Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through...
Read Project

 39

 FINISHED 
PROTECTED aims to develop expertise and protective capabilities against Endocrine Disruptors (EDs). EDs and their mixtures are a modern day health concern leading to failing ecological systems, poor agricultural production and health effects such as obesity, cancer and infertility. While analytical methods have advanced enormously, focus has been mainly on synthetic chemicals, overlooking emerging...
Read Project

 11

 FINISHED 
The challenges facing society in urban wastewater management cannot be solved by any one sector alone. ALICE (AcceLerate Innovation in urban wastewater management for Climate changE) will accelerate innovation by bringing together and exchanging knowledge between the key players who can, together, address the future techno-economic, governance and societal challenges arising from climate change. I...
Read Project

 13

 FINISHED 

DEMOnstration for Tidal Industry DErisking (DEMOTIDE)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The European tidal industry is at a critical stage. Successful demonstration of small-scale tidal arrays with lessons learnt for future large-scale projects is widely acknowledged as a key way to de-risk and kick-start the tidal energy industry. The DEMOTIDE project will design, build and operate a 4 x 1.5MW (6MW) turbine array at the MeyGen Phase 1B site, Pentland Firth, Scotland. The potential f...
Read Project

 6

 FINISHED 
Severe ocular disorders are affecting the lives of more than 100Mill people world-wide and at least 25% of the population above 70 years of age, a growing demographic group in EU. More than 8 million people lose their lives to cancer every year, making cancer a leading cause of pre-mature mortality in the world. The main hallmarks of severe eye conditions (i.e angiogenesis, inflammation and vascul...
Read Project

 18

 FINISHED 

Open transPREcision COMPuting (OPRECOMP)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Guaranteed numerical precision of each elementary step in a complex computation has been the mainstay of traditional computing systems for many years. This era, fueled by Moore's law and the constant exponential improvement in computing efficiency, is at its twilight: from tiny nodes of the Internet-of-Things, to large HPC computing centers, sub-picoJoule/operation energy efficiency is essential f...
Read Project

 10

 FINISHED 
Current food quality and safety testing is, to a large extent, an inefficient, expensive and ineffective process, unable to assure food safety for all consumers and unable to prevent major food fraud incidents. A paradigm shift in quality and safety testing is urgently required in order to free resources for an intensified combat against fraud in the food chain. As an enabling technology solution,...
Read Project

 7

 FINISHED 
Weight reduction and cost savings have driven composites research towards a number of recent high profile achievements. The increased use of anisotropic AL/CFRP/Ti stacks in aircraft structures has in turn created enormous challenges for the industry due to the difficulties that arise from drilling these heterogeneous stack materials. The project “European and Chinese Platform for Stacked Aero-Str...
Read Project

 4

 FINISHED 

Translational Research Network in Prostate Cancer (TransPot)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The Translational Research Network for Prostate Cancer (TransPot) program adopts an innovative, multidisciplinary approach, providing highly sought-after, effective solutions for incurable prostate cancer (PC).The TransPot scientific objective is to obtain an unmatched depth of molecular, mechanistic and informatics systems-level disease understanding in order to improve the prognosis and treatmen...
Read Project

 11

 FINISHED 
Colorectal cancer (CRC) is the 3rd most common cancer in Europe, and with approximately 200,000 deaths per year, it remains the 2nd most common cause of cancer death. More than half of all CRC patients develop distant metastases and have 5-year overall survival (OS) of less than 5% because of ineffective treatments. Increased understanding of cancer biology, coupled with the implementation of “omi...
Read Project

 13

 FINISHED 

Educational Network in Ocular Drug Delivery and Therapeutics (OcuTher)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

Ocular drug development has transformed from niche area to a major field in drug development in which many companies, including European big pharma has entered recently. Ocular drug development is a unique field in terms of drug targets and end-points of activity, local drug administration routes, tissue barriers and pharmacokinetics, drug delivery and formulation challenges and local toxicity iss...
Read Project

