINISHED 

Building-integrated fibre-reinforced solar technology (BFIRST)

Start date: May 1, 2012, End date: Apr 30, 2016,

BFIRST project will deal with the design, development and demonstration of a portfolio of innovative photovoltaic products for building integration, based on cell encapsulation within fibre-reinforced composite materials. Currently available photovoltaic products will be expanded with new standardized solutions developed to a pre-industrial stage.Composite material manufacturing and cell encapsula ...
Read Project

 9

 FINISHED 

Logistics for Energy Crops' Biomass (LOGISTEC)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

Cost-efficient, environmental-friendly and socially sustainable biomass supply chains are urgently needed to achieve the 2020 targets of the Strategic Energy Technologies-Plan of the European Union, which are likely to be impeded by the potential scarcity of lignocellulosic biomass from agriculture. Innovative techniques for crop management, biomass harvesting and pre-treatment, storage and transp ...
Read Project

 24

 FINISHED 
PV CROPS addresses 3 key objectives of the call topic:1) Improvement of performance, reliability and lifetime2) Cost reduction of PV systems3) Better integration of PV into gridThe 2 first objectives lead to a lower Levelized Cost of Energy, LCoE. So, the main objectives of PV CROPS are:1- Reduction of 30% of the LCoE of PV to achieve 0.14-0.07 €/kWh by 2020 and 0.20–0.09 €/kWh by 2015 and an incr ...
Read Project

 12

 FINISHED 

High Power, high Reliability offshore wind technology (HIPRWIND)

Start date: Nov 1, 2010, End date: Jun 30, 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Read Project

 22

 FINISHED 
The key objective of the TROPOS project is the development of a floating modular multi-use platform system for use in deep waters, with an initial geographic focus on the Mediterranean, Tropical and Sub-Tropical regions but designed to be flexible enough not to be limited in geographic scope.The TROPOS approach is centered on the modular development where different types of modules can be combined ...
Read Project

 21

 FINISHED 
Background The need to optimise energy consumption in the home is widely recognised, but more work is needed. Information and communication technology and tools, in particular, represent a great opportunity for improving energy use and efficiency in the housing sector. Energy consumption is an important criterion to consider in new construction projects a ...
Read Project

 6

 FINISHED 
The ambition of this project is to enable the utilisation of the full potential of renewable energy (up to covering 100% of the energy demand on district level). In order to reach this goal, the E-hub concept is developed, which is crucial for the implementation of such a large share of renewables. An E-Hub is a physical cross point, similar to an energy station, in which energy and information st ...
Read Project

 19

 FINISHED 
PIME’s is a CONCERTO joint proposal from Salburua community in Vitoria (ES), Dale community in Sandnes (NO) and Szentendre community in Szentendre (HU). The three communities will work together on RTD, demonstration and dissemination in order to maximise the effect of the measures implanted and the impact of the individual projects. The project has 14 partners from 4 countries. The proposal unites ...
Read Project

 14

 FINISHED 

Marine Renewable Integrated Application Platform (MARINA Platform)

Start date: Jan 1, 2010, End date: Jun 30, 2014,

MARINA is a European project dedicated to bringing offshore renewable energy applications closer to the market by creating new infrastructures for both offshore wind and ocean energy converters. It addresses the need for creating a cost-efficient technology development basis to kick-start growth of the nascent European marine renewable energy (MRE) industry in the deep offshore – a major future gl ...
Read Project

 18

 FINISHED 
... the Biomass Action Plan, SET plan and other related European policies. In order to reach the objectives, the project is led by a globally known industrial promoter of renewable energy installations, Acciona Energía from Spain, gathering a partnership with the most experienced European developer of industrial feeding systems from Finland, an SME with demonstrated experience in high technology boil ...
Read Project

 7

 FINISHED 
The use of renewable energy in the building sector is today dominated by the application of solar domestic hot water and PV systems in single-family houses. In order to significantly increase the use of renewable energy in the building sector, concepts have to be developed for large buildings. In these buildings high fractions of the energy demand can only be met with renewable energy sources, whe ...
Read Project

 27

 FINISHED 
Wind energy is the most developed of a number of renewable energy technologies, with several thousands of wind turbines already operating or being planned for construction across Europe. Wind turbines can be deployed individually to power a single site or installation, but are most commonly grouped together as wind farms to provide power to the electricity grid. The energy output from wind turbine ...
Read Project

 15

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 
Nowadays, wind power has an increasing share in the electricity generation mix in several European countries. Due to the intermittent nature of wind, the large-scale integration of wind power causes several difficulties in the management of a power system. Often, a high level of reserves is allocated to account for wind power variability, thus reducing the benefits from the use of wind energy.Toda ...
Read Project

 22

 FINISHED 

Small hydro action for the promotion of efficient solutions (SHAPES)

Start date: Dec 1, 2007, End date: Nov 30, 2009,

The overall objective of SHAPES is to facilitate and strengthen the co-operation between EU Small Hydropower (SHP) Research and Market actors, with the overall objective of streamlining future research & development and promote R&D results in order to enhance penetration of SHP and know-how with the EU and on new markets in developing countries. The SHAPES action is highly relevant with the aim of ...
Read Project

 10