 9

 FINISHED 
The European aerospace, automotive, and rail industries are committed to improving their energy efficiency to meet targets set within the EU’s climate, energy and transport policies. This is motivating the increased use of lightweight composite materials in lieu of heavier metallics. To implement this transition, these industries must reach, at least, the same level of crash performance achieved w...
Read Project

 9

 FINISHED 

Training in Cancer Mechanisms and Therapeutics (TRACT)

Start date: Oct 1, 2016, End date: Sep 30, 2020,

The European community requires early stage researchers (ESRs) trained in next-generation technologies for improved detection and treatment of oral and oesophageal cancers. The number of oral cancers diagnosed in the EU has increased by over 75% in the last 30 years, with long-term survival rates of only 50%. This is typically due to the late diagnosis of the disease and resistance to current ther...
Read Project

 5

 FINISHED 

War and the Supernatural in Early Modern Europe (War and Supernature)

Start date: Mar 1, 2016, End date: Aug 31, 2020,

The debates of intellectuals both Catholic and Protestant have much to tell us about the nature of religious warfare in early modern Europe. In the seventeenth century, the small numbers of radical Catholics and Protestants who favoured imposing their own version of Christianity on others by force were accused by moderates (no less religiously sincere) within their own communities of promoting war...
Read Project

 1

 FINISHED 

iABC Programme (IABC PROGRAMME)

Start date: Aug 1, 2015, End date: Jul 31, 2020,

Cystic Fibrosis (CF) is a common fatal inherited disease with a frequency of 1 in 2500 live births, affecting approximately 36,000 (0.737/10,000) people in the EU. Chronic bacterial pulmonary infection leading to an irreversible decline in lung structure and function is the main cause of mortality and morbidity in patients with CF, with more than 95% of deaths due to respiratory failure. Pseudomon...
Read Project

 21

 FINISHED 
The overall goal of the RE4-Project is to promote new technological solutions for the design and development of structural and non-structural pre-fabricated elements with high degree of recycled materials and reused structures from partial or total demolition of buildings. The developed technology will aim at energy efficient new construction and refurbishment, thus minimizing environmental impact...
Read Project

 14

 FINISHED 

Preventing and mitigating farmed bivalve diseases (VIVALDI)

Start date: Mar 1, 2016, End date: Feb 29, 2020,

The overarching goal of VIVALDI is to increase the sustainability and competitiveness of the European shellfish industry by improving the understanding of bivalve diseases and by developing innovative solutions and tools for the prevention, control and mitigation of the major pathogens affecting the main European farmed shellfish species: Pacific oyster (Crassostrea gigas), mussels (Mytilus edulis...
Read Project

 21

 FINISHED 
New materials are now opening clinical treatments in which a temporary scaffold is used to support regeneration of healthy tissue. The specific need that inspires our research is for thinner and stronger bioresorbable vascular scaffolds (BVS) for coronary heart disease. BVS are poised to replace metal stents due to the excellent clinical outcomes: beyond keeping the vessel open during the first s...
Read Project

 3

 FINISHED 

High-Intensity Coherent Nonlinear Optics (HICONO)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

Optical laser-based technologies are a key technology of the 21st century. Extension of the range of scientific and commercial laser applications requires a constant expansion of the accessible regimes of laser operation. Concepts from nonlinear optics, driven with ultra-fast lasers provide all means to achieve this goal. However, nonlinear optics typically suffer from low efficiencies, e.g. if hi...
Read Project

 9

 FINISHED 
CELTTUS aims to educate, inform and further enhance the public’s awareness and knowledge of the European Union in Northern Ireland. Levels of awareness of the EU in Northern Ireland are very low, particularly among 16-25 years old. This project helps bridge that gap with its five core objectives:1. to firmly anchor EU studies in the university curriculum; 2. to introduce a new module on the EU d...
Read Project

 1

 FINISHED 

Systemic Action for Gender Equality (SAGE)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Increasing the participation of women in research, and promoting gender equality, is vital in strengthening the competitiveness of European research. A greater involvement of women in research will contribute not only to an increased number of skilled researchers in our institutions, but will also add a different perspective to research programmes, promote diversity, improve descion-making and con...
Read Project

 7

 FINISHED 
Age-related macular degeneration (AMD) is the world’s most important age-related blinding disorder. The current proposal utilises epidemiological data describing clinical phenotype, molecular genetics, lifestyle, nutrition, and in-depth retinal imaging derived from existing longitudinal European epidemiological cohorts and biobanks to provide three major insights needed for long-lasting prevention...
Read Project

 13

 FINISHED 

Novel Stromal Cell Therapy for Diabetic Kidney Disease (NEPHSTROM)

Start date: May 1, 2015, End date: Apr 30, 2019,

Type 2 diabetes will affect >500 million adults by 2040 and its secondary complications will generate enormous socioeconomic costs - in particular, diabetic kidney disease (DKD), which is already the most common cause of chronic kidney disease. DKD is associated with greatly increased mortality and frequently progresses to end stage renal failure. Pharmacotherapy, dialysis and transplantation repr...
Read Project

 12

 FINISHED 
The increase of the elderly population leads to increased prevalence of frailty, risk for poor health outcomes, and related health and social care costs. Lack of physical activity (PA) and established sedentary behaviours (SB) constitute an additional burden, as they are related to progression of chronic disease and disabling conditions. An existing initiative to battle SB and insufficient PA leve...
Read Project

 7

 FINISHED 

PARAGONE: vaccines for animal parasites (Paragone)

Start date: Apr 1, 2015, End date: Mar 31, 2019,

Helminth and ectoparasitic infections of ruminants and poultry have a huge impact on the biological efficiency of these vital food sources. Indiscriminate antiparasitic use has led to drug resistance across the globe. The main alternative to the dwindling supply of antiparasitics is vaccines. Here, in the PARAGONE project, findings from previous EU and other-funded projects on parasite vaccine dev...
Read Project

 19

 FINISHED 
The GLAUrious project is promoting the novel External Automatic Glaucoma Laser (EAGLE) device with the goal of providing accessible first-line treatment for glaucoma.Glaucoma, a chronic disease causing progressive optic nerve degeneration, is the leading cause of irreversible blindness globally. Although incurable, disease progression is delayed by reducing intraocular pressure, thus preventing bl...
Read Project

 5

 FINISHED 

"City-zen, a balanced approach to the city of the future" (CITY-ZEN)

Start date: Mar 1, 2014, End date: Feb 28, 2019,

"City-zen deals with the development of the city of the future. The project has three major goals, 1- to realize more effective collaboration models and a methodology for development of smart cities, 2- to connect with industry, and have them develop technology to the benefit of smart cities and 3- to showcase to society ambitious pilot projects. Main idea for this project is that after successful...
Read Project

 23

 FINISHED 
A key challenge in improving life-long learning, employee flexibility, and skill-matching is the assessment of workplace relevant competencies and the planning of individual learning paths for career development. The aim of this project is to develop a personalised learning environment for career development. The environment will provide assessment of transversal competencies and social capital to...
Read Project

 10

 FINISHED 
VINEYARD will develop an integrated platform for energy-efficient data centres based on new servers with novel, coarse-grain and fine-grain, programmable hardware accelerators. It will, also, build a high-level programming framework for allowing end-users to seamlessly utilize these accelerators in heterogeneous computing systems by using typical data-centre programming frameworks (e.g. MapReduce,...
Read Project

 11

 FINISHED 
The project’s principal aim is the development of UniServer: a universal system architecture and software ecosystem for servers. UniServer will facilitate the evolution of the Internet from an infrastructure where data is aggregated to centralized data-centres to an infrastructure where data are handled in a distributed and localized manner close to the data sources. UniServer will realize its bol...
Read Project

 10

 FINISHED 
The REMEDIATE ETN comprises 10 beneficiaries (from 5 EU Member States – the UK, Ireland, Germany, Denmark, and Italy) and 15 partner organisations. The beneficiaries and partner organisations are committed to the provision of innovative research and training for more cost effective and sustainable remediation of contaminated land. It is a multidisciplinary collaboration between internationally ren...
Read Project

 10

 FINISHED 

Secure Architectures of Future Emerging Cryptography (SAFEcrypto)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

SAFEcrypto will provide a new generation of practical, robust and physically secure post quantum cryptographic solutions that ensure long-term security for future ICT systems, services and applications. Novel public-key cryptographic schemes (digital signatures, authentication, public-key encryption, identity-based encryption) will be developed using lattice problems as the source of computational...
Read Project

 8

 FINISHED 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Start date: Jan 1, 2014, End date: Dec 31, 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Read Project

 64

 FINISHED 
Forensic detection of the illicit use of drugs in performance and food-producing animals is experiencing critical shifts in paradigms with a growing threat in the form of new compounds emerging from human drug development and clinical applications. The MET-A-FOR project will be the first European training platform solely focussed on the development and practical advancement of animal forensic test...
Read Project

 2

 FINISHED 
MultiCoop is aimed at promoting new opportunities for participating partners (VSCHT, QUB and BOKU) by development of levels of excellence and expertise of all three institutions in the field of comprehensive food and feed safety assessment. A major focus will be in enhancing the range of competences of VSCHT. The main objectives and goals of the project are (i) the establishment of close links bet...
Read Project

 3

 FINISHED 
The main aim of the ENACT project is to combine computer simulation with materials synthesis and experimental characterization to optimize the design of liquid-phase systems for chemical technologies. By optimization, we understand an improvement in efficiency, sustainability and environmental impact. The quest for such processes is rapidly becoming a necessity in a global scale. Air pollution, en...
Read Project

 3

 FINISHED 

Industrial optimal design using adjoint CFD (IODA)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Adjoint-based methods have become the most interesting approach in numerical optimisation using Computational Fluid Dynamics (CFD) due to their low computational cost compared to other approaches. The development of adjoint solvers has seen significant research interest, and a number of EC projects have been funded on adjoint-based optimisation. In particular, partners of this proposal are member...
Read Project

 10

 FINISHED 

Next Generation Digital Mock-Ups for Multi-Physics Simulation (MUMPS)

Start date: Dec 1, 2016, End date: Nov 30, 2018,

ACARE’s vision 2050 for aerospace requires technological leadership in terms of managing the complexity of multidisciplinary design and development. Computational Simulation is essential to meet these challenges, but setting up complex numerical simulations for large assembly structures is extremely time-consuming and requires highly-skilled engineers. Even though solve time is often used as a key...
Read Project

 1

 FINISHED 
IMPRESS will develop three different prefabricated panels for buildings: (i) a polyurethane based insulated panel with improved thermal performance and light radiation and (ii) a thin, lightweight pre-cast concrete sandwich panel, with optimum thermal and weathering resistance, both of which are suitable for overcladding; (iii) a lightweight pre-cast concrete sandwich panel incorporating Phase Ch...
Read Project

 16

 FINISHED 

Structure and Ecological Niche in the Soil Environment (SENSE)

Start date: Nov 1, 2014, End date: Oct 31, 2018,

SENSE (Structure and Ecological Niche in the Soil Environment) is a groundbreaking project to discover the processes affecting soil animal diversity and how soil biodiversity affects ecosystem stability and function. SENSE tackles the challenging enigma of soil animal diversity (exceptionally high diversity in an apparently much less diverse environment), studying the effect of soil structural com...
Read Project

 1